News

GWR’s FastCharge electric train trial finds success. Earlier this month, GWR’s first electric train traveled 138km (86 miles) without recharging, besting the previous UK record held by a ...
Travel; UK & Ireland; Railways; Inside the new £400m UK train line that will never be used by normal passengers The new £400million project, in the mountains of Neath Port Talbot, will have ...
Temperatures in the UK on Tuesday shattered records, reaching a high of 104.36 degrees Fahrenheit. The extreme heat can cause railway tracks to buckle in the scorching temperatures.