Steel structure building
LGS construction can offer a much more predictable construction schedule and less on-site cost than traditional construction methods. For example, as the material is lightweight, no heavy lifting equipment is needed on-site, frames, trusses and joists can typically be carried into place by on-site labor. Frames are made to precise dimensions meaning pre-made windows, doors and bathrooms will fit perfectly and quickly reducing engineering cost and minimizing room for error on-site.