[YEAR 2019]
USER MANUAL
FOR
PROCUREMENT CYCLE
FOR
USER MANUAL- Procurement Cycle
DOCUMENT RELEASE DETAILS
Prepared by Designation Date Signature
1 Rajiv Sarkar
Reviewed By Designation Date Signature
1 N.K.Kumbhakar
Approved By Designation Date Signature
1
Project Name: Training Vesion 1 Page 1
USER MANUAL- Procurement Cycle
DOCUMENT REVISION DETAILS
Document Name: PROCUREMENT CYCLE USER MANUAL
Version No.: 1.0
Revision Page Description Action Taken
No.
No. Date Topic
Project Name: Training Vesion 1 Page 2
USER MANUAL- Procurement Cycle
Table of Contents
1. INTRODUCTION ..................................................................................................................................... 4
2. ORGANIZATION STRUCTURE ........................................................................................................... 6
3. PROCUREMENT PROCESS OVERVIEW ......................................................................................... 8
4. PROCUREMENT CYCLE STEPS ...................................................................................................... 11
5. MASTER DATA MANAGEMENT ....................................................................................................... 12
a. Material Master Maintenance............................................................................................................ 12
b. Vendor Master Maintenance ............................................................................................................. 38
6. MATERIAL PROCUREMENT CYCLE .............................................................................................. 55
a. Purchase Requisition ......................................................................................................................... 55
b. Purchase Order .................................................................................................................................... 70
c. Creation of Contract ........................................................................................................................... 91
d. Goods Receipt .................................................................................................................................... 102
7. SERVICE PROCUREMENT CYCLE ............................................................................................... 107
a. Service Purchase Requisition ........................................................................................................ 107
b. Service Purchase Order ................................................................................................................... 119
c. Service Entry ...................................................................................................................................... 130
8. GOODS & SERVICE TAX(GST) ...................................................................................................... 137
a. GST Related Oragnisational Change ........................................................................................... 137
b. GST Related Master Data Change ................................................................................................. 138
c. GST Related Process Change ........................................................................................................ 141
Project Name: Training Vesion 1 Page 3
USER MANUAL- Procurement Cycle
1. INTRODUCTION
SAP ERP
It is a packaged software integrates all business functionalities together.
It saves time and cost in the process
SAP MM
Is a part of logistics area and helps to manage procurement activity of an organization
supports all aspects of material management planning and control
Other logistics module like Sales and distribution, Production Planning, Plant maintenance,
Warehouse management are all obsessed with MM .
Features
SAP MM deals with material management and inventory management
SAP MM ensures there is never a shortage of materials or any gaps in the supply chain
process
It deals with the Procurement Process, Master Data (Material & Vendor Master) , Account
Determination & Valuation of Material, Inventory Management, Invoice Verification,
Material
Requirement Planning etc.
Types of Basic Procurement:
1. External vs Internal Procurement
2. Procurement for Stock vs Consumption
External It is the process of procuring goods or services from external
Procurement vendors. There are 3 basic forms of external procurement generally
supported by the Purchasing component of IT system.
One time orders are generally used for material and services
that are ordered irregularly.
Longer-term contracts with the subsequent issue of release
orders - For materials that are being ordered regularly and in
large quantities, we can negotiate deal with the vendor seller
for pricing or conditions & record then in a contract. In a
contract you also specify the validity date.
Longer-term scheduling agreements and delivery schedules -
Project Name: Training Vesion 1 Page 4
USER MANUAL- Procurement Cycle
If a material is ordered on an everyday basis and is to be
delivered according to an exact time schedule, then you set
up a scheduling agreement.
Internal Large corporate organizations may own multiple separate
Procurement businesses or companies. Internal Procurement is process of getting
material and services from among identical company. So, each of
these companies maintains a complete bookkeeping system with
separate Balance, Profit & Loss Statements so that when trade
occurs between them it will be recorded.
Procurement for A stock material is a material that is kept in stock. These materials are kept
Stock in stock once received from the vendor. The stock of this material keeps
on increasing or decreasing based on amount of the quantity received or
issued. To order a material for stock, the material must have a master
record within the system.
Procurement for When procurement is for direct consumption i.e. it will be consumed as
Direct soon as it is received, the user should specify the consumption
Consumption purpose. To order a material for consumption, the material may have a
master record within the system.
Special Procurement:
Special stocks are stocks that are managed differently as these stocks did not belong to company
and these are being kept at some particular location. Special procurement and special stocks
types are divided into the subsequent areas.
Consignment Stocks Material that is available at our store premises, however it still belongs to
the vendor seller/Owner of the material. If you utilize the material from
consignment stocks, then you have to pay to the vendor.
Third-party In third-party processing, a company passes on a sales order to associate
processing external vendor seller who sends the goods directly to the customer. The
sales order is not processed by your company, however by the vendor
seller. Third-party items can be entered in purchase requisitions, purchase
orders and sales orders.
Pipeline handling In pipeline handling, the company needs not to order or store the
material involved. It is obtainable as and when required via a pipeline for
example, oil or water, or another style of cable such as electricity. The
material that is consumed is settled with the vendor seller on a regular
basis.
