Project Integration Management
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Project Integration Management
                                         4.1 Develop Project Charter                                                                         4.2 Develop project Management Plan                                                                                     4.3 Direct and Manage work                                                                                 4.4 Monitoring & Controlling project work                                                         4.6 Close project or phase
                                         Develops a document that formally authorizes a project or a phase of a project to begin             Documents the actions necessary to define, prepare, integrate, and coordinate all                                       Performs and leads the work defined in the project management plan to achieve the                          Tracks, reviews, and regulates the project’s progress to meet the performance objectives          The Finalizes all activities across all the project management process groups to formally 
                                         and documenting the initial requirements needed to satisfy stakeholder needs and                    subsidiary project plans.                                                                                               project’s objectives.                                                                                      defined in the project management plan.                                                           complete the project or phase.
                                         .1 Project statement of work .1 Expert judgment             .1  Project charter                     .1 Project charter          .1 Expert judgment              .1  Project management plan                                 .1 Project management plan .1 Expert judgment             .1 Deliverables                                  .1 Project management plan .1 Expert judgment                .1 Change requests                   .1 Project management plan .1 Expert judgment                 .1 Final product, service, or
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                result transition
                                         .2 Business case                .2 Facilitation techniques                                          .2 Outputs from other         .2 Facilitation techniques                                                                .2 Approved change requests .2 Project management                            .2 Work performance data      .2 Schedule forecasts          .2 Analytical techniques        .2 Work performance                .2 Accepted deliverables         .2 Analytical techniques     .2 Organizational process
                                                                                                                                             processes                                                                                                                                           information system                                                                                                                            reports                                                                                          assets updates
                                         .3 Agreements                                                                                       .3 Enterprise environmental                                                                                                                         .3 Meetings                                      .3 Change requests            .3 Cost forecasts              .3 Project management           .3 Project management              .3 Organizational process        .3 Meetings
                                                                                                                                             factors                                                                                                                                                                                                                                                           information system              plan updates                       assets
                                         .4 Enterprise environmental                                                                         .4 Organizational process                                                                                               .3 Enterprise environmental                                                  .4 Project management plan    .4 Validated changes           .4 Meetings                     .4 Project documents
                                         factors   EEF                                                                                       assets                                                                                                                                                                                               updates                                                                                      updates
                                         .5 Organizational process                                                                                                                                                                                                   .4 Organizational process                                                    .5 Project documents          .5 Work performance
                                         assets   OPA                                                                                                                                                                                                                assets                                                                       updates                       information
                                                                                                                                                                                                                                                                                                                                                                                .6 Enterprise environmental
                                                                                                                                                                                                                                                                                                                                                                                factors
                                                                                                                                                                                                                                                                                                                                                                                .7 Organizational process
                                                                                                                                                                                                                                                                                                                                                                                assets
                                                                                                                                                                                                                                                                                                                                                                                4.5 Perform integrated change control
                                         Who owns the project charter?                                                                                                                                                                                               What Are the Project Deliverables?                                                                         Reviews all change requests, approves changes (as appropriate), and manages changes to 
                                         The project sponsor responsible for the financial resources of the project owns the                                                                                                                                         A project del ivera bl e is  the product of work done on a  project, s uch a s  a  bluepri nt              the deliverables, organizational process assets, project documents, and the overall project 
                                         project charter. The sponsor is usually the person who promotes or supports the                                                                                                                                             of a buil di ng, a tes t s cript for s oftwa re tes ting, or a s pecific tra ining manual .                .1 Project management plan .1 Expert judgment                 .1 Approved change
