This inspection and test plan outlines quality control points for an EIFS (exterior insulation and finish system) works project. It lists 6 items to be inspected including approval of EIFS materials, surface preparation, attachment of EPS boards, application of mesh and primers. For each item, it specifies the type of inspection as visual or measurement, references the applicable specification or manufacturer documentation, and identifies acceptance criteria. The plan provides a framework to ensure the EIFS installation meets specifications at key checkpoints.

Uploaded by

sathiyaprasath
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
476 views22 pages

EIFS Works Inspection Guide

This inspection and test plan outlines quality control points for an EIFS (exterior insulation and finish system) works project. It lists 6 items to be inspected including approval of EIFS materials, surface preparation, attachment of EPS boards, application of mesh and primers. For each item, it specifies the type of inspection as visual or measurement, references the applicable specification or manufacturer documentation, and identifies acceptance criteria. The plan provides a framework to ensure the EIFS installation meets specifications at key checkpoints.

Uploaded by

sathiyaprasath
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 22

INSPECTION & TEST PLAN

Project Name :
Activity : EIFS Works ( MS-31 )

Acceptance Criteria /
Reference
Item Quality Control Point Type of Check Specification Clause /
Document
Manufacturer

Review of Specification
1 Approval of EIFS Material documents & MS Vendor List Material Submittal, Pre-Qualification
with RA MS with RA

Final Inspection for Block Work / Visual, Specification Free from Cracks and Hollowness and
2
Check Surface Preparation Measurement Method statement Surface should be Smooth and Flat

Fixing of EPS Board with Fiber


Visual, Specification As Per Specification, Manufacturer
3 Reinforced polymer& adhesive
Measurement Method statement Recommendations
material

Visual, Specification As Per Specification, Manufacturer


4 Application of CT 325 Mesh on EPS
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


5 Application of CT 16 Primer
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


6 Application of CT 60 Platster
Measurement Method statement Recommendations

Page 1 of 22 Form No. : MS-30-ITP R0


INSPECTION & TEST PLAN
Project Name :
Activity : EIFS Works ( MS-31 )

Acceptance Criteria /
Reference
Item Quality Control Point Type of Check Specification Clause /
Document
Manufacturer

Review of Specification
1 Approval of EIFS Material documents & MS Vendor List Material Submittal, Pre-Qualification
with RA MS with RA

Final Inspection for Block Work / Visual, Specification Free from Cracks and Hollowness and
2
Check Surface Preparation Measurement Method statement Surface should be Smooth and Flat

Fixing of EPS Board with Fiber


Visual, Specification As Per Specification, Manufacturer
3 Reinforced polymer& adhesive
Measurement Method statement Recommendations
material

Visual, Specification As Per Specification, Manufacturer


4 Application of CT 325 Mesh on EPS
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


5 Application of CT 16 Primer
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


6 Application of CT 60 Platster
Measurement Method statement Recommendations

Page 2 of 22 Form No. : MS-30-ITP R0


INSPECTION & TEST PLAN
Project Name :
Activity : EIFS Works ( MS-31 )

Acceptance Criteria /
Reference
Item Quality Control Point Type of Check Specification Clause /
Document
Manufacturer

Review of Specification
1 Approval of EIFS Material documents & MS Vendor List Material Submittal, Pre-Qualification
with RA MS with RA

Final Inspection for Block Work / Visual, Specification Free from Cracks and Hollowness and
2
Check Surface Preparation Measurement Method statement Surface should be Smooth and Flat

Fixing of EPS Board with Fiber


Visual, Specification As Per Specification, Manufacturer
3 Reinforced polymer& adhesive
Measurement Method statement Recommendations
material

Visual, Specification As Per Specification, Manufacturer


4 Application of CT 325 Mesh on EPS
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


5 Application of CT 16 Primer
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


6 Application of CT 60 Platster
Measurement Method statement Recommendations

Page 3 of 22 Form No. : MS-30-ITP R0


INSPECTION & TEST PLAN
Project Name :
Activity : EIFS Works ( MS-31 )

Acceptance Criteria /
Reference
Item Quality Control Point Type of Check Specification Clause /
Document
Manufacturer

Review of Specification
1 Approval of EIFS Material documents & MS Vendor List Material Submittal, Pre-Qualification
with RA MS with RA

Final Inspection for Block Work / Visual, Specification Free from Cracks and Hollowness and
2
Check Surface Preparation Measurement Method statement Surface should be Smooth and Flat

Fixing of EPS Board with Fiber


Visual, Specification As Per Specification, Manufacturer
3 Reinforced polymer& adhesive
Measurement Method statement Recommendations
material

