... The Sub-Committee endorsed a proposed timescale which would see the live testing of the Arctic NAVAREA/METAREA operations in 2009 and 2010, with a milestone goal of "Full Operational Status" being declared at COMSAR 15 in 2011 ... .
... required by crew and passengers, were adopted by the Facilitation Committee when it met for its 35th session, the first session as a fully institutionalized body of the IMO (see Briefing 01/2009).