Returnable The company orders goods from a vendor seller. The goods are delivered
Transport Stock with returnable transport packaging pallets, containers that belongs to
the vendor seller and is stored on the customer premises until they return
it to the company.
Subcontracting The vendor the subcontractor receives components from the ordering
party with the help of which it produces a product. The product is ordered
Project Name: Training Vesion 1 Page 5
USER MANUAL- Procurement Cycle
by your company through a purchase order. The components required by
the vendor seller to manufacture the ordered product are listed in the
purchase order and provided to the subcontractor.
Stock transfer using Goods are procured and supplied within a company. One plant order the
stock transport goods internally from another plant receiving plant/issuing plant. The
order goods are procured with a special type of purchase order - the stock
transport order. You'll be able to request and monitor the transfer of
goods with a stock transport order.
2. ORGANIZATION STRUCTURE
Organization structure is the framework of company according to which business is conducted
in every company .Organization structure consists of many levels which have relationship to
one or another. Organization structure is also referred as enterprise structure. Enterprise
structure is made up of many organizational units having relationship with one another.
Project Name: Training Vesion 1 Page 6
USER MANUAL- Procurement Cycle
Brief Description of various organization units:
Client The fundamental explanation of Client is as follows: Client is a
commercial organizational unit in R/3 system. It has its own set of
master data with independent table sets. According to hierarchy,
Client is at highest level in SAP system. Data that is maintained at
client level is valid for all organizational levels.
Company Code The fundamental explanation of Company Code is as follows:
Within Client, Company code is the independent accounting unit.
It is a legal entity that has its own profit, loss and balance
statement.
It is the smallest unit in organization for which a complete
independent account set can be replicated.
Plant The fundamental explanation of Plant is as follows:
Plant is an organizational unit within a company where activities
take place. A plant will produce goods and makes goods available
for the company.It is unit having manufacturing facility,
warehouse distribution center or a regional sales office within
logistic. It subdivides an enterprise in different aspects.
Storage Location The fundamental explanation of Storage Location is as follows:
Storage location is an organizational unit which actually
differentiates between different material stocks in a Plant. Storage
location is a place where stock is kept physically. Plant can be
consisting of multiple storage location. All data is stored at storage
location level for a particular storage location.
Purchasing The fundamental explanation of Purchasing Organization is as
Organization follows:
Purchasing Organization is an organizational unit under company
or plant which is responsible for procurement activities according
to requirements. It is responsible for external Procurement.
Purchasing organization can be at client level i.e. centralized
purchasing organization. Purchasing organization can be at
company or plant level i.e. company specific or plant specific
Different forms of purchasing can be described as follows:
Centralized Purchasing - Purchasing organization is not assigned
to any company code it procures for all company codes belonging
to different client.
Company specific Purchasing - Purchasing organization is
assigned to a company code only, Plant belonging to the company
code
can purchase through this Purchasing organization.
Plant specific Purchasing - Purchasing organization is assigned
to a Plant, only this specific Plant can purchase through this
Purchasing organization.
Purchasing Group The fundamental explanation of Purchasing Group is as follows:
Purchasing group is an organizational unit which is responsible for
everyday procurement activities within an organization.
It is a buyer or group of buyer responsible for procurement
Project Name: Training Vesion 1 Page 7
USER MANUAL- Procurement Cycle
activities in a purchasing organization.
3. PROCUREMENT PROCESS OVERVIEW
Procurement Cycle
Every organization acquires material or services to complete its business needs. The
process of buying materials and obtaining services from vendors or dealers is procurement.
Procurement process should be done in such a way that it is ordered in correct quantity,
with a proper value at the proper time. It is subdivided into following parts:
Basic Procurement
Special Procurement
Basic Procurement
It is a process of acquiring goods or services in the right amount, at the right price at the
right time.So the method of getting services, supplies, and equipment from a vendor seller,
at the right price at the right time in right amount is termed as Procurement. The quality of
procurement is attempting to “get the right balance”, consider the following example:
Organizations try and keep inventory levels at a minimum due to the prices associated with
high levels of inventory; however at identical time it is very expensive to prevent
production due to shortages in raw materials.
Getting the minimum price for a product or service is often necessary, however the balance
between product availability, quality, and vendor seller relations is also necessary.
Procurement Lifecycle
Most modern organizations procurement follow some sequential steps which are described
below:
Requirement and Information Gathering
Procurement process starts with gathering information about product and its quantity. Then for
required products and services, it is necessary to look for suppliers who can satisfy the
requirements.
Supplier Contact
Project Name: Training Vesion 1 Page 8
USER MANUAL- Procurement Cycle
After gathering requirements one will look for the suppliers who can fulfil the requirements.
Based on that quotation request or information request can be made to suppliers or direct
contact can be made with them.
Background Review
Once the supplier is known product/service quality is checked, and any necessities for services
such as installation, warranty and its maintenance are investigated. Some samples of the
products can be obtained for quality examination.