Visual, Specification As Per Specification, Manufacturer


4 Application of CT 325 Mesh on EPS
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


5 Application of CT 16 Primer
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


6 Application of CT 60 Platster
Measurement Method statement Recommendations

Page 4 of 22 Form No. : MS-30-ITP R0


INSPECTION & TEST PLAN
Project Name :
Activity : EIFS Works ( MS-31 )

Acceptance Criteria /
Reference
Item Quality Control Point Type of Check Specification Clause /
Document
Manufacturer

Review of Specification
1 Approval of EIFS Material documents & MS Vendor List Material Submittal, Pre-Qualification
with RA MS with RA

Final Inspection for Block Work / Visual, Specification Free from Cracks and Hollowness and
2
Check Surface Preparation Measurement Method statement Surface should be Smooth and Flat

Fixing of EPS Board with Fiber


Visual, Specification As Per Specification, Manufacturer
3 Reinforced polymer& adhesive
Measurement Method statement Recommendations
material

Visual, Specification As Per Specification, Manufacturer


4 Application of CT 325 Mesh on EPS
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


5 Application of CT 16 Primer
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


6 Application of CT 60 Platster
Measurement Method statement Recommendations

Page 5 of 22 Form No. : MS-30-ITP R0


INSPECTION & TEST PLAN
Project Name :
Activity : EIFS Works ( MS-31 )

Acceptance Criteria /
Reference
Item Quality Control Point Type of Check Specification Clause /
Document
Manufacturer

Review of Specification
1 Approval of EIFS Material documents & MS Vendor List Material Submittal, Pre-Qualification
with RA MS with RA

Final Inspection for Block Work / Visual, Specification Free from Cracks and Hollowness and
2
Check Surface Preparation Measurement Method statement Surface should be Smooth and Flat

Fixing of EPS Board with Fiber


Visual, Specification As Per Specification, Manufacturer
3 Reinforced polymer& adhesive
Measurement Method statement Recommendations
material

Visual, Specification As Per Specification, Manufacturer


4 Application of CT 325 Mesh on EPS
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


5 Application of CT 16 Primer
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


6 Application of CT 60 Platster
Measurement Method statement Recommendations

Page 6 of 22 Form No. : MS-30-ITP R0


INSPECTION & TEST PLAN
Project Name :
Activity : EIFS Works ( MS-31 )

Acceptance Criteria /
Reference
Item Quality Control Point Type of Check Specification Clause /
Document
Manufacturer

Review of Specification
1 Approval of EIFS Material documents & MS Vendor List Material Submittal, Pre-Qualification
with RA MS with RA

Final Inspection for Block Work / Visual, Specification Free from Cracks and Hollowness and
2
Check Surface Preparation Measurement Method statement Surface should be Smooth and Flat

Fixing of EPS Board with Fiber


Visual, Specification As Per Specification, Manufacturer
3 Reinforced polymer& adhesive
Measurement Method statement Recommendations
material

Visual, Specification As Per Specification, Manufacturer


4 Application of CT 325 Mesh on EPS
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


5 Application of CT 16 Primer
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


6 Application of CT 60 Platster
Measurement Method statement Recommendations

Page 7 of 22 Form No. : MS-30-ITP R0


INSPECTION & TEST PLAN
Project Name :
Activity : EIFS Works ( MS-31 )

Acceptance Criteria /
Reference
Item Quality Control Point Type of Check Specification Clause /
Document
Manufacturer

Review of Specification
1 Approval of EIFS Material documents & MS Vendor List Material Submittal, Pre-Qualification
with RA MS with RA

Final Inspection for Block Work / Visual, Specification Free from Cracks and Hollowness and
2
Check Surface Preparation Measurement Method statement Surface should be Smooth and Flat

Fixing of EPS Board with Fiber


Visual, Specification As Per Specification, Manufacturer
3 Reinforced polymer& adhesive
Measurement Method statement Recommendations
material

Visual, Specification As Per Specification, Manufacturer


4 Application of CT 325 Mesh on EPS
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


5 Application of CT 16 Primer
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


6 Application of CT 60 Platster
Measurement Method statement Recommendations

Page 8 of 22 Form No. : MS-30-ITP R0


INSPECTION & TEST PLAN
Project Name :
Activity : EIFS Works ( MS-31 )

Acceptance Criteria /
Reference
Item Quality Control Point Type of Check Specification Clause /
Document
Manufacturer

Review of Specification
1 Approval of EIFS Material documents & MS Vendor List Material Submittal, Pre-Qualification
with RA MS with RA

Final Inspection for Block Work / Visual, Specification Free from Cracks and Hollowness and
2
Check Surface Preparation Measurement Method statement Surface should be Smooth and Flat

Fixing of EPS Board with Fiber


Visual, Specification As Per Specification, Manufacturer
3 Reinforced polymer& adhesive
Measurement Method statement Recommendations
material

