Detailed Audit Observations Financial Audit Engagement
Detailed Audit Observations Financial Audit Engagement
ASA-   A. At RO, copies of ASA received from CO and released to IMOs were duly signed by    For RO -                             RO and IMOs       RO:
RO4-      authorized officials. However, in all IMOs, the following were observed:          - Continue proper practice and will comply with        Melody C.
2018                                                                                          diligent filing of ASA releases.   the               Calibat
FAS1      1. ASAs on file were incomplete, not arranged per ASA number and not properly                                          recommendation.
             labelled.                                                                      For IMOs –                                             CBIMO:
              In CBIMO, a logbook of all received ASAs is maintained. But it is not - Improve filing system for easy                              Teresita B. De
                chronologically arranged per ASA number and date (Annex 1).                   referencing and retrieval of                         Lara
          2. No Schedules of ASA were attached to the (yearly) files of ASA.                  documents.
              In QIMO’s NISRIP file, attached was a handwritten summary list of ASA                                                               QIMO:
                received and its corresponding Funding Check (FC) amount in a yellow-ruled For RO and all IMOs -                                   Rodrigo L.
                paper (Annex 2).                                                            - Maintain/update logbook for all                      Alcance
          3. List of Allotments and Sub-Allotments (LASA) / FAR 1-B were not being prepared   received ASA according to ASA
             and maintained by RO and all IMOs.                                               number and date.                                     LRIMO:
                                                                                            - Prepare printed Schedules                            Ma. Corazon
                                                                                              (summary) of ASA to be                               Antonette M.
                                                                                              attached per file folder.                            Externon
                                                                                            - Prepare          and      maintain
                                                                                              LASA/FAR 1-B.
ASA-   B. Irregularities on the releasing and recording of ASA, Funding Checks (FC), and
RO4-       disbursements of project funds were found that, to wit:
2018
FAS1      1. RO takes substantial period from 14 to 167 calendar days to release ASAs to IMOs Starting FY 2017, RO affirms                         RO:
             from the original dates when ASAs are received from CO (Annex 3) as adoption of “one-year validity                                    Engr. Romeo
             summarized below:                                                                period”         of       authorized                  Lopez - RIM
                                                                                              appropriations, thus, it is advised
                                                                                              that timely release of ASAs to                       Engr. Gloriosa L.
                                                                                              IMOs be practiced to ensure                          Hernandez
                                                                                              efficient project implementation in
                                                                                              accordance with the approved                         DM Aurora A.
                                                                                              Program of Works (POWs).                             Papa
                                                                                  2
                                                                                        RECOMMENDED ACTIONS /                               CONCERNED
                                                                                                                              MANAGEMENT
REF                   FINDINGS/COMMENTS/ OBSERVATIONS                                       ACTIONS TO BE                                    OFFICIALS/
                                                                                                                              ACTION PLAN
                                                                                             UNDERTAKEN                                     PERSONNEL
                                                                          3
                                                                                             RECOMMENDED ACTIONS /                                  CONCERNED
                                                                                                                                    MANAGEMENT
REF                    FINDINGS/COMMENTS/ OBSERVATIONS                                           ACTIONS TO BE                                       OFFICIALS/
                                                                                                                                    ACTION PLAN
                                                                                                  UNDERTAKEN                                        PERSONNEL
                                                                                                                                                    QIMO:
                                                                                          For QIMO and LRIMO -                 It was agreed        Rodrigo L.
                                                                                          - Submit written explanation of during the Exit           Alcance
                                                                                            said disbursements.                Conference that
                                                                                                                               staring this year,   LRIMO:
      4. The 15% cash advance mobilization, under COB-ADA No. 2018-112 dated April 3,     For LRIMO   -                        RO and IMOs          Ma. Corazon
         2018 amounting to P60,158,100 was released to IMOs specifically for ASA Nos. - Systematically program the will practice                    Antonette M.
         2018-100, 101, 112, 114, 121, 122 and 126 totalling to P58,818,334.60 (Annex 8).   cash requirements for the cash-based                    Externon
                                                                                            salaries/ wages of personnel in disbursement in
         However, analysis of CY 2018 subsidiary ledgers (SL) revealed that some IMOs       the    Monthly      Disbursement preparation to
         incurred and paid disbursements even without released FC for the following ASAs:   Program   (BED   No.  3) pursuant CY 2019 cash-
                                                                                            to DBM Circular Letter No. based budgeting.