Negotiation
Some negotiations with suppliers is made regarding price, availability and delivery schedule of
the products/services. After this a contract is signed that is a binding legal document between
supplier and ordering party. A contract will include all necessary information like price and
quantity of material, delivery date, etc.
Order fulfilment
Ordered material will be shipped, delivered to the ordering party and supplier is paid
accordingly. Training and Installation of product or services may also be included.
Consumption, Maintenance and Disposal
As the products/service is consumed the performance of the products or services is evaluated
and any follow up service support if required is analysed.
Contract Renewal
Once the product or services are consumed or contract expires and needs to be renewed, or the
product or service is to be re-ordered, company experience with vendors and service provider is
reviewed. If the products or services are to be re-ordered, the company decides whether to
order from previous supplier or think about new suppliers.
Project Name: Training Vesion 1 Page 9
USER MANUAL- Procurement Cycle
Basic Procurement Activities
Basic Procurement activities flow is given in the following image:
Determination of What material/services are
Requirements required ?
The form or electronic transmission used to
Requisition
inform the purchasing department. That the
item or services are needed for a business
purpose
When requisition is approved
Purchase Order
purchase order is created
Goods
Received/Invoice The material is received. Condition and quality
Received are verified. The invoice is received from
Vendor
Invoice
Verification/Vendor
Brief introduction of the procurement activities: Reconciliation of the invoice and PO
Payment is accomplished. The vendor is paid.
Project Name: Training Vesion 1 Page 10
USER MANUAL- Procurement Cycle
Procurement activities Description
Determination of It is the logical subdivision where it is determined that
requirement what material or services are required to company, and
which supplier can fulfill the requirement.
Creating Purchase It is the phase in which purchasing department is informed
Requisition about the requirement of items or services required for
business purpose. A requisition is a internal document.
Creating Purchase It is the phase when order is created from requisition and it
Order is approved and assigned to a supplier.
Goods receipt/ It is the phase in which the material is received by the
Invoice Received company and the condition and quality are verified. In this
phase Invoice is received from the vendor seller.
Invoice verification/ It is the phase in which the vendor seller is paid from the
Vendor Payment company and reconciliation of the invoice.
4. PROCUREMENT CYCLE STEPS
Procurement Cycle steps have been organised into the following three sections.
a) Master Data Management
b) Material Procurement Cycle
c) Service Procurement Cycle
Each of the above is elaborated into detailed steps as below.
A. Master Data Management
The following key master data required to run the procurement process are explained.
Material Master
Vendor Master
B. Material Procurement Cycle
The following basic steps of procurement cycle are elaborated
Purchase Requisition Creation/ Change & Display
Purchase Order Creation Change and Display
Goods Receipt
C. Service Procurement Cycle
Service Requisition Creation/ Change & Display
Service Order Creation Change and Display
Service Entry
Project Name: Training Vesion 1 Page 11
USER MANUAL- Procurement Cycle
5. MASTER DATA MANAGEMENT
a. Material Master Maintenance
a) Creation of Material Master. T-code-MM01
Ster 1: Enter the T-code or go to the Menu path
Step 2: Select the Industry Sector and Material type. Press Enter
Project Name: Training Vesion 1 Page 12
USER MANUAL- Procurement Cycle
Project Name: Training Vesion 1 Page 13
USER MANUAL- Procurement Cycle
Step 3: Select the relevant views and press Enter.
Project Name: Training Vesion 1 Page 14
USER MANUAL- Procurement Cycle
Step 4: Enter the Plant and Storage Location. Press Enter
Project Name: Training Vesion 1 Page 15
USER MANUAL- Procurement Cycle
Project Name: Training Vesion 1 Page 16
USER MANUAL- Procurement Cycle
Step 5: Enter the relevant field data i.e. BASIC DATA-Description, Base unit of Measure, Material group,
External material group and press Enter.
Project Name: Training Vesion 1 Page 17
USER MANUAL- Procurement Cycle
PURCHASING- Purchasing Group, Tax indicator for material, GR processing time and press Enter
Project Name: Training Vesion 1 Page 18
USER MANUAL- Procurement Cycle
Foreign Trade Import : Enter Control Code(HSN), Press Enter
Project Name: Training Vesion 1 Page 19
USER MANUAL- Procurement Cycle
Purchase Order Text: Enter the Long Description of that Material and select the next View.
Project Name: Training Vesion 1 Page 20
USER MANUAL- Procurement Cycle
MRP 1: Enter MRP group, MRP type, MRP controller, Lot Size and press Enter.
Project Name: Training Vesion 1 Page 21
USER MANUAL- Procurement Cycle
MRP 2: Enter Planned Delivery time, Scheduling Margin Key and press Enter
Project Name: Training Vesion 1 Page 22
USER MANUAL- Procurement Cycle
Planned delivery time is 0 for ext. procured material
MRP 3: Enter the Availability Check.