                                         benefits of the project to higher levels of management. In the real‐world, however,                                                                                                                                         Del ivera bl es  are s ometimes  des cribed a s  i nputs  or outputs . One pers on’s                                                                                     requests
                                         the project manager (or project leader) usually documents the details of the charter                                                                                                                                        outputs  a re the next pers on’s  inputs . A del ivera bl e ca n be a “product” of the                     .2 Work performance            .2 Meetings                    .2 Change log
                                         and obtains approval for the project to begin                                                                                                                                                                               project. It s hould be a  unique a nd veri fi able product, s ervice, or res ult tha t mus t               reports
                                                                                                                                                                                                                                                                     be produced to complete a  proces s , phas e, or the project i ts el f.                                    .3 Change requests             .3 Change control tools        .3 Project management plan
                                                                                                                                                                                                                                                                     Project del ivera bl es  include both the outputs  tha t compri s e the product or s ervi ce                                                                             updates
                                                                                                                                                                                                                                                                     of the project a s  wel l a s  a nci ll ary res ults , s uch a s  project reports  and other 
                                                                                                                                                                                                                                                                     documents .                                                                                                .4 Enterprise environmental                                    .4 Project documents
                                                                                                                                                                                                                                                                     Del ivera bl es  ca n be des cribed a t a  s umma ry l evel or in grea t deta il , depending               factors                                                        updates
                                                                                                                                                                                                                                                                     on the needs  of the project.                                                                              .5 Organizational process
                                                                                                                                                                                                                                                                                                                                                                                assets
     Project  Scope Management
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Project  Scope Management
                                                                                                                                             5.1 Plan Scope Management                                                                                                                                                                                                          5.5 Validate Scope
                                                                                                                                             Creates a scope management plan that documents how the project scope will be defined,                                                                                                                                              Formalizes the acceptance of the complete project deliverables
                                                                                                                                             validated, and controlled
                                         Requirements Should Map to the Project Goals and Objectives                                         .1 Project management plan .1 Expert judgment           .1 Scope management plan                                                                                                                                                   .1 Project management plan .1 Inspection                       .1 Accepted deliverables
                                         The business or organization’s goals and objectives will dictate which requirements are 
                                         important. Also, requirements are best divided into project requirements and product/or             .2 Project charter                        .2 Meetings                                  .2 Requirements                                                                                                                             .2 Requirements              .2 Group decision‐                .2 Change requests
                                         service requirements. The primary purpose for collecting requirements is to allow the                                                                                                      management plan                                                                                                                             documentation                makingtechniques
                                         project team to focus on what the project will deliver. The deliverables and the product,           .3 Enterprise environmental                                                                                                                                                                                                        .3 Requirements traceability                                   .3 Work performance
                                         service, or result of the project must map back to the customer’s business or                       factors                                                                                                                                                                                                                            matrix                                                         information
                                         organization’s needs and expectations.                                                              .4 Organizational process                                                                                                                                                                                                          .4 Verified deliverables                                       .4 Project documents
                                         Business objectives can be described in two different ways:                                         assets                                                                                                                                                                                                                                                                                            updates
                                         Hard objectives  Relate to the time, cost, and operational objectives (scope) of the                                                                                                                                                                                                                                                   .5 Work performance data
                                         product or process. Here are some examples:
                                         ● Reduce event staffing expenses by 15 percent.
                                         ● Reduce utility cost by 10 percent.
