Hyderabad Metro Rail EHS Risk Assessment

This document provides an environmental health and safety (EHS) risk assessment for grinding activities during the Hyderabad Metro Rail project. It identifies three key hazards: 1) Taking damaged machinery from storage, 2) Providing improper electrical connections, and 3) Performing grinding works without proper safety measures. For each hazard, it lists existing control measures and additional controls to reduce the risk level. The objective is to identify risks and ensure residual risks are low by implementing additional safety actions.

Uploaded by

Rohit Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
372 views1 page

Hyderabad Metro Rail EHS Risk Assessment

This document provides an environmental health and safety (EHS) risk assessment for grinding activities during the Hyderabad Metro Rail project. It identifies three key hazards: 1) Taking damaged machinery from storage, 2) Providing improper electrical connections, and 3) Performing grinding works without proper safety measures. For each hazard, it lists existing control measures and additional controls to reduce the risk level. The objective is to identify risks and ensure residual risks are low by implementing additional safety actions.

Uploaded by

Rohit Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

EHS RISK ASSESSMENT

Ref : HMRP - 08 B Rev 00


Project : Hyderabad Metro Rail
Client : Hyderabad Metro Rail limited
Independent Engineer : Louis Berger Consulting Pvt. ltd
Concessionaire : L&T Metro Rail Hyderabad Limited
Contractor : L&T Construction PT&D IC (POWER SUPPLY & SCADA PROJECT)
Activity considered : Grinding Date: 20.06.13

Severity rating
Hazard / Environment Aspect

Probability
Risk / Residual

rating
Sl.no Activity Existing control measures Imapct Additional Control measures Risk / Action by
Source /
Possible outcome People at risk level Impact
Situation / Act

1) Check for the expiry date of the


grinding wheel
2) Check the RPM levels of machine
1) Prior to issue / taking ensure
& grinding wheel (machine RPM
Flew & damage of Grinding fellow to have fitness for the machine Stores
Taking machinery Damaged should not be more than Wheel
1 wheel & cut & surrounding 4 5 High from P&M dept / EHS Dept Low incharge /
from stores machine RPM)
injuries workmen 2) Do not stack the wheels in Supervsor
3) Check for casing against rotary
wet conditions
parts.
4) Check for physical damages of
machine & cables

1) Get the electrical connections


only from the electrician
Power
Giving supply Workmen using 2) All Electrical connections to be 1) Do not place cables on the
2 distribution Electrocution 4 5 High Low Supervisor
connections machine routed through ELCB of 30mA ground & in wet conditions
board, cable
sensitivity
3) Do not use damaged cables

1) The wheel should be fitted


correctly without any play / jerk
Cut injury, Eye
1) Not using damaged wheels 2) Do not take cables from the
damge, Workmen using Site Engineer
3 Grinding works Machine, cables 2) Using cables with good 4 5 High ground Low
Electorcution, fire machine / Supervisor
insulation & no cut / joints 3) Use Eye & hand protections
etc
4) Remove all flammables near
to the grinidng area

FOR LTC