Project Name: Training Vesion 1 Page 23
USER MANUAL- Procurement Cycle
Project Name: Training Vesion 1 Page 24
USER MANUAL- Procurement Cycle
Plant Data/ Storage Location 1: Period indicator for SLED
Project Name: Training Vesion 1 Page 25
USER MANUAL- Procurement Cycle
Plant Data/Storage Location 2: enter the Profit Center
Project Name: Training Vesion 1 Page 26
USER MANUAL- Procurement Cycle
Accounting 1: Valuation Category, Valuation Class, Price Control, Price(Standard/ Moving) and press
Enter
Project Name: Training Vesion 1 Page 27
USER MANUAL- Procurement Cycle
Step 6: Click on to save .
Project Name: Training Vesion 1 Page 28
USER MANUAL- Procurement Cycle
Material is created.
Project Name: Training Vesion 1 Page 29
USER MANUAL- Procurement Cycle
Change of Material Master. T-code:MM02
Step 1:Enter the t-code or go to the menu path
Project Name: Training Vesion 1 Page 30
USER MANUAL- Procurement Cycle
Step 2: Enter the Material No. and press Enter
Step3 : Select the View/views to change the field data.
Project Name: Training Vesion 1 Page 31
USER MANUAL- Procurement Cycle
Step 4: Enter the relevant Plant and press Enter.
Project Name: Training Vesion 1 Page 32
USER MANUAL- Procurement Cycle
Step 5: Do the necessary changes in relevant field .
Project Name: Training Vesion 1 Page 33
USER MANUAL- Procurement Cycle
Step 6: Click on Button to save the Change.
Project Name: Training Vesion 1 Page 34
USER MANUAL- Procurement Cycle
C) Display Material Master: T-code: MM03
Step 1: Enter the T-code or go to menu path
Project Name: Training Vesion 1 Page 35
USER MANUAL- Procurement Cycle
Step 2: Enter the Material No. and Press Enter.
Step 3: Select the view/views has to be display and press Enter .
Project Name: Training Vesion 1 Page 36
USER MANUAL- Procurement Cycle
Step4: Enter the Plant and press Enter
Project Name: Training Vesion 1 Page 37
USER MANUAL- Procurement Cycle
b. Vendor Master Maintenance
Project Name: Training Vesion 1 Page 38
USER MANUAL- Procurement Cycle
A) Creation of Vendor Master Data. T-code: XK01
Step 1: Enter the T-code or go to the menu path
Step 2: Enter Company code, Purchasing Organization, Account group and press Enter
Project Name: Training Vesion 1 Page 39
USER MANUAL- Procurement Cycle
Step 3: Enter Title, Name, Search term ½, Street/House number, Postal Code/City, Country, Region,
Telephone, Fax, E-Mail and press Enter
Project Name: Training Vesion 1 Page 40
USER MANUAL- Procurement Cycle
Project Name: Training Vesion 1 Page 41
USER MANUAL- Procurement Cycle
Step 4: Enter Tax Number 1, Tax Number 3, Industry
Step 5: Enter Country, Bank key, Bank Account,
Project Name: Training Vesion 1 Page 42
USER MANUAL- Procurement Cycle
Project Name: Training Vesion 1 Page 43
USER MANUAL- Procurement Cycle
Step 6: Enter Recon. Account, Cash mgmnt group, Release group, Certification date and press Enter
Step 7: Enter Payment Terms, Payment methods, House Bank, Check double inv.
Project Name: Training Vesion 1 Page 44
USER MANUAL- Procurement Cycle
Step 8: Enter Account Statement and press Enter
Project Name: Training Vesion 1 Page 45
USER MANUAL- Procurement Cycle
Step 9: Enter Order currency, Terms of payment, Incoterms, Schema Group, Vendor, GR based inv.
Verification .
Project Name: Training Vesion 1 Page 46
USER MANUAL- Procurement Cycle
Step 10: Click on to crate Vendor master data.
Project Name: Training Vesion 1 Page 47
USER MANUAL- Procurement Cycle
Vendor has been created for company code GRSE Purchasing Org. GRSE.
Project Name: Training Vesion 1 Page 48
USER MANUAL- Procurement Cycle
B) Change Vendor master Data. T-code:XK02
Step 1: Enter the T-code or go to menu path.
Project Name: Training Vesion 1 Page 49
USER MANUAL- Procurement Cycle
Step 2: Enter Vendor no., Company code, Purchase Org. and select the relevant view/views. Press
Enter .
Project Name: Training Vesion 1 Page 50
USER MANUAL- Procurement Cycle
Step 3: Click on to save the Changes.
C) Display Vendor master Data. T-code:XK03
Step 1: Enter T-Code or go to Menu path.
Project Name: Training Vesion 1 Page 51
USER MANUAL- Procurement Cycle
Step 2: Enter Vendor, Company Code, Purchase Organization and select the Views and press
Enter.
