SAIL Q1 FY17 Performance Overview
SAIL Q1 FY17 Performance Overview
OF INDIA LIMITED
Performance
Highlights
Q1 FY17
PERFORMANCE HIGHLIGHTS : Q1 FY17
Net Sales : Rs 9082 Crore
FINANCIAL EBITDA : Rs 323 Crore
PERFORMANCE PBT : Rs (-)925 Crore
PAT : Rs (-)535 Crore
296 323
-2341
Q1 FY16 Q4 FY16 Q1 FY17
FINANCIAL PERFORMANCE
Net Worth Borrowings and Interest Cost
(Rs. Crore) (Rs. Crore)
33217
41025 42666 43505 29898
39281 25281
21597
2047
1454 Annual
968 Borrowings
748
Interest Cost
FY13 FY14 FY15 FY16 FY13 FY14 FY15 FY16
43185 36249 *
34873
38707
594
508 * After considering
IndAS impact of
Rs.1735 Crore
30.06.2015 30.06.2016 30.06.2015 30.06.2016
Q1 FY 17 Q1 FY 16
Rs. Crore
As Per Accounts Reported Impact of IndAS As Per Accounts
Annual Quarterly
12.4 12.4
11.9 11.9
SALEABLE 3.0 3.3
STEEL
PRODUCION
(5 ISPs)
Q1 FY16 Q1 FY17
16.8% 22%
1.5%
CRUDE STEEL Ingot Route
BOF
PRODUCTION CC Route
EAF
BY PROCESS
THF
82%
78%
28%
Flats
28% 48% 24%
BSP Longs
24% 76% Semis
DSP
79% 21%
RSP
94% 6%
BSL
65% 35%
ISP
PRODUCTION PERFORMANCE
LABOUR
PRODUCTIVITY
Number of Dealers
SALES THROUGH
2612 DEALER’s NETWORK
2156
28926
27828 27780 28052
26657 26668 Closing Share Price and
26283 26118 28452
27011 28115 24871 25342
Sensex as on the last day
26146 27000
26155
25607
of the month
70
66
61 23002 * As on September 7
57
51 53 52
50 49 47 48
46 43 43 45 47
43
35
Dividend
Interim Final Total Dividend
Tax
(%) (%) (%) (Rs. crore)
(Rs. crore)
FY16 - - - - -
DIVIDEND FY15 17.5 2.5 20 826 165
PAYOUT
FY14 20.2 - 20.2 834 142
9%
31%
Technological Shift
Before After
Technology
Expansion Expansion
BOF Steel Making 79% 100%
CC Route 71% 94%
Pelletisation Plant No Yes
Coke Dry Quenching Partial Yes
Top Pressure Recovery Turbine No Yes
Auxiliary Fuel Injection in BF Partial Coverage Full Coverage
Desulphurization of Hot Metal Partly 100 %
Beam Blank Casting No Yes
Coupled Pickling & Tandem Mill No Yes
Beneficiation Plant Partial Full
MODERNISATION & EXPANSION PLAN
Production through twin-hearth furnace (THF) route to be replaced by BOF-LD
converter route.
Production through Ingot – teeming route to be replaced with continuous cast
production route.
EXPECTED
Enhancement of Production volume by addition of 2 new 4060 m3 Blast
OUTCOME Furnaces and one Blast Furnace of 4160 m3.
Increased Market Share.
World class technology and products.
Improved Product Mix / proportion of value added products to increase.
Enhanced Pollution Control measures, with Environmental Conservation.
Saleable Steel
Hot Metal (MTPA) Crude Steel (MTPA)
(MTPA)
Plant
After After After
2015-16 2015-16 2015-16
Expansion Expansion Expansion
Facilities added:
•Steel melting Shop – Electric Arc Furnace (55 T); AOD Converter
(60 T); Ladle Furnace (60 T); Single Strand Slab Caster.