                                         ● Reduce maintenance/operational expenses by $25,000 per year.                                      5.2 Collect Requirement                                                                                                                                                                                                            5.6 Control Scope
                                         Soft Objectives  Relate more to how the objectives are achieved, and may include                    Defines, manages and documents stakeholder needs and requirements to meet project                                                                                                                                                  Involves monitoring project status and product scope as well as managing changes to the 
                                         attitude, behavior, expectations, and communications. Here are some examples:                       objectives                                                                                                                                                                                                                         approved scope baseline
                                         ● Improve customer service by developing a unique way for all staff to address guests               .1 Scope management plan .1 Interviews                             .1 Requirements                                                                                                                                                 .1 Project management plan .1 Variance analysis              .1 Work performance
                                         when they arrive.                                                                                                              .2 Focus groups                         documentation                                                                                                                                                                                                                information
                                         ● Improve the timeliness and accuracy of the building changeover process through                    .2 Requirements            .3 Facilitated workshops                .2 Requirements traceability                                                                                                                                    .2 Requirements                                              .2 Change requests
                                         improved communications and active participation by the team.                                       management plan            .4 Group creativity                     matrix                                                                                                                                                          documentation
                                         ● Improve intercompany communication by discussing event requirements one month in                  .3 Stakeholder management .5 Group decision‐making                                                                                                                                                                                 .3 Requirements traceability                                 .3 Project management plan 
                                         advance with all departments.                                                                       plan                       Techn.                                                                                                                                                                                                  matrix                                                       updates
                                                                                                                                             .4 Project charter         .6 Questionnaires and                                                                                                                                                                                   .4 Work performance data                                     .4 Project documents
                                                                                                                                                                        surveys                                                                                                                                                                                                                                                              updates
                                                                                                                                             .5 Stakeholder register    .7 Observations                                                                                                                                                                                         .5 Organizational process  
                                                                                                                                                                        .8 Prototypes                                                                                                                                                                                           assets
                                                                                                                                                                        .9 Benchmarking                                                                                                                                                                                                                                                      .5 Organizational process
                                                                                                                                                                        .10 Context diagrams                                                                                                                                                                                                                                                 assets updates
                                                                                                                                                                        .11 Document analysis
                                                                                                                                             5.3Define Scope
                                                                                                                                             Develops a detailed description of the project and product of the project
                                                                                                                                             .1 Scope management plan .1 Expert judgment                   .1 Project scope statement
                                                                                                                                             5.4 Create WBS
                                                                                                                                             Work Breakdown Structure : Involves subdividing the project into smaller, more 
                                                                                                                                             manageable components
                                                                                                                                             .1 Scope management plan .1 Decomposition                    .1 Scope baseline
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Project Time  Managment
                                                                                                                                             6.1 Plan Schedule Management                                                                                                                                                                                                       6.7 Control Schedule
                                                                                                                                             Establishes the policies, procedures, and documentation for planning, developing,                                                                                                                                                  This is the process of monitoring the progress of the project to update status and manage 
                                                                                                                                             managing, executing, and controlling the project schedule.                                                                                                                                                                         changes to the schedule baseline.
                                         Activity Attributes  Activity attributes extend the description of an activity by                   .1 Project management plan .1 Expert judgment                .1 Schedule management                                                                                                                                                .1 Project management plan .1 Performance reviews              .1 Work performance
                                         identifying the many components associated with the activity. Attributes are the                                                                                 plan                                                                                                                                                                                                                                 information
                                         characteristics of schedule activities, and they can be organized, sorted, or                       .2 Project charter              .2 Analytical techniques                                                                                                                                                                           .2 Project schedule            .2 Project management           .2 Schedule forecasts
                                         summarized according to the attribute categories. For example, a measure of the                                                                                                                                                                                                                                                                                       software                        .3 Change requests
                                         elapsed time required to complete an activity is an attribute.                                      .3 Enterprise environmental               .3 Meetings                                                                                                                                                                              .3 Work performance data       .3 Resource optimization        .4 Project management plan
                                         During the initial phase of the project, activity attributes may include the activity               factors                                                                                                                                                                                                                                                           techniques                      updates
                                                                                                                                             .4 Organizational process                                                                                                                                                                                                          .4 Project calendars           .4 Modeling techniques          .5 Project documents
                                         identification (ID) number, WBS ID number, activity name, activity codes, and 
                                                                                                                                             assets                                                                                                                                                                                                                                                                                            updates
                                         logical relationships. As the project progresses, the attributes tend to evolve into 
                                                                                                                                                                                                                                                                                                                                                                                .5 Schedule data               .5 Leads and lags               .6 Organizational process
                                         more complex descriptions, resource requirements, locations of the work, and 
                                                                                                                                                                                                                                                                                                                                                                                                                                               assets updates
                                         activity types, such as level of effort (LOE), discrete (independent) effort, and                                                                                                                                                                                                                                                      .6 Organizational process      .6 Schedule compression
                                         apportioned (spread over multiple activities) effort (AE).                                                                                                                                                                                                                                                                             assets
                                                                                                                                             6.2 Define activities                                                                                                                                                                                                                                             .7 Scheduling tool
                                         Level of effort (LOE) is work that does not result in a final product (such as liaison, 
                                                                                                                                             This involves identifying specific activities needed to produce the approved project 
                                         coordination, follow up, or other support activities) and which cannot be effectively 
                                                                                                                                             deliverables.