                                                                                            2016-9, as amended. The same
                                                                                            shall       be       automatically Accordingly, per
                                                                                            transferred to IMOs upon receipt CO-FMD’s
                                                                                            of cash allocation from RO.        advice, for
                                                                                                                               2017 obligations
                                                                               4
                                                                                                     RECOMMENDED ACTIONS /                                   CONCERNED
                                                                                                                                         MANAGEMENT
REF                         FINDINGS/COMMENTS/ OBSERVATIONS                                              ACTIONS TO BE                                        OFFICIALS/
                                                                                                                                         ACTION PLAN
                                                                                                          UNDERTAKEN                                         PERSONNEL
                                                                                                                                                             Melody C.
                                                                                                    Exercise    due   diligence     in                       Calibat
                                                                                                    encoding of ASA details.
          2. Non-compliance of official accounting forms, i.e. Budget Utilization Request and                                                                Melody C.
             Status (BURS) and Obligation Request and Status (ORS) used by RO do not                Exercise due diligence in the                            Calibat /
             contain the Box C (Status of Obligation) portion (Annex 12), per GAM Volume II.        preparation of accounting forms
                                                                                                    and attaching the complete                               Cecilia Agawin
                                                                                                    supporting documents.                                    (Cashier)
                                                                                     5
                                                                                                   RECOMMENDED ACTIONS /                                CONCERNED
                                                                                                                                      MANAGEMENT
REF                         FINDINGS/COMMENTS/ OBSERVATIONS                                            ACTIONS TO BE                                     OFFICIALS/
                                                                                                                                      ACTION PLAN
                                                                                                        UNDERTAKEN                                      PERSONNEL
       A. All IMOs submit their respective SAOLBs to RO for consolidation. However, reliability
                                                                                    6
                                                                                           RECOMMENDED ACTIONS /                                CONCERNED
                                                                                                                             MANAGEMENT
REF                     FINDINGS/COMMENTS/ OBSERVATIONS                                        ACTIONS TO BE                                     OFFICIALS/
                                                                                                                             ACTION PLAN
                                                                                                UNDERTAKEN                                      PERSONNEL
       and comparability of the SAOLBs cannot be ascertained due to the following:
                                                                                          All IMOs –                                           RO:
        Per SAOLB as submitted by IMOs:                                                  - Maintain complete and updated                      Melody C.
                                                                                            files of ADA received from CO                      Calibat
         1. Absence of LASA to verify ASA released to/received by the IMOs.                 and/or FC released to/received
ASA-                                                                                        by IMOs.                                           CIMO:
RO4-                                                                                                                                           Teresita B. De
2018                                                                                      Record on the proper SAOLB                           Lara
FAS3                                                                                      report the received ASA and                          QIMO
                                                                                          corresponding            FC     and                  Rodrigo L.
         2. Absence of FC files in all IMOs to verify cash received from RO.              disbursement according to (a)                        Alcance
                                                                                          GAA year, or (b) year ASAs were                      LRIMO
                                                                                          received but properly labelled as                    Ma. Corazon
                                                                                          continuing appropriations.                           Antonette M.
                                                                                                                                               Externon
                                                                                                                                               Teresita B. De
         3. Improper recording/reporting of the 2015 ASAs, FC and disbursement at CBIMO   For RO and all IMOs –                RO and IMOs Lara
             FY 2016 SAOLB (Annex 19).                                                     - Conduct reconciliation. Submit will comply with
                                                                                             results of reconciliation to IAS the
                                                                                             within thirty (30) days after recommendation.
                                                                                             receipt of this report.                           RO:
                                                                                                                                               Melody C.
                                                                                          For QIMO and LRIMO:                  QIMO has        Calibat
                                                                                          - Strict compliance with the submitted the           CBIMO:
                                                                                             prescribed timelines in the revised SAOLB         Teresita B. De
         4. Unreconciled IMO and RO records/reports (Annex 20).                              submission         of    updated/ as of April 30, Lara
                                                                                             reconciled SAOLBs to RO for 2018 during the QIMO:
                                                                                             timely consolidation.             Exit Conference Rodrigo L.
                                                                                                                               last May 11,    Alcance
                                                                                                                               2018.           LRIMO:
                                                                                                                                               Ma. Corazon
         5. Non-preparation and non-submission of updated/reconciled SAOLBs for FY                                                             Antonette M.