Project Name: Training Vesion 1 Page 52
USER MANUAL- Procurement Cycle
Project Name: Training Vesion 1 Page 53
USER MANUAL- Procurement Cycle
Project Name: Training Vesion 1 Page 54
USER MANUAL- Procurement Cycle
Step 3: Do the necessary Changes in Relevant Field
6. MATERIAL PROCUREMENT CYCLE
a. Purchase Requisition
a) Creation of Purchase Requisition: Tcode –ME51N
1. Step 1: Enter the tcode or go to the below menu:
Project Name: Training Vesion 1 Page 55
USER MANUAL- Procurement Cycle
2. Step 2 : Press enter after entering tcode or double click on the selected menu
Project Name: Training Vesion 1 Page 56
USER MANUAL- Procurement Cycle
3. Step 3: Enter Documet type, Text at Header note, material , quantity, plant, purchasing group,
requested by , tracking no, valuation price
Project Name: Training Vesion 1 Page 57
USER MANUAL- Procurement Cycle
4. Click on the button to check if the document is complete.
5. Now click on button, the purchase requisition will be created .
Project Name: Training Vesion 1 Page 58
USER MANUAL- Procurement Cycle
b) Change purchase requisition : Tcode ME52N
1. Step 1: Enter the tcode or go to the below menu:
2. Step 2: Press enter or double click the selected menu. Then click on the button, enter the
purchase requisition you want to change
Project Name: Training Vesion 1 Page 59
USER MANUAL- Procurement Cycle
Step 3 : Press enter
Step 4: Change the value of the field you want to change (for example quantity)
Project Name: Training Vesion 1 Page 60
USER MANUAL- Procurement Cycle
Step 5: Click on button. The purchase requisition is changed.
Project Name: Training Vesion 1 Page 61
USER MANUAL- Procurement Cycle
C) Display Purchase requisition. T-code- ME53N
Step 1: Enter the T-code or go to the below menu path.
3. Step 2 : Press enter after entering t-code or double click on the selected menu
Project Name: Training Vesion 1 Page 62
USER MANUAL- Procurement Cycle
d) Print Purchase requisition. T-code: ZMM_INDENT
Step1: Enter the T-code
Step2: Enter the Purchase requisition No. and click on button.
Project Name: Training Vesion 1 Page 63
USER MANUAL- Procurement Cycle
Step3: Go to the menu List>Print
Step4: Select the Output Device and click on
Project Name: Training Vesion 1 Page 64
USER MANUAL- Procurement Cycle
e) Release of Purchase Requisition. T-code: ME54N
Step 1: Enter the T-code or go to the menu path
Project Name: Training Vesion 1 Page 65
USER MANUAL- Procurement Cycle
Step 2: Click on button and enter the relevant Purchase Requisition no. and Press Enter.
Project Name: Training Vesion 1 Page 66
USER MANUAL- Procurement Cycle
Step 3: Click on button of relevant Release Level to release that document for 1st level
Project Name: Training Vesion 1 Page 67
USER MANUAL- Procurement Cycle
Step 4: Click on button of relevant Release Level to release that document for 2nd level
Project Name: Training Vesion 1 Page 68
USER MANUAL- Procurement Cycle
Step 5: click on button to release this document for further use.
Project Name: Training Vesion 1 Page 69
USER MANUAL- Procurement Cycle
b. Purchase Order
7. CREATION OF PURCHASE ORDER. T-CODE:ME21N
Step 1: Enter the t-code or go to the menu path
Project Name: Training Vesion 1 Page 70
USER MANUAL- Procurement Cycle
Step 2: Select the Relevant Document Type .
Step 3: Enter Vendor, Header Texts under Test tab, Purchase org, Purchasing group, Company code under
Org. Data tab
Project Name: Training Vesion 1 Page 71
USER MANUAL- Procurement Cycle
Step 4: Click on “Document Overview on”
Project Name: Training Vesion 1 Page 72
USER MANUAL- Procurement Cycle
Step 5: Select Purchase Requition
Step 6: enter the Purchase requisition no. in the relevant field. Press button
Project Name: Training Vesion 1 Page 73
USER MANUAL- Procurement Cycle
Step 7: select the Purchase requisition no. and click on button to Adopt the Purchase requisition in
Purchase Order.
Project Name: Training Vesion 1 Page 74
USER MANUAL- Procurement Cycle
Step8: Go to Condition Tab in Item Details.
Project Name: Training Vesion 1 Page 75
USER MANUAL- Procurement Cycle
Step9: Enter the Unit price of the material
Step 10: select the other condition type (Freight, Discount etc.) by clicking .
Project Name: Training Vesion 1 Page 76
USER MANUAL- Procurement Cycle
Step 11: Enter the Value of respective Conditions.
Project Name: Training Vesion 1 Page 77
USER MANUAL- Procurement Cycle
Step 12: go to the invoice tab and enter the Tax code
Project Name: Training Vesion 1 Page 78
USER MANUAL- Procurement Cycle
Step 13: Click on Taxes to see the Tax calculation.
Project Name: Training Vesion 1 Page 79
USER MANUAL- Procurement Cycle
Step 14: Click on button to check the PO. If no message issued during Check then Click on to save
the PO.
Project Name: Training Vesion 1 Page 80
USER MANUAL- Procurement Cycle
Project Name: Training Vesion 1 Page 81
USER MANUAL- Procurement Cycle
b) Change of Purchase Order. T-code- ME22N
Step 1: enter the t-code or go to the menu path
Project Name: Training Vesion 1 Page 82
USER MANUAL- Procurement Cycle
Step 2: click on to put the PO no.
