ATTIQ UR REHMAN CONT.
EST
SCAFFOLD HANDOVER CERTIFICATES
Company name AL REEF SUGAR REFINERY CO (JSC) Project title AL REEF SUGAR REFINERY
Location JIZAN ECONOMIC CITY Contract no.
Scaffolding – handing over certificate
To (contractor) ATTIQ UR REHMAN CONT. EST
Date Time
Description of scaffold or section of scaffold handed over
Drawing no. (where applicable)
Scaffolding, as described above, has now been completed and complies with the Work at Height
Regulations and current standards. It is structurally sound and should only be used and loaded in
accordance with our quotation number:
Use only for
Loading to be working lifts with distributed load of (kN/M² lbs/ft² per lift)
The detailed requirements of the regulations with regard to guard-rails, working platforms, toe-boards, bracing and ties have
been complied with.
In order to comply with the regulations, this scaffold must be inspected before being taken into use for the first time, at regular
intervals not exceeding seven days since the last inspection, after any event likely to have jeopardised the safety of the scaffold
and after any substantial addition, dismantling or other alteration. Particulars of each inspection must be recorded in a report of
inspection.
SCAFFOLD INSPECTOR
Name Position Signature Date
Certificate received on behalf of the contractor (ATTIQ UR REHMAN)
Name Position Signature Date