RISK ASSESSMENT RECORDING FORM
Location or
Address: Medway road Culcheth
Activity or
Situation media photography
(1)
Hazard
Date Assessment
Undertaken:10/03/16
Review
Date: 10/03/16
Assessment undertaken
By: Reece McCormack
Signature
Risk
(2) Who might be harmed and how?
(3) What controls exist to reduce
risk
Water ruining equipment
1x2
The model or anybody part of the
photo shoot
Make sure that the weather is good
enough to carry out the photoshoot
Tripping over equipment
1x2
The model or anybody part of the
photo shoot
Make sure that anyone around the
equipment knows where the wires
are
Dropping equipment
1x2
This could break the equipment
2
Make sure that the person taking
the photo has the strap around
his/her neck
(4) What action can be taken
to further reduce risk?
1. List hazards something with the potential to cause harm here:
Seek to quantify the level of risk the likelihood of harm arising based on the number of persons affected, how often they are exposed to the hazard and the
severity of any consequence.
2. List groups of people who are especially at risk from the significant hazards which you have identified
3. List existing controls here or note where the information may be found
4. List the risks which are not adequately controlled and the action you will take. Have regard for the level of risk, the cost of any action and the benefit you expect to
gain.
(1)
Hazard
Risk
(2) Who might be harmed and how?
(3) What controls exist to reduce
risk
(5) What action can be taken
to further reduce risk?
RISK RATING
a SEVERITY
b LIKELIHOOD
c FINAL SCORE RATING: what needs to be done
Dying or being permanently disabled
Will almost certainly happen
Serious injury/long term illness
Highly likely to happen
Temporary disability/3 days off sick
Not so likely
Will need medical attention
Even less likely
Minor injury eg. Bruise, graze
Unlikely to happen at all
16-25 Stop! Do not start activity again until risk is
controlled
10-15 High risk level, High priority. Take action
straight away to control the risk
6-9
Medium risk level. Tighten up controls and
make a plan to do something about risk
3-5
Fairly low risk level. Low priority but keep
possible action in mind
1-2
Low or trivial risk. No further action
required.
SO: a x b = c
Action Required
Responsible Person
Date for Completion