This document provides a status update on the technical specifications for the Grande Katende power plant project. It lists 8 key components of the project including circuit breakers, transformers, isolators, and control panels. For each component, it shows the dates when the specifications were submitted and responded to, and whether the project management committee's approval is still awaiting or has been received. The majority of the components are still awaiting final approval from the committee as of June 2015.

Uploaded by

crazy devil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views1 page

Tech Spec of Transformer

This document provides a status update on the technical specifications for the Grande Katende power plant project. It lists 8 key components of the project including circuit breakers, transformers, isolators, and control panels. For each component, it shows the dates when the specifications were submitted and responded to, and whether the project management committee's approval is still awaiting or has been received. The majority of the components are still awaiting final approval from the committee as of June 2015.

Uploaded by

crazy devil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Status of Technical Specification for Grande Katende (4 x 16 MW)

Draft
SL. NO

DESCRIPTION

AIL SUB. /REPLY DATED

REV-1
PMC
COMMENT/APPRO
VAL

AIL SUB. /REPLY DATED

PMC
COMMENT/APPROVAL

132 KV CT

132 KV PT

132 KV SF6 Circuit Breaker

08.10.2014

17.04.2015,

132 KV LA

14.10.2014

16.04.2015,

134 KV Isolator

09.10.2015

17.04.2015,

01.06.2015,

AWAITING

Switchyard Structural Works

03.12.2014

17.04.2015,

01.06.2015,

AWAITING

Outdoor Switchyard material


Control & relay Panel

04.11.2014
email 28.05.2015

16.04.2015,

17.10.2014
10.10.2014

26.12.2014,
17.10.2014
26.12.2014

16.04.2015,

email 11.05.2015

01.06.2015

AWAITING

16.04.2015,

email 11.05.2015

01.06.2015

AWAITING

01.06.2015
email 11.05.2015

01.06.2015

email 11.05.2015
01.06.2015
01.06.2015

AWAITING
AWAITING

AWAITING
AWAITING