CONTRACTOR PERFORMANCE EVALUATION
Rate (as appropriate) on
a scale of:
Scheduling
Coordination of Subcontractor Work
Superintendent
Proactive Resolution of Problems
Fairness in Pricing Changes
Proactive Performance (Diligence)
Timely Completion of Punch List
Timely Pmt/Stop Notices/Complaints
2*
1*
Below Average Non-Responsible
5
Excellent
4
Good
3
Average
OVERALL RATING:
Major Subcontractors/Name:
Electrical /
Mechanical /
Structural /
Framing/Drywall /
Other
Yes
Completed Project Within Contract Time?
Yes
Liquidated Damages Assessed?
Yes
10843 Issued to Contractor?
Yes
Recommend Renewal of Prequalification?
No
Recommend Future Project Size: $
No
No
No
Claims Filed?
Yes
Status of Claim:
Negotiation
No
Claims Review Board
Litigation
*Attach written justification. If subcontractor judged non-responsible, attach separate written report for use in potential ineligibility to bid CSU work.
REMARKS:
This evaluation is based on the impressions of the Trustees assigned Construction Administrator, with information from the Project Architect/ Engineer,
Project Inspector, and/or University representatives.
Signed:
S u b m i t t h i s f o r m t o P r e q u a l i fi c a t i o n C o o r d i n a t o r :
CAPITAL PLANNING, DESIGN and CONSTRUCTION
401 GOLDEN SHORE, LONG BEACH, CALIFORNIA 90802-4210
Construction Mgmt.
703.13 10/06
CONTRACTOR PERFORMANCE EVALUATION
PAGE 2
Construction Administrator
Date