TEST REPORT
Project Name: World Trade Center, Qatar
Main Contractor Plant Reference
Location & Equipment Tag No
: : :
Consultant Report No Inspection Date: Results Actual Comply Not Comply
: : :
Sl.No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Manufacturer
Data
Design /Approved
Remarks
Serial Number Model Number Number of Fans Type Total Flow in CFM Total Static Pressure in w.g. Motor HP Volts / Phase / Hertz Rated Amps RPM Service Factor Operating Voltage Operating Amps Suction Static Pressure in w.g. Suction Static Pressure in w.g.
Remarks / Comments
SIGNATORIES TESTED BY CHECKED BY INSPECTED BY WITNESSED BY
ORGANIZATION EFECO ITAB WTC QA/QC ARAB TEC MZ & PARTNERS
NAME
SIGNATURE & DATE