Feasibility of mix / drainage test:
Take the bucket with the aggregate mixture
out of the ofen and mix it manuan thoroughly
for a moment.
Give the aggregate mixture into the mix pan
and clamp that in the mixer (REGO Beating
and mixing machine, Modell: SM 2)
Weighed portion of approximately 1000g
asphalt mixture in a 170 degrees centigrade
tempered and weighed beaker glass (800
milliliter)
Storage of the beaker glass for 1 hour at 170
degrees centigrade in the oven
Among stirring lower the mixing whisk (6 wires)
Dry mixing time of the mineral aggregates is 15
seconds
Admixture of 204g bitumen
After mixing time 105 seconds
After 1 hour the beaker glass should be taken
out of the oven and evacuated
After taking of the mix pan follows a short manual
after mixing time for additional homogenisation
Feasibility of mix / drainage test:
Possible sticking mineral aggregates on the beaker glass have to be removed
and the beaker glass will be weighed
Calculation of the drainage value:
(glass after evacuation minus weight of the empty beaker glass) multiplied by 100%,
divided by weighed portion of asphalt)
For the calculated drainage values are following rules valid:
x < 0,2 very good stabilize effect
0,2 < x < 0,3 acceptable stabilize effect
x > 0,3 insufficient stabilize effect