            2018 GAA by QIMO and LRIMO.                                                                                                        Externon
                                                                                7
                                                                                         RECOMMENDED ACTIONS /                            CONCERNED
                                                                                                                       MANAGEMENT
REF                   FINDINGS/COMMENTS/ OBSERVATIONS                                        ACTIONS TO BE                                 OFFICIALS/
                                                                                                                       ACTION PLAN
                                                                                              UNDERTAKEN                                  PERSONNEL
                                                                                8
                                                                                       RECOMMENDED ACTIONS /                             CONCERNED
                                                                                                                           MANAGEMENT
REF               FINDINGS/COMMENTS/ OBSERVATIONS                                          ACTIONS TO BE                                  OFFICIALS/
                                                                                                                           ACTION PLAN
                                                                                            UNDERTAKEN                                   PERSONNEL
                                                                                                                                         LRIMO:
                                                                                                                                         Ma. Corazon
                                                                                                                                         Antonette M.
                                                                                                                                         Externon
                                                                        9
                                                                                               RECOMMENDED ACTIONS /                             CONCERNED
                                                                                                                                   MANAGEMENT
REF                         FINDINGS/COMMENTS/ OBSERVATIONS                                        ACTIONS TO BE                                  OFFICIALS/
                                                                                                                                   ACTION PLAN
                                                                                                    UNDERTAKEN                                   PERSONNEL
                                                                                                                                                 CBIMO:
                                                                                                                                                 Teresita B. De
                                                                                                                                                 Lara
                                                                                                                                                 QIMO:
                                                                                                                                                 Rodrigo L.
                                                                                                                                                 Alcance
                                                                                                                                                 LRIMO:
                                                                                                                                                 Ma. Corazon
                                                                                                                                                 Antonette M.
                                                                                                                                                 Externon
                                                                                10
                                                                                   RECOMMENDED ACTIONS /                             CONCERNED
                                                                                                                       MANAGEMENT
REF                   FINDINGS/COMMENTS/ OBSERVATIONS                                  ACTIONS TO BE                                  OFFICIALS/
                                                                                                                       ACTION PLAN
                                                                                        UNDERTAKEN                                   PERSONNEL
                                                                                               For RO –
                                                                                               - Designate an alternate person                     RO:
                                                                                                 to countercheck propriety of the                  DM Aurora A.
                                                                                                 working papers and supporting                     Papa
                                                                                                 documents of LDDAP requests
                                                                                                 for funding.                                      Reynaria N.
                                                                                               - Secure electronic files with                      Tapia
                                                                                                 strong password to avoid
                                                                                                 modification by other person;                     Melody C.
                                                                                                 and utilize USB or external hard                  Calibat
                                                                                                 drive (to be updated regularly)
                                                                                                 for back-up in case of computer
ASA-                                                                                             failures and other factors.
          C. Inconsistent SAOLB format as prescribed in GAM and COA-DBM Joint Circular No.
RO4-                                                                                           - Maintain      complete      files
       2014-1 (FAR No. 1) - Guidelines Prescribing the Use of Modified Formats of Budget and
2018                                                                                             (hardcopy) of the Financial
       Financial Accountability Reports.
FAS3                                                                                             Reports with the corresponding
                                                                                                 supporting working papers, for
                                                                                                 reference and reconciliation
                                                                                                 purposes.
                                                                                 12
                                                                                                  RECOMMENDED ACTIONS /                 CONCERNED
                                                                                                                          MANAGEMENT
 REF                       FINDINGS/COMMENTS/ OBSERVATIONS                                            ACTIONS TO BE                      OFFICIALS/
                                                                                                                          ACTION PLAN
                                                                                                       UNDERTAKEN                       PERSONNEL
       D. In RO, monitoring of all LFP releases (ASA, FC and disbursements) and consolidation
          of SAOLB are being done:
 by a lone person –
              Due to work load, said person is prone to commit lapses and errors such as
               misposting of amounts thus, records/reports may be incorrect and becomes
               unreliable.
 electronically -
              Although, e-files are easily updated that made monitoring easy, the same are
               subject to risks such as accidental deletion, computer failures, and other human
               and technological factors.