                                         associated with a definable end product process result.
                                                                                                                                             .1 Schedule management          .1 Decomposition                .1 Activity list
                                                                                                                                             plan
                                                                                                                                             .2 Scope baseline               .2 Rolling wave planning        .2 Activity attributes
                                                                                                                                             6.3 Sequence Activities
                                                                                                                                             This involves identifying and documenting relationships (predecessor and successor) 
                                                                                                                                             between the project activities.
                                                                                                                                             .1 Schedule management          .1 Precedence diagramming .1 Project schedule network
                                                                                                                                             plan                            method (PDM)                 diagrams
                                                                                                                                             .2 Activity list                .2 Dependency                .2 Project documents
                                                                                                                                                                             determination                updates
                                                                                                                                             .3 Activity attributes          .3 Leads and lags
.4 Milestone list
.5 Project scope statement
                                                                                                                                             .6 Enterprise environmental
                                                                                                                                             factors
                                                                                                                                             .7 Organizational process
                                                                                                                                             assets
                                                                                                                                             6.4 Estimate Activity Resources
                                                                                                                                             This involves estimating the type and quantities of material, people, equipment, or 
                                                                                                                                             supplies needed to perform each activity.
                                                                                                                                             .1 Schedule management         .1 Expert judgment             .1 Activity resource
                                                                                                                                             plan                                                          requirements
                                                                                                                                             .3 Activity attributes         .2 Alternative analysis        .2 Resource breakdown
                                                                                                                                                                                                           structure
                                                                                                                                             .4 Resource calendars          .3 Published estimating data .3 Project documents
                                                                                                                                                                                                           updates
                                                                                                                                             .5 Risk register               .4 Bottom‐up estimating
                                                                                                                                             .6 Activity cost estimates                .5 Project management  
                                                                                                                                                                                       software
                                                                                                                                             .7 Enterprise environmental
                                                                                                                                             fac
                                                                                                                                             .8 Organizational process
                                                                                                                                             assets
                                                                                                                                             6.5 Estimate Activity Duration
                                                                                                                                             This involves approximating the number of work periods needed to complete individual 
                                                                                                                                             activities with the estimated number of resources available.
