News

Nearly 50% of the fourth desalination plant in Perur is complete, aiming to provide 24x7 water supply in Adyar zone.
CMDA plans a ₹9.12-crore makeover for Porur Lake, integrating conservation, infrastructure, and community engagement for ...
Chennai: Chennai Metro Rail Limited on Monday conducted a trial run of a driverless train beyond Mullai Thottam up to Porur junction on corridor 4 of .
Chennai Metro Rail Limited (CMRL) on Monday commenced the testing and beyond Mullai Thottam Metro Station, up to Porur Junction Metro Station in the Corridor 4 of the Phase-2 project, says a release.
CHENNAI: Chennai Metro Rail has commenced trial operations along the 9.1km stretch from Poonamallee to Porur, part of its Rs 63,246 crore ($7.6bn) Phase II expansion, on Monday evening.