Project Name: Training Vesion 1 Page 83
USER MANUAL- Procurement Cycle
Step 3: DO THE NECESSARY CHANGES AND CLICK ON BUTTON.
C) DISPLAY OF PURCHASE ORDER. T-code: ME23N
Step 1: ENTER THE T-CODE OR GO TO THE MENU PATH
Project Name: Training Vesion 1 Page 84
USER MANUAL- Procurement Cycle
Step 2: click on to put the PO no. and press enter.
Project Name: Training Vesion 1 Page 85
USER MANUAL- Procurement Cycle
Project Name: Training Vesion 1 Page 86
USER MANUAL- Procurement Cycle
D) Print of Purchase Order.
Step 1: Enter the MM03 and enter and click on button and enter the PO no. press enter.
Step 2: click on Print Overview
Project Name: Training Vesion 1 Page 87
USER MANUAL- Procurement Cycle
Step 3: enter the output device and click on Print preview.
Project Name: Training Vesion 1 Page 88
USER MANUAL- Procurement Cycle
Release of Purchase Order:
c) Release of Purchase Order: Tcode –ME29N
6. Step 1: Enter the tcode or go to the below menu path:
Project Name: Training Vesion 1 Page 89
USER MANUAL- Procurement Cycle
7. Step 2: Click on the Release Field (L0) under Release Option column then click
on the (L3) M for Higher Authority Release and save the document.
Project Name: Training Vesion 1 Page 90
USER MANUAL- Procurement Cycle
8. Step 3: P.O Released for both P.O creator and Manager.
4. Step 4 : Save the PO.
c. Creation of Contract
A) CREATION OF CONTRACT. T-CODE:ME31K
STEP 1: Enter T-code or go to menu path
Project Name: Training Vesion 1 Page 91
USER MANUAL- Procurement Cycle
Step 2: Enter the Vendor, Agreement type (value/Quantity), Agreement Date, Purchase org, Purchasing
group and press Enter
Step 3: Enter Validity Start / End date, Payment terms and Incoterms.
Project Name: Training Vesion 1 Page 92
USER MANUAL- Procurement Cycle
Step 4: Click on button and enter the Material, Target Quantity, Net Price, Plant
Project Name: Training Vesion 1 Page 93
USER MANUAL- Procurement Cycle
Step 5: Click on
Project Name: Training Vesion 1 Page 94
USER MANUAL- Procurement Cycle
Project Name: Training Vesion 1 Page 95
USER MANUAL- Procurement Cycle
Project Name: Training Vesion 1 Page 96
USER MANUAL- Procurement Cycle
b) Change of Contract. T-code: ME32K
Step 1: Enter the T-code or go to the menu path
Project Name: Training Vesion 1 Page 97
USER MANUAL- Procurement Cycle
Step 2: Enter the Contract Agreement No. and press Enter.
Step 3: Do the necessary changes in the relevant field (exmpl: change in Qty). and click on button .
Project Name: Training Vesion 1 Page 98
USER MANUAL- Procurement Cycle
Step 4: Click on to save the changes.
Project Name: Training Vesion 1 Page 99
USER MANUAL- Procurement Cycle
Quantity Contract Changed.
B) DISPLAY OF CONTRACT. T-CODE: ME33K
Step 1: Enter the T-code or go to the menu path.
Project Name: Training Vesion 1 Page 100
USER MANUAL- Procurement Cycle
Step 2: Enter the Contract Agreement no. and press Enter.
Project Name: Training Vesion 1 Page 101
USER MANUAL- Procurement Cycle
d. Goods Receipt
a) Creation of Goods Receipt: Tcode –MIGO
1. Step 1: Enter the tcode or go to the below menu path:
Project Name: Training Vesion 1 Page 102
USER MANUAL- Procurement Cycle
2. Step 2: Select Good Receipt, Purchase Order from the drop down give
Purchase Order Number, Document Date, Posting Date, Bill of Landing and Tick
the Check Button of Individual Slip press ENTER
3. Step 3: Give Storage Location, Good Recipient, Unloading Point.
Project Name: Training Vesion 1 Page 103
USER MANUAL- Procurement Cycle
4. Step 4: Put the Actual Quantity Received from the Vendor or Party in the Qty in
Delivery Note Field and Tick the Item Ok
5. Step 5: Give the Valuation Type
6. Step 6: Click on the Check option and Post the document
A new MIGO document is created, message shown below.
Project Name: Training Vesion 1 Page 104
USER MANUAL- Procurement Cycle
7. Step: 7 Go to Display Purchase Order and check the Good Receipt Document /
Material Document is visible under tab Purchase Order History.
8. Step: 8 Select Display and Material Document option from the dropdown to
display the Good Receipt Document.