                                                                                                                                             .1 Schedule management         .1 Expert judgment            .1 Activity duration
                                                                                                                                             plan                                                         estimates
                                                                                                                                             .2 Activity list               .2 Analogous estimating       .2 Project documents
                                                                                                                                                                                                          updates
                                                                                                                                             .3 Activity attributes         .3 Parametric estimating
                                                                                                                                             .4 Activity resource                      .4 Three‐point estimating
                                                                                                                                             requirements
                                                                                                                                             .5 Resource calendars                     .5 Group decision‐making
                                                                                                                                                                                       techniques
                                                                                                                                             .6 Project scope statement                .6 Reserve analysis
.7 Risk register
                                                                                                                                             .8 Resource breakdown
                                                                                                                                             structure
                                                                                                                                             .9 Enterprise environmental
                                                                                                                                             fac
                                                                                                                                             .10 Organizational process
                                                                                                                                             assets
                                                                                                                                             6.6 Develop Schedule
                                                                                                                                             This involves analyzing the activity sequences, durations, resource requirements, and 
                                                                                                                                             schedule constraints to create the project schedule
                                                                                                                                             .1 Schedule management          .1 Schedule network            .1 Schedule baseline
                                                                                                                                             plan                            analysis
                                                                                                                                             .2 Activity list                .2 Critical path method        .2 Project schedule
                                                                                                                                             .3 Activity attributes          .3 Critical chain method
                                                                                                                                             .4 Project schedule             .4 Resource optimization       .3 Schedule data
                                                                                                                                             network diagrams                techniques
                                                                                                                                             .5 Activity resource            .5 Modeling techniques         .4 Project calendars
                                                                                                                                             requirements
                                                                                                                                             .6 Resource calendars           .6 Leads and lags              .5 Project management plan 
                                                                                                                                                                                                            updates
                                                                                                                                             .7 Activity duration            .7 Schedule compression        .6 Project documents 
                                                                                                                                             estimates                                                      updates
                                                                                                                                             .8 Project scope statement      .8 Scheduling tool
                                                                                                                                             .9 Risk register
                                                                                                                                             .10 Project staff assignments
                                                                                                                                             .11 Resource breakdown
                                                                                                                                             structure
                                                                                                                                             .12 Enterprise environmental
                                                                                                                                             factors
                                                                                                                                             .13 Organizational process
                                                                                                                                             assets
     Project Cost  Managment
Project Cost Managment
                                                                                                                                             7.1 Plan Cost Management                                                                                                                                                                                                           7.4 Control Costs
                                                                                                                                             Establishes the policies, procedures, and documentation for planning, managing,                                                                                                                                                    Monitoring the  project status to update the budget and manage changes to the cost 
                                                                                                                                             expending, and controlling project costs.                                                                                                                                                                                          baseline.
                                         Cost vs. Pricing. Keep in mind that cost and pricing are two different                              .1 Project management plan .1 Expert judgment                .1 Cost management plan                                                                                                                                               .1 Project management plan .1 Earned value                 .1 Work performance
                                                                                                                                                                                                                                                                                                                                                                                                               management                  information
                                         things. Cost is an expenditure of money, time, and labor to acquire or
                                                                                                                                             .2 Project charter                        .2 Analytical techniques                                                                                                                                                                 .2 Project funding             .2 Forecasting              .2 Cost forecasts
                                         provide goods and/or services whereas pricing is the cost plus profit margin.                                                                                                                                                                                                                                                          requirements                   .3 To‐complete              .3 Change requests
                                                                                                                                             .3 Enterprise environmental   .3 Meetings                                                                                                                                                                                          .3 Work performance data       performance index (TCPI)    .4 Project management plan
                                         Parametric Estimating. Parametric estimating uses a statistical             factors                                                                                                                                                                                                                                                                                   .4 Performance reviews      updates
                                                                                                                     .4 Organizational process                                                                                                                                                                                                                                  .4 Organizational process      .5 Project management       .5 Project documents
                                         relationship between historical data and other variables to calculate an
                                                                                                                     assets                                                                                                                                                                                                                                                     assets                         software                    updates
                                         estimate for activity parameters, such as cost, budget, and duration. This                                                                                                                                                                                                                                                                                            .6 Reserve analysis         .6 Organizational process
                                         technique usually provides a high degree of accuracy because you have                                                                                                                                                                                                                                                                                                                             assets updates
                                         historical information to draw from. As always, you can use this estimating
                                         method with other methods, as needed, to reach a level of confidence in the
                                         accuracy of your cost estimate for the entire project.                      7.2 Estimate Costs
                                                                                                                                             Develops an estimation of the monetary resources needed to complete project activities.
