Showing posts with label bathroom renovation. Show all posts
Showing posts with label bathroom renovation. Show all posts

Wednesday, January 9, 2008

It's functional!!

the now "infamous" bathroom ...










which began as a pile of rubble in the garage after we tore it totally apart.













There was insulation hanging at half mast when we took off the ceiling ... so we had to keep going ... right up to the roof .. and even outside into the ridge vent ... (the roof was being re-done by roofers working above us while we ripped out the whole bathroom.)










and dry rot under the shower curb ....

..... then we had to take up all of the floor to get at plumbing, electrical wiring, heating ducts, etc... and most of the basement is finished..so had to be careful not to touch the top portion of the basement ceiling drywall... ..it was a huge undertaking. Not without mishaps, frustrations, injuries, and tears aplenty let me tell you.










more of the renovation .... just click.

So, finally after a year and a half... all plumbing is now functional. We had a few leaks in the faucets and connections so very near the end of it all .. ... but finally got everything working perfectly. Strangely we had no leaks in all the other major plumbing we did way back at the rough-in stage. Damn connectors! Why couldn't they all work properly. And..had to send the tub faucet all the way back to Germany and wait 6 weeks for the second one to show up. A small flaw in the chrome and another dribble....sigh...













There is still a cabinet to build beside the sink, that also will house a laundry chute.. ... and work to do between the sconce lights... and a few other small things... but for the main part it is finished. What a relief!









our European spa look



A job of this magnitude is not for the faint of heart, as we did it all ourselves. The only thing we did not do was install the shower glass. Sometimes I wish we had been filming some of the antics ..... but then .. maybe not. Although two smallish people hoisting a 10 foot sheet of drywall for the ceiling can be pretty amusing ..... I think I probably shrunk another inch under the weight of that one... ..














We did it!

Saturday, May 12, 2007

Today as I was putting sealant on the new tile grout in the bathroom...climbing my ladder and stretching all out of shape....I found myself wondering if Michaelangelo had to lie on his back for 4 years to do the Sistine Chapel. How ludicrous! Like there could be any comparison!

This was pretty silly too.... look at the obstacle course I had to navigate just to get my little ladder.



See it waaaaay at the back against the wall? ...... no?.....c'mon, I will clamber over some stuff and then you can ....







.......... see it now?

And, somewhere to the left of all that..is my motorcycle under tarps. Just as well I can't ride right now with this bad foot, or I would be hopping up and down.

Ooooweee, that got me stretched out...just getting to that. My foot definitely didn't like it, bobbing and weaving on uneven surfaces. %^&@

Boy, am I glad it is spring... soon I will be able to tidy and hose down the garage and move a lot of that "stuff" into the shed. In all fairness..we did need most of it during the winter to continue with our bathroom renovation...which we began last June. I guess it is a good thing we have another bathroom to use..... almost a year now.

First coat of sealant is done; tomorrow I will be at it for another few hours... bears, dolls and all the fun stuff is on the back burner for the moment. The guys are coming next week to install the shower glass.... this needs to be finished and well dried. A few weeks more.. ... tub, sink and toilet.... not long now til our beautiful bathroom is finished. Yaaaaaay!!! What a huge job we took on and we are so proud to have done it all ourselves. I know it is not that thrilling to most people...but you who have done some minor renovations ....you know what I am talking about. To see labour intensive...check out the Bathroom album...