Bill Tracking System
1. BTS: Tcode –ZBTSD01
1. Step 1: Enter the tcode: Give BTS Number press ENTER
2. Step: 2 Here we get all the details of BTS related to Vendor Bill Order.
Project Name: Training Vesion 1 Page 105
USER MANUAL- Procurement Cycle
Project Name: Training Vesion 1 Page 106
USER MANUAL- Procurement Cycle
3. Step: 3 Give Remarks, Tick the Good Receipt No. if it contains Material and
Service Entry Sheet No. if it contains the service.
4. Step:4 i). Click on the button if you want to forward the
respective dept.
ii). Click on the button to certify the Invoice.
iii). Click on the button for cancel or rejection.
7. SERVICE PROCUREMENT CYCLE
a. Service Purchase Requisition
Service Purchase Requisition:
d) Creation of Service Purchase Requisition: Tcode –ME51N
1. Step 1: Enter the tcode or go to the below menu path:
Project Name: Training Vesion 1 Page 107
USER MANUAL- Procurement Cycle
Project Name: Training Vesion 1 Page 108
USER MANUAL- Procurement Cycle
2. Step 2: After the enter the tcode or double click on the selected menu Purchase
Requisition screen appears.
3). Step 3: Enter the Document Type, Header Note, Account Assignment Catg. (K),
Item Category (D) Short Text, Delivery Date,Material Group, Plant, Purchase
Group, Requested By, Tracking No. press Enter then automatically a below Line
Item will open.
Project Name: Training Vesion 1 Page 109
USER MANUAL- Procurement Cycle
Project Name: Training Vesion 1 Page 110
USER MANUAL- Procurement Cycle
4). Step 4: In the below Line Item we have to fill the Service No. Short text, Quantity and
Gross Price.
5. Step 5: In the Account Assignment Tab we have to give G/L Account Number,
Cost Center & WBS Element Number (if necessary).
Project Name: Training Vesion 1 Page 111
USER MANUAL- Procurement Cycle
6. Step 6: Click on the check button to check and save the Service P.R,
a new document number will be created.
Project Name: Training Vesion 1 Page 112
USER MANUAL- Procurement Cycle
b)Change of Service Purchase Requisition: Tcode –ME52N
1). Step 1: Enter the tcode or go to the below menu path:
Project Name: Training Vesion 1 Page 113
USER MANUAL- Procurement Cycle
2). Step 2 : Click on the Other Purchase Requisition tools put the Purchase
Requisition Number/Document Number Press Enter
3). Step 3 : Change the Service Quantity of the PR (As per the requirement).
Project Name: Training Vesion 1 Page 114
USER MANUAL- Procurement Cycle
4) Step 4: Click on the save button to save the Service P.R
Project Name: Training Vesion 1 Page 115
USER MANUAL- Procurement Cycle
c). Display of Service Purchase Requisition: Tcode –ME53N
1). Step 1: Enter the tcode or go to the below menu path:
Project Name: Training Vesion 1 Page 116
USER MANUAL- Procurement Cycle
2. Step 2: Click on the Other Purchase Requisition tools put the Purchase
Requisition Number/Document Number Press Enter for display
f) Print Purchase requisition. T-code: ZMM_INDENT
1). Step1: Enter the T-code
Project Name: Training Vesion 1 Page 117
USER MANUAL- Procurement Cycle
Step2: Enter the Purchase requisition No. and click on button.
Step3: Go to the menu List>Print
Project Name: Training Vesion 1 Page 118
USER MANUAL- Procurement Cycle
Step4: Select the Output Device and click on
b. Service Purchase Order
Service Purchase Order:
b) Creation of Purchase Order: Tcode –ME21N
1. Step 1: Enter the tcode or go to the below menu path:
Project Name: Training Vesion 1 Page 119
USER MANUAL- Procurement Cycle
2. Step 2: After enter the tcode or double click on the selected menu a new screen
appear of Purchase Order.
Project Name: Training Vesion 1 Page 120
USER MANUAL- Procurement Cycle
3. Step 3: Select the Document Type give Short Text
4. Step 4: Give Purchase Organization number, Purchase Group and Company
Code under Org. Data Tab
Project Name: Training Vesion 1 Page 121
USER MANUAL- Procurement Cycle
5. Step 5: Give the Purchase Requisition Number press ENTER then all details will
be fetch from the Purchase Requisition in to the Purchase Order.
6. Step 6: Give Tax Code under Invoice Tab.
7. Step 7: In the below Line Item we can change the Conditions under Conditions
Tab.
Project Name: Training Vesion 1 Page 122
USER MANUAL- Procurement Cycle
8. Step 8: Click on the check button to check the error and save the
Service P.O, a new document number will be created.
Project Name: Training Vesion 1 Page 123
USER MANUAL- Procurement Cycle
b) Change of Purchase Order: Tcode –ME22N
1). Step 1: Enter the tcode or go to the below menu path:
Project Name: Training Vesion 1 Page 124
USER MANUAL- Procurement Cycle
2). Step 2 : Click on the Other Purchase Order option put the Purchase Order
Number Press Enter
3). Step 3 : Change the Service Quantity of the PO (As per the requirement).