                                                                                                                                             .1 Cost management plan                   .1 Expert judgment                           .1 Activity cost estimates
                                         When reporting the progress of work performed and EV in dollars/euro for                                                                      .2 Analogous estimating                      .2 Basis of estimates
                                         a particular activity or work package, use the progress-reporting rules:                            .2 Human resource                         .3 Parametric estimating                     .3 Project documents
                                         ● 50/50 rule Fifty percent credit for the value of an activity when it begins                       management plan                           .4 Bottom‐up estimating                      updates
                                                                                                                                             .3 Scope baseline                         .5 Three‐point estimating
                                         and 50 percent when complete
                                                                                                                                             .4 Project schedule                       .6 Reserve analysis
                                         ● 20/80 rule Twenty percent credit for the value of an activity when it                             .5 Risk register                          .7 Cost of quality
                                         begins and 80 percent when complete                                                                                                           .8 Project management
                                         ● 0/100 rule Zero percent credit when the activity begins and 100 percent                           .6 Enterprise environmental               software
                                                                                                                                             factors                                   .9 Vendor bid analysis
                                         credit when it is complete
                                                                                                                                             .7 Organizational process                 .10 Group decision‐making
                                                                                                                                             assets                                    techniques
                                                                                                                                             7.3 Determine Budget
                                                                                                                                             Aggregating the estimated costs of each activity or work package to establish an approved 
                                                                                                                                             cost baseline.
                                                                                                                                             .1 Cost management plan      .1 Cost aggregation             .1 Cost baseline
                                                                                                                                             .2 Scope baseline
                                                                                                                                             .3 Activity cost estimates   .2 Reserve analysis             .2 Project funding
                                                                                                                                             .4 Basis of estimates                                        requirements
                                                                                                                                             .5 Project schedule          .3 Expert judgment              .3 Project documents
                                                                                                                                             .6 Resource calendars                                        updates
                                                                                                                                             .7 Risk register             .4 Historical relationships
                                                                                                                                             .8 Agreements
                                                                                                                                             .9 Organizational process    .5 Funding limit
                                                                                                                                             assets                       reconciliation
     Project Quality Management
Project Quality Management
Project Human Resource Management
                                                                                                                                             9.1 Plan Human Resource Manag.                                                                                          9.2 Acquire Project Team
                                         .                                                                                           Identifying and documenting project roles and responsibilities, required skills,                                                Verifying the availability of the project team human resources and acquiring the team 
                                                                                                                                     organizational relationships, and creating a staffing plan.                                                                     necessary to successfully complete the project.
                                         Management Styles  Even though these are not in the PMBOK, you should be familiar with  .1 Project Management Plan .1 Organization charts and             .1 HR Management Plan                                             .1 HR Management Plan            .1 Pre‐assignment           .1 Project staff assigment
                                         the different types of management styles:                                                                                  position descriptions
                                         ●  Autocratic  The manager makes all the decisions.                                         .2 Activity Resources          .2 Networking                                                                                    .2 Enterprise environmental      .2 Negotiation                              .2 Resource Calendars
                                         ●  Democratic  The team is involved in the decision‐making process.                         Requirement                                                                                                                     factors
                                         ●  Laissez‐faire  The team is self‐led (as in Agile project management).                    .3 Enterprise environmental .3 Organizational theory                                                                            .3 Organizational process        .3 Acquisition                              .3 Project Management Plan 
                                         ●  Exceptional  Looking at only the top and bottom 10 percent of performers (that is, who  factors                                                                                                                          assets                                                                       updates
                                         is doing well and who is not).                                                              .4 Organizational process      .4 Expert Judgment                                                                                                                .4 Virtual teams
                                                                                                                                     assets
                                         Types of Power  As leader of a team, the PM needs to be aware of different types of                                        .5 Meeting                                                                                                                        .5 Multi Criteria decition 
                                         power. Here are the different types of power you as the PM can use:                                                                                                                                                                                          analysis
                                         ●  Formal  (legitimate) Based on a person’s position or level in the company.
                                         ●  Reward  Giving people awards to get things done or in recognition for a job well done.
                                         ●  Penalty  (coercive) The opposite of reward (the worst).                                                                                                                                                                  9.3 Develop Project Team
                                         ●  Expert Recognized  for knowledge and experience (the best).                                                                                                                                                              Improving the interaction and the team’s competency to perform better as part of the 
                                         ●  Referent  Referring to the authority of someone in higher position (name dropper). “The                                                                                                                                  overall project team.
