A mechanical fault left a Bass Strait cargo vessel without steering for more than eight hours after the crew was unable to use an available backup steering system because the master had not been ...
OEG has secured a long-term multi-million-dollar contract extension with a global operator to support its offshore drilling operations in the Bass Strait field, Australia, until the end of field life, expected to be in 2036 ... .