                                                                                   13
                                                                                                 RECOMMENDED ACTIONS/                                  CONCERNED
                                                                                                                                     MANAGEMENT
REF                         FINDINGS/COMMENTS/ OBSERVATIONS                                          ACTIONS TO BE                                      OFFICIALS/
                                                                                                                                     ACTION PLAN
                                                                                                      UNDERTAKEN                                       PERSONNEL
I. FREQUENCY OF DEPOSITS
CSH-    A. Prompt deposit of collections were observed by all IMO Cashiers except at QIMO In the conduct of duties as                For immediate     QIMO:
RO4-       (Annex 26) to wit:                                                                    Cashiers, due care is necessary.    compliance as     Ms. AP
2018-       Shortage of P100.00 on the deposit made on February 26, 2018 due to illegible Strictly comply with:                     agreed during     Nombrefia
FAS1         duplicate copy of OR, mistakenly read as P1,500.00 instead of P1,600.00. The                                            the exit          (Acting Cashier)
             shortage was deposited the following banking day.                                   a. MC No. 28 s. 1986 on             conference held
            P50,000.00 collection on March 28, 2018 (Holy Week) was left vaulted in the            Frequency of Deposits.           at RO.            Regional
             cashier’s office during the long holiday break, posing risk. Money was deposited on b. COA Memorandum No. 2013-                           Irrigation
             April 2, 2018.                                                                         004 dated July 9, 2013, Item                       Manager (RIM),
                                                                                                    32, “xxx if impracticable,                         IMO Managers,
                                                                                                    deposit shall be made as soon                      Administrative
                                                                                                    as Php 10,000.00 collection                        and Finance
                                                                                                    has been reached.”                                 Manager,
                                                                                                                                                       Accounting
                                                                                                                                                       Units, Cashiers
                                                                                                                                                       and Collection
                                                                                                                                                       Representatives
                                                                                                                                     Justification be
                                                                                                                                     submitted
                                                                                                                                     regarding the
                                                                                                                                     collection of ISF
                                                                                                                                     despite R.A. No.
                                                                                                                                     10969.
                                                                                   16
                                                                                              RECOMMENDED ACTIONS/                                  CONCERNED
                                                                                                                                   MANAGEMENT
REF                     FINDINGS/COMMENTS/ OBSERVATIONS                                             ACTIONS TO BE                                    OFFICIALS/
                                                                                                                                   ACTION PLAN
                                                                                                     UNDERTAKEN                                     PERSONNEL
        1. Incorrect information printed in the particular explanation of BURS/DVs, to wit: AOs should exercise due diligence      GL Hernandez ALL IMOs/RO
CSH-        3R Metal Craft – LRIMO (Annex 32-A)                                            in the evaluation of submitted         committed that  Accounting Units
RO4-            Project name in the particulars of BUR should be “16 units centrifugal supporting          documents      for     proper
2018-             pumps Rodriguez PIP” instead of “procurement, delivery & installation of  consistency of information.            monitoring/
FAS5              solar power pump w/ accessories”                                                                                 review of
                                                                                                                                   documents will
            Hexamindz Corp – CBIMO (Annex 32-B)                                                                                   be implemented.
               “Package 4” was written as project name instead of “Package 1”.
        2. Existence of several alterations and erasures in particulars/explanation portion of In evaluating attachments, AOs Ms. AP                  ALL IMOs/RO
                                                                                            should exercise due care in            Nombrefia          Accounting Units
           DVs/BURS/OBRS.
                                                                                            issuing      and/or       preparing    Acting Cashier of
                                                                                            accountable forms such as              QIMO and
        Example:
CSH-                                                                                        DVs/OBRS in order to reduce/           Maria Corazon
RO4-                                                                                        eliminate erasures or alterations of   Antonette      M.
         IMO           Description in OBRs           Should be           Annex
2018-                                                                                       significant information. Further,      Externon
                           Particulars
FAS5                                                                                        AO shall affix his/her signature on    Collection Rep of
         LRIMO        San Juan RIS             Macabling, Diezmo          33-A
                                                                                            every portion wherein erasure/         LRIMO, who are
         CBIMO        Package 4                Package 1                  33-B              alteration has been made.              responsible     in
                                                                                                                                   the preparation
                                                                                                                                   of           said
                                                                                                                                   DVs/BURS,
                                                                                                                                   made          the
                                                                                                                                   corrections
                                                                                                                                   during the audit
                                                                                                                                   period.
