0% found this document useful (0 votes)
106 views2 pages

Section 3 Contract Data

This document outlines key details of a contract for a municipal infrastructure improvement project in Kathmandu, Nepal. It specifies: 1) The parties to the contract including the employer, engineer, and contractor (once named). 2) Timelines for the project including a start date, intended completion date of 7 months, and a defects notice period of 180 days. 3) Requirements for the contractor including submitting a work program within 14 days and retaining a performance security of 5% of the contract price. 4) Financial terms such as advance payment of 15% of contract price within 14 days, liquidated damages of NRs. 15,000 per day, and withholding 10% of payments for

Uploaded by

2003_335
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
106 views2 pages

Section 3 Contract Data

This document outlines key details of a contract for a municipal infrastructure improvement project in Kathmandu, Nepal. It specifies: 1) The parties to the contract including the employer, engineer, and contractor (once named). 2) Timelines for the project including a start date, intended completion date of 7 months, and a defects notice period of 180 days. 3) Requirements for the contractor including submitting a work program within 14 days and retaining a performance security of 5% of the contract price. 4) Financial terms such as advance payment of 15% of contract price within 14 days, liquidated damages of NRs. 15,000 per day, and withholding 10% of payments for

Uploaded by

2003_335
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

SECTION 3

CONTRACT DATA
The following documents are also part of the Contract : Clause Reference
The Bid and Letter of Acceptance [1]
The Condition of Contract [1]
The Technical Specifications
The Drawings
The rogram [!!]
The riced Bill of "uantities [#!]
The Schedule of $perating and %aintenance %anuals [&1]
The Schedule of $ther Contractors [']
The Schedule of (e) ersonnel [*]
The Schedule of Ta+es [#*]
The ,mplo)er is
-ame : %unicipal .nfrastructure .mpro/ement ro0ect
Address: (ha !1###2 Tahachal2 (athmandu
The ,ngineer is [3] [&]
-ame : ,astConsult 45 Ltd6
Address: 6$6 Bo+ 11*!2 La7impat2 (athmandu
The Contractor is [1] [3]
-ame :
Address:
The Start Date is 8888888888888888888888888888 [1&]
The .ntended Completion Date for the whole [1&] [!#]
of the 9or:s is 7 (Seven) months
The Contractor is to su;mit the program for the 9or:s [!!]
within 14 da)s of ;eing notified of the acceptance of his ;id6
The Ta+ shall mean the Contract Ta+ [#*]
The Site ossession Date is 8888888888888888888888888888888 [1*]
The Site is located at(athmandu Cit) and
is defined in the drawings
[1]
#11
The Defects -otice eriod is 180 da)s [#<]
The period ;etween program update is #< da)s [!!]
The amount to ;e withheld for late su;mission of an updated program is &
percent of the running ;ill [!!]
The law which applies to the Contract is the law of -epal [#]
lace where ar;itration will ta:e place : (athmandu2 -epal [!1]
The proportion of pa)ments retained is &= of each monthl) pa)ment
including final certificates6 [3!]
The li>uidated damages for the whole of the 9or:s are -Rs6 !<2<<< per
da) [3#]
The ad/ance pa)ment will ;e 1<= of contract price and will ;e paid to the
contractor not later than #< da)s after the signing of Contract Agreement [33]
The ad/ance pa)ment shall ;e repaid with percentage deductions from the
interim pa)ments at !<= of the ;illed amount starting from the first
interim pa)ment alwa)s pro/ided2 that the loan shall ;e completel) repaid
prior to the e+piring of original time of completion6
The performance securit) shall ;e for the minimum amount e>ui/alent to
fi/e percent of the contract price6
The date ;) which ?as ;uilt? drawing manuals are re>uired is @< da)s after
the completion of the wor:s6
[&1]
The amount to ;e withheld for failing to produce ?as ;uilt? drawing ;) the
date re>uired is -epali Rupees Aour hundred thousands 4Rs6 3<<2<<<6<<5
[&1]