Work on the HaryanaOrbitalRailCorridor tunnel in Nuh remains halted pending land acquisition and a new design after a sixth cave-in reached village homes on Sunday ... Haryana Orbital Rail Corridor.
Gurgaon. A major cave-in occurred for the second time in six days at an under-construction tunnel of HaryanaOrbitalRailCorridor (HORC), damaging homes in Nuh district ... The tunnel is being constructed at an estimated cost of around Rs 1,200 crore ... .