        3. The following observations were noted on some PAID DVs and its supporting Comply with the provisions of GL                    Hernandez
           documents, as follows:                                                           COA Circular 92-389 dated              committed that
            No stamping of “PAID” on some DVs by Cashiers in all IMOs contrary to COA      November 3, 1992 stating that all      proper
              Circular 92-389 dated November 3, 1992 (Annex 34).                            vouchers      and     supporting       monitoring/
                                                                                            documents should be stamped            review of
                                                                                            “PAID” to prevent possible reuse       documents will
CSH-                                                                                        and abuse.                             be implemented.
                                                                                 17
                                                                            RECOMMENDED ACTIONS/                                CONCERNED
                                                                                                                  MANAGEMENT
REF                    FINDINGS/COMMENTS/ OBSERVATIONS                          ACTIONS TO BE                                    OFFICIALS/
                                                                                                                  ACTION PLAN
                                                                                 UNDERTAKEN                                     PERSONNEL
RO4-
2018-       Not properly filling up of details (Annex 35) such as:        Adhere with the provisions stated
FAS5          Processing date of DV                                       in GAM Vol. II, Appendix 32 Items
              BURS/OBRS number                                            B 3, 5 and 8 in proper filling up of
              Check details and date                                      DVs/BURS.
              Signature of payee in the payment received box
              OR issued by the payee
              Contract Number indicated in the BUR
                                                                           Exercise due diligence in the
            No stamping of DV number (Annex 36).                          preparation of forms and reports,
                                                                           and review the completeness,
                                                                           correctness and if proper, of the
                                                                           supporting documents
                                                                      18
                                                                                                     RECOMMENDED ACTIONS /                                      CONCERNED
                                                                                                                                            MANAGEMENT
REF                           FINDINGS/COMMENTS/OBSERVATION                                              ACTIONS TO BE                                           OFFICIALS/
                                                                                                                                            ACTION PLAN
                                                                                                          UNDERTAKEN                                            PERSONNEL
        I. PROJECT DISBURSEMENT REVIEW (see attached Table 1)
           A. On the preparation and processing of 15% advance mobilization and Progress            It is advised that accounting unit      GH Fernandez        CBIMO:
              Billings (PBs), the following were observed:                                          should ascertain conformance with       instructed IMO      Engr. JC
                                                                                                    the following:                          Chiefs to ensure    DeJesus, Sr.
FPM-        1. Lack of appropriate attached supporting documents, to wit:                           a. Adhere      to   the    minimum      that the            Engr. A
RO4-                                                                                                   requirement set forth in the ITB     minimum
2018-           Minimum requirement of equipment was not met as stated in Invitation to Bid           and conform with P.D. No. 1445       requirements set    Ms. TB De Lara,
FAS1             (ITB), instead picture documentation of materials delivered on site was               Section 4, Item 6.                   out in respective   Sr. Acctg Proc A
                 attached to claim the 15% advance mobilization (Annex 37).                         b. Submit explanation within 30         ITBs shall be
                List of contractor’s equipment pledged for the contract (1 unit one-bag concrete      days upon receipt of this audit      met before          Mr. Nolasco
                 mixer) was not certified nor supported the claim.                                     report.                              releasing 15%       Panganiban
                                                                                                    c. Conform with the required            advance             (Cashier)
                                                                                                       documents as stated per RA           payment on
                                                                                                       9184 sec 25.2(b) (viii)(3).          mobilization.
                 Contractor:   I.A. Bosque Const. Corp.
FPM-             Project Name: Bugaan Communal Irrigation System                                                                            Proper              All IMO Chiefs,
RO4-             Contract No.: Contract No. 4AB-RRC-17-021, located at Laurel, Batangas             Conform with the following              monitoring/         Engineering
2018-                                                                                               provisions in PD No. 1445,              review of           Units
FAS2                                                                                                Sections:                               documents will      Accounting Units
            2. Failure to review/assess the validity of supporting documents submitted by           4.6 - Claims against government         be implemented.     and those
               contractor in the preparation/payment of DVs such as:                                     funds shall be supported with                          responsible for
                                                                                                         complete documentation.            For submission      the preparation
                Non-submission of updated PCAB licenses (Annex 38).                                4.7 - All laws and regulations          of explanation      and evaluation of
                                                                                                         applicable      to     financial   the soonest.        DVs for
                       Contractor              PB No.        DV Date          PCAB Date                  transactions shall be faithfully                       contractors’
                  RM Adalin Const.               1st        07/26/2017        06/30/2017                 adhered to.                                            claims.