Visual, Specification As Per Specification, Manufacturer


4 Application of CT 325 Mesh on EPS
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


5 Application of CT 16 Primer
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


6 Application of CT 60 Platster
Measurement Method statement Recommendations

Page 9 of 22 Form No. : MS-30-ITP R0


INSPECTION & TEST PLAN
Project Name :
Activity : EIFS Works ( MS-31 )

Acceptance Criteria /
Reference
Item Quality Control Point Type of Check Specification Clause /
Document
Manufacturer

Review of Specification
1 Approval of EIFS Material documents & MS Vendor List Material Submittal, Pre-Qualification
with RA MS with RA

Final Inspection for Block Work / Visual, Specification Free from Cracks and Hollowness and
2
Check Surface Preparation Measurement Method statement Surface should be Smooth and Flat

Fixing of EPS Board with Fiber


Visual, Specification As Per Specification, Manufacturer
3 Reinforced polymer& adhesive
Measurement Method statement Recommendations
material

Visual, Specification As Per Specification, Manufacturer


4 Application of CT 325 Mesh on EPS
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


5 Application of CT 16 Primer
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


6 Application of CT 60 Platster
Measurement Method statement Recommendations

Page 10 of 22 Form No. : MS-30-ITP R0


INSPECTION & TEST PLAN
Project Name :
Activity : EIFS Works ( MS-31 )

Acceptance Criteria /
Reference
Item Quality Control Point Type of Check Specification Clause /
Document
Manufacturer

Review of Specification
1 Approval of EIFS Material documents & MS Vendor List Material Submittal, Pre-Qualification
with RA MS with RA

Final Inspection for Block Work / Visual, Specification Free from Cracks and Hollowness and
2
Check Surface Preparation Measurement Method statement Surface should be Smooth and Flat

Fixing of EPS Board with Fiber


Visual, Specification As Per Specification, Manufacturer
3 Reinforced polymer& adhesive
Measurement Method statement Recommendations
material

Visual, Specification As Per Specification, Manufacturer


4 Application of CT 325 Mesh on EPS
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


5 Application of CT 16 Primer
Measurement Method statement Recommendations

Visual, Specification As Per Specification, Manufacturer


6 Application of CT 60 Platster
Measurement Method statement Recommendations

Page 11 of 22 Form No. : MS-30-ITP R0


N & TEST PLAN

Surveillance Points
Verifying
Document
Contractor Consultant Client Comments

WIR,MIR & MS with RA


H A S

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

Page 12 of 22 Form No. : MS-30-ITP R0


N & TEST PLAN

Surveillance Points
Verifying
Document
Contractor Consultant Client Comments

WIR,MIR & MS with RA


H A S

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

Page 13 of 22 Form No. : MS-30-ITP R0


N & TEST PLAN

Surveillance Points
Verifying
Document
Contractor Consultant Client Comments

WIR,MIR & MS with RA


H A S

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

Page 14 of 22 Form No. : MS-30-ITP R0


N & TEST PLAN

Surveillance Points
Verifying
Document
Contractor Consultant Client Comments

WIR,MIR & MS with RA


H A S

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

Page 15 of 22 Form No. : MS-30-ITP R0


N & TEST PLAN

Surveillance Points
Verifying
Document
Contractor Consultant Client Comments

WIR,MIR & MS with RA


H A S

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

Page 16 of 22 Form No. : MS-30-ITP R0


N & TEST PLAN

Surveillance Points
Verifying
Document
Contractor Consultant Client Comments

WIR,MIR & MS with RA


H A S

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

Page 17 of 22 Form No. : MS-30-ITP R0


N & TEST PLAN

Surveillance Points
Verifying
Document
Contractor Consultant Client Comments

WIR,MIR & MS with RA


H A S

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

Page 18 of 22 Form No. : MS-30-ITP R0


N & TEST PLAN

Surveillance Points
Verifying
Document
Contractor Consultant Client Comments

WIR,MIR & MS with RA


H A S

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

Page 19 of 22 Form No. : MS-30-ITP R0


N & TEST PLAN

Surveillance Points
Verifying
Document
Contractor Consultant Client Comments

WIR,MIR & MS with RA


H A S

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

Page 20 of 22 Form No. : MS-30-ITP R0


N & TEST PLAN

Surveillance Points
Verifying
Document
Contractor Consultant Client Comments

WIR,MIR & MS with RA


H A S

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

Page 21 of 22 Form No. : MS-30-ITP R0


N & TEST PLAN

Surveillance Points
Verifying
Document
Contractor Consultant Client Comments

WIR,MIR & MS with RA


H A S

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I W S
Checklist MS-31-CL-01

WIR,
I H S
Checklist MS-31-CL-01

Page 22 of 22 Form No. : MS-30-ITP R0