Classification: Internal Use
DEPARTMENT: OCCUPATION :
KOP ELECTRICAL Analysis by : Ibrahim Al-
TECHNICAN Ibrahim
TASK ANALYZED: Reviewed by : Bassam
PROGRAM
CONNECT/DISCONNECT LOW NEEDS
VOLTAGE (UPTO 480V) MOTOR
TARGET COMPLETION DATE
Date : Page 1 of 2
RESPONSIBLE AREA SUP.
03/12/2018
ACTION TAKEN *
SKILL TRAINING
Loss Efficien RECOMMEND
Significan
INDUSTRIAL HYG. REVIEW
Exposures cy ED
PROCEDURE/ PRACTICE
t Steps (Consider Safety, Check CONTROLS
SPECIAL RULES
(Break- Health, Damage,
down Fire, Quality,
Serial No
critical task Production probl
into steps) ems, as well as
People, Yes No
Equipment,
Materials and
Environment
Interactions)
1 Obtain Work Electric shock Yes Site visit for seeing
PROCEDURE
Permit actual condition at
site, Lock out, tag
out of equipment
requirement, PPE
/Make JSA
2 Perform Tag Locking Yes Check motor tag and
out / Lock wrong motor operation lock,
PROCEDURE
out of Motor starter Stand on the side of
Breaker in Breaker the breaker and
Cubicle damage operate
located at Personal
Substation injury
3 Test from Operating Yes Check motor tag
field junction wrong switch number and
box and tripping operation tag
near by motor
Open Motor Hand injury
PROCEDURE
4
Terminal Equipment Use proper gloves/
Box at field damage / loss Yes PPE
of j.box gasket
Classification: Internal Use
OCCUPATION :
DEPARTMENT: ELECTRICAL Analysis by : Ibrahim Al-
KOP TECHNICAN Ibrahim
Reviewed by : Bassam
PROGRAM
NEEDS
TASK ANALYZED:(TASK INVENTORY
SERIAL NO. 2 )
CONNECT/DISCONNECT LOW
TARGET COMPLETION DATE
RESPONSIBLE AREA SUP.
VOLTAGE (UPTO 480V) MOTOR Date : Page 2 of 2
ACTION TAKEN *
03/12/2018
SKILL TRAINING
Loss Efficien RECOMMEND
Significan
INDUSTRIAL HYG. REVIEW
Exposures cy ED
PROCEDURE/ PRACTICE
t Steps (Consider Safety, Check CONTROLS
SPECIAL RULES
(Break- Health, Damage,
down Fire, Quality,
Serial No
critical task Production probl
into steps) ems, as well as
People, Yes No
Equipment,
Materials and
Environment
Interactions)
5 Mark motor Hand injury Yes Use proper gloves/
terminals, Electric shock PPE , Use insulated
cable leads Wrong phase tools, Follow
and remove sequence/ existing color code
the insulation termination & markings
from the cable damage
terminations
6 Disconnect Hand injury Yes Use proper gloves/
PROCEDURE
motor power Electric shock PPE , Use insulated
cable, Wrong phase tools, Follow
Grounding sequence/ existing color code
cable termination & markings
cable damage
7 Pull out the Hand injury Yes Use proper gloves/
PROCEDURE
cable and cable damage PPE
tape together
to the
termination
Box
8 For Hand injury Yes Use proper gloves/
PROCEDURE
connecting, cable damage PPE
Pull in the
cable to the
terminal box
9 Remove Hand injury Yes Use proper gloves/
PROCEDUR
insulation Electric shock PPE
E
cable damage
Classification: Internal Use