                                                 2nd        07/31/2017                              4.8 - Conform with the generally
                                                 3rd        09/04/ 2017                                  accepted      principles    and
                  Markbilt Construction          1st        12/21/2016        06/30/2016                 practices of accounting as
                                                 2nd        03/13/2017                                   well as of sound management
                                                                                                         and fiscal administration shall
                                                                                                         be observed, provided that
                                                                                                         they do not contravene
                                                                                                         existing laws and regulations.
                                                                                                    Conform with RA 9184 Sec.
FPM-                                                                                                23.1.a.vi. that requires a valid
RO4-                                                                                                PCAB license for contractors to
2018-                                                                                               participate      and      implement
                                                                                     19
                                                                                         RECOMMENDED ACTIONS /                                       CONCERNED
                                                                                                                         MANAGEMENT
   REF                     FINDINGS/COMMENTS/OBSERVATION                                        ACTIONS TO BE                                         OFFICIALS/
                                                                                                                         ACTION PLAN
                                                                                                  UNDERTAKEN                                         PERSONNEL
  FAS3                                                                                  government        infrastructure
                                                                                        projects.
             No attached updated Performance Bonds that coincide with the revised      To the engineering/accounting            Proper              All IMO Chiefs,
              contract completion dates (Annex 39).                                     units,    for     evaluators      and    monitoring/         Engineering
                                                                                        processors, the following are            review of           Units
                    Contractor         PB No.          Date        Performance Bond     advised:                                 documents shall     Accounting Units
                                                                         Expiry         a. Exert extra care in assessing         be implemented.     and those
               Hexamindz                 2nd        12/28/2017         10/27/2017          attached supporting documents                             responsible for
               Corporation                                                                 to prevent possible risk of error     IMO as paying       the preparation
               C.E. Mercado Const        2 nd
                                                    03/06/2018        06/28/2017           and loss.                             unit of             and evaluation of
                                                                                        b. Dates of supporting documents         contractors’        DVs for
               Markbilt Construction     1s         12/21/2016        09/16/2016           such as PCAB licenses, Surety         claims, shall       contractors’
                                         2nd        03/13/2017                             Bonds, Performance Bond and           monitor expiry      claims.
  FPM-                                                                                     Security Bonds should be              dates of licenses
  RO4-                                                                                     consistently monitored.               and bonds.
  2018-                                                                                 c. For project evaluators or
  FAS4                                                                                     reviewers,           competency
             No attached updated surety bond (Annex 40)                                   seminar/workshops               are
                                                                                           recommended.
              Contractor:              C.E. Mercado Construction                        d. Conform with the provisions of
              Contract orig. Expiry:   Sept. 7, 2017                                       RA 9184 sec. 39.4 that
              Contract revised expiry: March 23, 2018                                      performance       security   shall
              Surety Bond Expiry:      Feb. 27, 2018                                       remain valid until the issuance
  FPM-        Date of paid 3rd PB:    March 6, 2018                                        of     certificate    of      final
  RO4-                                                                                     acceptance.
  2018-
  FAS5                                                                                  Submit explanation/justification for
          3. No coverage and execution dates of surety bond for the 15% advance         further evaluation/review.
             mobilization claims (Annex 41)
                                                                                        Submit the required surety bond
            Contractor:     Titai General Construction                                  per RA 9184.
            Contract No.: 4AC-RRN-18-006 for the Construction of Protection Works for
            Plucena River Irrigation System located at Gen. Trias, Cavite
  FPM-                                                                                                                                               CBIMO:
RO4-                                                                                                                                                 Engr. JC De
  2018-   4. No inclusive dates on the approved Statement of Work Accomplished (SWA)                                                                 Jesus
                                                                               20
                                                                                                   RECOMMENDED ACTIONS /                                  CONCERNED
                                                                                                                                       MANAGEMENT
   REF                          FINDINGS/COMMENTS/OBSERVATION                                          ACTIONS TO BE                                       OFFICIALS/
                                                                                                                                       ACTION PLAN
                                                                                                        UNDERTAKEN                                        PERSONNEL
  FAS6          attached to some DVs (Annex 42).                                                                                                         Sr. Engr. A
                                                                                                    Written       explanation     is   Proper            Ms. TB De Lara,
              5. No signatures of recommending officer/verifier and inspector in the attached       necessary and submit the           monitoring/       Sr. Acctg Proc A
                 Certificate of Inspection and Acceptance casting doubt on the legality of the      same within 30 days upon           review of         Mr. Nolasco
                 transaction:                                                                       receipt of this audit report.      documents shall   Panganiban
                                                                                                                                       be implemented.   (Cashier)
                 1st PB of GVDPM Const. Corp for Molino RIS under contract no. SAC-RRN-17-                                                              CBIMO:
                  150 (Annex 43-A); and                                                                                                                  Engr. Edwin C.