Project Name: Training Vesion 1 Page 125
USER MANUAL- Procurement Cycle
4) Step 4: Click on the save button to save the P.O
Project Name: Training Vesion 1 Page 126
USER MANUAL- Procurement Cycle
c). Display of Purchase Order: Tcode –ME23N
1). Step 1: Enter the tcode or go to the below menu path:
Project Name: Training Vesion 1 Page 127
USER MANUAL- Procurement Cycle
2. Step 2: Click on the Other Purchase Order option put the Purchase Order
Number Press Enter for Display
g) Print Purchase Order.
1). Step1: Click on the Print Preview Option
Project Name: Training Vesion 1 Page 128
USER MANUAL- Procurement Cycle
2). Step2: Enter the Print Preview button.
3). Step3: Go to the menu Text>Print
Project Name: Training Vesion 1 Page 129
USER MANUAL- Procurement Cycle
c. Service Entry
Service Entry Sheet:
c) Creation of Service Entry Sheet: Tcode –ML81N
2. Step 1: Enter the tcode or go to the below menu path:
Project Name: Training Vesion 1 Page 130
USER MANUAL- Procurement Cycle
3. Step :2 Click on the Other Purchase Order option give the P.O Number press
ENTER
Project Name: Training Vesion 1 Page 131
USER MANUAL- Procurement Cycle
4. Step :3 Click on the Create New option
5. Step :4 Give Short Text and Long Text under Long Txt Tab menu
6. Step :5 Give Quality of Service and Service Timeline.
Project Name: Training Vesion 1 Page 132
USER MANUAL- Procurement Cycle
7. Step :6 Give Completion Date under Addnl Data tab
8. Step :7 Give Document Date and Posting Date under Accept. Data Tab.
Project Name: Training Vesion 1 Page 133
USER MANUAL- Procurement Cycle
9. Step :8 Give Service Location, Period, Responsible Internally (Company
Person) and Externally (Vendor Name).
10. Step :9 Click on the Service Sel. Option to fetch the Service Line item.
Project Name: Training Vesion 1 Page 134
USER MANUAL- Procurement Cycle
11. Step :10 Click on the Tick Button
Project Name: Training Vesion 1 Page 135
USER MANUAL- Procurement Cycle
12. Step :11 A new screen will appear then select the Line item and click on the
Services option on the top left of the screen press ENTER
13. Step :12 Click the Acceptance button and save the Service Entry
Sheet. See the Green Signal which means this Entry Sheet is
Approved.
Project Name: Training Vesion 1 Page 136
USER MANUAL- Procurement Cycle
14. Step :13 Go to Display Purchase Order and check the Service Entry sheet is
visible under tab Purchase Order History.
8. GOODS & SERVICE TAX(GST)
The new indirect taxation regime in India from July 2019, (GST) requires the businesses to
register in every state of establishment. The registration number obtained upon registration is
called as GSTIN (GST Identification Number).
The GSTINs obtained by the organization must be maintained in the system, along with their
registered addresses.
a. GST Related Oragnisational Change
In every (A/R and A/P) transaction relevant to tax, the GSTIN of the organization must be
captured in the transaction. Periodically, the GST returns are to be submitted to the
Government of India, which must contain the relevant GSTIN. GST returns are to be
submitted for each GSTIN separately
Government of India will be able to identify the organization only through its GSTIN
To facilitate this the Business Place feature needs to be activated. For every GSTIN
registration in a company, a business place needs to be created in SAP and assigned to the
corresponding company code.
In order to ensure that every A/R and A/P transaction (triggered from Materials Management
and Sales & Distribution) captures the GSTIN of the organization, the business place must
be assigned to Plant
Multiple plants in one state can be assigned to one Business Place
Project Name: Training Vesion 1 Page 137
USER MANUAL- Procurement Cycle
b. GST Related Master Data Change
Material Master
In Material Master we have to enter “0” in the field “Tax ind. F. material” in the Purchasing
Tab which indicates that the material is taxable under GST.
After that in the tab “Foreign trade import” we will enter the HSN code of that material.
Project Name: Training Vesion 1 Page 138
USER MANUAL- Procurement Cycle
SERVICE MASTER
Similarly, while creating service master in Tcode AC03, in the tax indicator field we
will enter “0” which means taxable under GST and in the field “Tax Tariff Code” we
will enter the relevant SAC code for that particular service.
Project Name: Training Vesion 1 Page 139
USER MANUAL- Procurement Cycle
VENDOR MASTER
While creating Vendor in Tcode XK01, we will select the CIN details tab and there in
the GST details tab we will select “GST VEN class” as blank which means that the
vendor is registered.
Then in tax category “the TAX number 3” field we will enter the GST number of the vendor.
Project Name: Training Vesion 1 Page 140
USER MANUAL- Procurement Cycle
c. GST Related Process Change
While creating PO we will enter the relevant tax code in the Invoice tab of Item details, and
in the India tab the control code of the material will appear.
Project Name: Training Vesion 1 Page 141
USER MANUAL- Procurement Cycle
While creating Invoice in Tcode “MIRO”. After GST we will have to enter the Business
place and Section in Basic Data tab under “Bus.place/sectn”.
Project Name: Training Vesion 1 Page 142