                                         vice president has made it clear this project takes top priority.”                                                                                                                                                          .1 Human resources             .1 Interpersonal skills     .1 Team Performance 
                                                                                                                                                                                                                                                                     Management Plan                                            Assessments
                                                                                                                                                                                                                                                                     .2 Project Staff Assignments .2 Training                   .2 Enterprise Environmental 
                                                                                                                                                                                                                                                                                                                                Factors updates
                                                                                                                                                                                                                                                                     .3 Rersource Calendars        .3 Team building activities
.4 Ground rules
                                                                                                                                                                                                                                                                                                      .5 Co‐location                           
                                                                                                                                                                                                                                                                                                      .6 Recognition and rewards
                                                                                                                                                                                                                                                                                                      .7 Personal Assessment tools
                                                                                                                                                                                                                                                                     9.4 Manage Project Team
                                                                                                                                                                                                                                                                     Tracking individual team member performance, providing feedback, managing and 
                                                                                                                                                                                                                                                                     resolving issues, and managing changes to optimize the team’s performance.
                                                                                                                                                                                                                                                                     .1 Human resources            .1 Observation and           .1 Change request
                                                                                                                                                                                                                                                                     Management Plan               conversation
                                                                                                                                                                                                                                                                     .2 Project Staff Assignments .2 Project Performanve        .2 Project Management Plan 
                                                                                                                                                                                                                                                                                                   Appraisais                   updates
                                                                                                                                                                                                                                                                     .3 Team Performance           .3 Confilct Management       .3 Project Documents 
                                                                                                                                                                                                                                                                     Assessments                                                updates
                                                                                                                                                                                                                                                                     .4 Issue log                 .4 Interpersonal Skills       .4 Enterprise Environmental 
                                                                                                                                                                                                                                                                                                                                factors updates
                                                                                                                                                                                                                                                                     .5 Work Perfornmance 
                                                                                                                                                                                                                                                                     reports
                                                                                                                                                                                                                                                                     .6 Organizational propcess 
                                                                                                                                                                                                                                                                     assets
Project Communication 
Project Communication
                                         Communication can be classified into the following two categories:                                                                                                                                                                                                                                                                                                                                                                       2. One‐way communication. There are two kinds of one‐way communication:
          Management
Management
                                                                                                                                             11.4 Performance Quantitative Risk Analysis
                                                                                                                                             Παρουσίαση ποσοτικής ανάλυσης κινδύνου
                                                                                                                                             .1 Risk Management Plan        .1 Data gathering and                                   .1 Project documents 
                                                                                                                                                                            representation techniques                               updates
                                                                                                                                             .2 Cost Management Plan        .2 Quantitive risk analysis 
                                                                                                                                                                            and modeling techniques
                                                                                                                                              .3 Schedule Management        .3 Expert judgment
                                                                                                                                             Plan
                                                                                                                                             .4 Risk register
                                                                                                                                             .5 Enterprise Enviromental 
                                                                                                                                             Factors
                                                                                                                                             .6 Organizational process 
                                                                                                                                             assets
                                                                                                                                             11.5 Plan Risk responses
                                                                                                                                             Σχεδιασμός αντίδρασης κινδύνου
                                                                                                                                             .1 Risk Management Plan     .1 Strategies for negative       .1 Project mamagement plan 
                                                                                                                                                                         risks or threats                 updates
                                                                                                                                             .2 Risk register            .2 Strategies for positive risk  .2 Porject document updates
                                                                                                                                                                         or opportnities
                                                                                                                                                                         .3 Contingent response 
                                                                                                                                                                         strtegies
                                                                                                                                                                         .4 Expert Judgment
Project Procurement 
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Project Procurement 
        Management
Management
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Project Stakeholders 