• Roll Grinder for Hot Rolling Mill
• Cold Rolling Mill Complex
–20-high Sendzimir Mill under stablisation
Production (MTPA) :
Facilities Completed:
• Coal, Coke Handling and Pipe Conveyor
• Ore Handling Plant
• Base Mix Preparation Plant
• New Coke Oven Battery (0.88 Mtpa, 2 x 37 ovens, 7 m tall) –
• Coke Dry Cooling Plant
• Sinter Machines (3.88 Mtpa gross sinter production, 2x204 m²)
• Blast Furnace 4160 m3 volume (2.7Mtpa)
• 3 nos. of 150 T BOF Converters
• 2x6 Strand Billet Casters (1.67 Mtpa)
• 1x4 Strand Bloom-cum-Beam Blank Caster (0.83 Mtpa)
• Wire Rod Mill (0.5 Mtpa)
• Bar Mill (0.75 Mtpa)
• Universal Section Mill (0.6 Mtpa)
MODERNISATION & EXPANSION PLAN - IISCO STEEL PLANT
New stream to produce 2.7 Mtpa of Hot Metal & 2.5 Mtpa of
Crude Steel
Production (MTPA) :
Item 2015 -16 (Actual) After Expansion
Crude Steel 0.871 2.50
Coke Oven
Battery Sinter Plant
Blast Furnace
BOF Converters
Billet Casters
Production (MTPA) :
Item 2015 -16 (Actual) After Expansion
Crude Steel 3.39 4.61
Saleable Steel 2.60 4.18
Current Progress of Expansion at Bokaro Steel Plant
PLTCM
Skin Pass
Mill
Bell Annealing Furnace
MODERNISATION & EXPANSION PLAN– BHILAI STEEL PLANT
Facilities Already Completed:
• Ore Handling Plant part-A
• Second Sinter Machine in Sinter Plant-3 (3.7 MTPA)
• New Coke Oven Battery No. 11 (7 m tall, Capacity 0.881 mtpa)
• Oxygen Plant (BOO basis)
• Rail Welding Line
Production (MTPA) :
Item 2015 -16 (Actual) After Expansion
Crude Steel 5.06 7.0
Blast Furnace - 8
Continuous Caster - 1
Production (MTPA) :
Item 2015 -16 (Actual) After Expansion
Crude Steel 2.73 4.20
Saleable Steel 2.42 3.99
Coke Oven
Battery - 6 Sinter Plant - 3
1
BOF Converter
Blast Furnace -
5 Tapping
MODERNISATION & EXPANSION PLAN– DURGAPUR STEEL PLANT
Facilities Completed:
• Rebuilding of Coke Oven Battery no-2
• New Ladle Furnace (125T)
• Coke Sorting & Coal Handling Plant
• New Dolomite Plant (300tpd)
• Bloom-cum-Round Caster 1X4 (0.75 Mtpa)
• New Medium Structural Mill (1.0 Mtpa);
Production (MTPA) :
The entire requirement of the increased capacity shall be met through captive mines
The timeline for mines expansion is expected to be in line with Steel Plants expansion
RAW MATERIALS – Coal
Hot Metal Coking Coal
Year Linkages of Coking Coal
(mtpa) Requirement (mtpa)
• Import Component – 86%
• Over 90% of imported coal is sourced from
Australia.
• Indigenous: 14%
2015-16 15.72 15.6
• Domestic coal is largely sourced from Coal India
Ltd.
• SAIL has existing captive coking coal production
of nearly 0.5 mtpa
• Long term / Quarterly contracts cover 95% of
Import requirements
• MDO has been engaged for development of
Tasra captive coal to produce 4 mtpa of ROM (2
mtpa washed coal)
Post • Sitanala coal block allotted for a mine capacity of
23.46 21.0
Expansion 0.30 mtpa of ROM (0.20 mtpa of washed coal)
• Parbatpur coking coal mine allocation letter
issued in March 2016
• New linkages / acquisitions are being explored
MAJOR JOINT VENTURES
FOCUS AREA ALLIANCE PARTNER REMARKS
MATERIALS M/s S&T Mining Company Pvt. Ltd. formed with Tata
Steel for developing coking coal mines in India.
M/s SAIL & MOIL Ferro Alloys (Pvt.) Ltd. formed with
MOIL for production of Ferro-alloys at Bhilai.