                                                                                                                                                         Nazareno
                 1st PB of Magnarich Trading and Const. for the Construction of Diversion Works                                                         Sr. Engineer A
                  of Manalo CIS. Contract No. 4AB-RRC-17-77 (Annex 43-B).                                                                                Engr. Claudin L.
                                                                                                                                                         Abaca
                                                                                                                                                         Engr. Asst. B
                                                                                                                                                          Engr. Marivic R.
                                                                                                                                                         Dinglasan
                                                                                                                                                         Engr. A
FPM-
RO4-
  2018-   II. RESULTS OF AUDIT SAMPLE CONTRACTS
  FAS7         A. At LRIMO                                                                   The following are advised:                For submission    LRIMO:
                1. Contract No.: Bubukal CIS- 6M-RRECIS-CY15, for the construction of        1. Conform with the following             of explanation    Chief Engr.
                                  protection works, canal lining & structures of Bubukal CIS    provisions in PD No. 1445              the soonest       Nicasio C.
                   Contractor:    Markbilt Construction Inc.                                    Sections 4.6, 4.7 and 4.8:                               Pagdanganan Jr.
                   Contract Amt.: Php 5,399,932.11                                             “4.6. Claims against government         GL Hernandez
                                                                                               funds shall be supported with           will make sure    Engineering
                     Statement of Worked Accomplished/Certificate of Inspection were issued   complete documentation.                 that SWA would    Units
                      prior to request of contractor for payment (Annex 44).                   4.7. All laws and regulations           bear inclusive    Accounting Units
                                                                                               applicable       to       financial     dates, and will   and those
                           PB      Date receipt of payment     Date of SWA & Certificate of    transactions  shall  be   faithfully    review            responsible for
                                     request by LARIMO            Inspection & Acceptance      adhered to.                             contractor’s      the preparation
                           1 st
                                          12/21/2016                    12/19/2016              4.8. Conform with the generally        documents         and evaluation of
                           2 nd
                                          02/27/2017                    02/24/2017             accepted       principles      and      properly.         DVs for
                                                                                               practices of accounting as well                           contractors’
                                                                                               as of sound management and                                claims.
                                                                                               fiscal administration shall be
                                                                                               observed, provided that they do
                                                                                               not contravene existing laws and
                                                                                               regulations.”
                                                                                       21
                                                                                      RECOMMENDED ACTIONS /                                   CONCERNED
                                                                                                                            MANAGEMENT
REF                   FINDINGS/COMMENTS/OBSERVATION                                       ACTIONS TO BE                                        OFFICIALS/
                                                                                                                            ACTION PLAN
                                                                                           UNDERTAKEN                                         PERSONNEL
                                                                                     2. Check       competency       of
                                                                                        evaluators/reviewers
       2. Contract No.: LFLIS-15M-RRENIS-CY16                                           responsible in the preparation
          Project Name: Laguna Friar Land Irrigation System, Sta. Rosa and Calamba      and processing of contractors’
                         City                                                           claims. Otherwise, attendance
          Contractor:    C.E. Mercado Construction                                      to relevant trainings/seminars
          Contract Amt.: Php 14,180,544.84                                              are necessary.
            Inconsistencies of attached SWA for 1st PB (Annex 45).                  3. Submit written explanation/
                                                                                        justification within 30 days upon
                          Particulars               % Accomp             Date           receipt of this audit report.
              SWA                                    20.95%           04/05/2015
              Certificate  of     Inspection  &      23.53%           04/05/2015
              Acceptance                                                                                                   GL Hernandez       CBIMO:
              Same amount and date but different         Php 2,970,622.72            1. Strict adherence with the only vouched for            Chief Engr.
              % Accomplishment                                                          following provisions in PD No. the 1st PB that        Charlie D.
