A Florida nuclear power plant developer says it’s scouting northern Iowa to build a “multi-billion dollar” facility that would generate 1,000 megawatts of energy, potentially powering homes and ... .
Work continues to incorporate results from the earlier 2025/2026 Puro Corazon drilling into the larger Cerro Las Minitas Project, which is expected to enhance the project economics and the scalability of the mine plan.
the 280.73 to 308.87 metre zone lies 23 to 35 metres from historical intercepts at the same depth; Cerro Grande 1 is now traced from near surface to about 290 metres vertical depthStep-out of about 45 metres from Hole AG-CG-PH2-002.
Una ni�a de unos doce a�os ha sufrido una ca�da por un cerro desde una altura aproximada de 30 metros en la localidad granadina de Guadix cuando intentaba coger un tel�fono m�vil ....
The board approved the creation of a work study group on the issue that will include representatives from the county and Clear Lake PSAPs as well as some elected officials ... .
The board approved the creation of a work study group on the issue that will include representatives from the county and Clear Lake PSAPs as well as some elected officials ... .
The Cerro GordoCounty Board of Supervisors approved a speed limit reduction on Thrush Avenue near Portland on Monday but postponed action on a proposed change to 300th Court after residents raised concerns about traffic safety ... .