                                                                                        1445, Sections 4.6, 4.7 and 4.8: the contractor       Ibarrola
                                                                                                                           took risk to
      B. At CBIMO                                                                       “4.6.Claims against government commence               Engineering
                                                                                        funds shall be supported with construction            Units
       1. Contract No.: Gen. Aguinaldo-10M-EEEIS/CIS-CY16, for Construction of          complete documentation.            ahead of           Accounting Units
                        canal lining for Gen. Aguinaldo SIP                             4.7. All laws and regulations issuance of NTP.        and those
         Contractor:    T.M.G. General Contractor                                       applicable      to       financial However, the       responsible for
         Contract Amt.: Php 9,351,331.50                                                transactions shall be faithfully succeeding           the preparation
                                                                                        adhered to.                        payments should    and evaluation of
                                                                                         4.8. Conform with the generally be explained by      DVs for
                                                                                        accepted      principles      and the concerned       contractors’
                                                                                        practices of accounting as well IMO Chief.            claims.
                                                                                        as of sound management and
                                                                                        fiscal administration shall be It is advised that     Ms. TB De Lara
                                                                                        observed, provided that they do IMO should            Sr. Acctg. Proc A
                                                                                        not contravene existing laws write/inform
                                                                                        and regulations.”                  HOPE(RO) and
                                                                                                                           request approval
                                                                                     2. Written      explanation        is to commence
                                                                                        necessary for the processing/ construction
                                                                                        payment     of     claims     with before issuance
                                                                             22
                                                                                         RECOMMENDED ACTIONS /                                    CONCERNED
                                                                                                                             MANAGEMENT
REF                 FINDINGS/COMMENTS/OBSERVATION                                              ACTIONS TO BE                                       OFFICIALS/
                                                                                                                             ACTION PLAN
                                                                                                 UNDERTAKEN                                       PERSONNEL
                                                                                          inconsistencies in the attached    of NTP
                                                                                          defective            supporting    specifying loss
                                                                                          documents.                         will be borne by
      a. PBs were paid despite inconsistencies of the attached supporting documents                                          the contractor in
         (Annex 46), as follows:                                                                                             case contract will
                                                                                                                             not be carried
         Conflicting/contradicting dates of contractor’s requests versus SWA (see                                           out .
           above table).
                                                                                     25
 D. OTHER CONTROL ISSUES
OCI-      1. Unsecured rooms of the Cashiers.                                                Cashier’s    room    must     be Noted             ALL IMOs/RO
RO4-                                                                                         appropriately secured to prevent                   Accounting Units
  2018-                                                                                      possible loss of government
  FAS1                                                                                       monies.
OCI-      4. Improper Official Receipt (OR) issuance and recording by the Property Officer of RIO, Due care should be made for Complied         RO:
RO4-        who issued the following series of OR booklets distributed to IMOs (Annex 48).   proper control and monitoring in                   Mr. Ernesto Cruz
  2018-                                                                                      the issuance of ORs. It is                         Jr.
  FAS2                    IMO                   OR NO.                 DATE                  suggested that first-in, first-out                 Supply Officer B
                                         From             To                                 (FIFO) Inventory System be
                         LRIMO          1092500         1093000      10/08/2014              strictly applied.
                         CBIMO          1093001         1094500      11/14/2014
                         QIMO           1094501         1095500      07/10/2014
                         LRIMO          1095501         1097500      10/08/2014
                         QIMO           1097501         1099000      05/29/2014
                         CBIMO          1099001         1099500      07/10/2014
                         LRIMO          1099501         1100000      07/10/2014
                    Due to voluminous workload since RO-Cashier was also designated as LRIMO         Coll Rep should be relieved as      It was agreed       LRIMO:
                     Cashier, several reports may not be immediately prepared.                        accounting personnel, and LRIMO     that LRIMO Coll     Maria Corazon
                                                                                                      Coll Rep may be designated as       Rep would be        Antonette M.
                                                                                                      SCDO of LRIMO to unload             utilized    as      Externon
                                                                                                      voluminous responsibility of RO-    cashier     of
                                                                                                      Cashier.                            LRIMO.              RO:
                                                                                                                                                              Cecilia Agawin
                                                                                                                                                              (Cashier)
OCI-      6. At all IMOs, no complete files of processed DVs and its supporting documents were Due           to tedious process of For immediate              All IMOs/RO
RO4-           retained nor stored properly, since the original documents were already submitted to   requesting NIA original documents compliance.           Accounting Units
  2018-        COA.                                                                                   from COA, Accounting Units of
  FAS4                                                                                                region/IMOs should maintain on
                                                                                                      file, photocopies of all financial
                                                                                                      records,    vouchers     and   its
                                                                                                      supporting documents for future
                                                                                                      reference.
27