Program Needs: Analysis By: Reviewed by

This document analyzes the task of connecting and disconnecting low voltage (up to 480V) motors. It breaks the task down into 6 steps: 1) obtaining a work permit, 2) performing lock out/tag out of the motor breaker, 3) testing from the field junction box, 4) opening the motor terminal box, 5) marking motor terminals and cable leads, and 6) disconnecting motor power. For each step it identifies potential safety exposures and recommends procedures and controls to mitigate risks.

Uploaded by

sajidkaleem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views3 pages

Program Needs: Analysis By: Reviewed by

This document analyzes the task of connecting and disconnecting low voltage (up to 480V) motors. It breaks the task down into 6 steps: 1) obtaining a work permit, 2) performing lock out/tag out of the motor breaker, 3) testing from the field junction box, 4) opening the motor terminal box, 5) marking motor terminals and cable leads, and 6) disconnecting motor power. For each step it identifies potential safety exposures and recommends procedures and controls to mitigate risks.

Uploaded by

sajidkaleem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Classification: Internal Use

DEPARTMENT: OCCUPATION :
KOP ELECTRICAL Analysis by : Ibrahim Al-
TECHNICAN Ibrahim
TASK ANALYZED: Reviewed by : Bassam
PROGRAM
CONNECT/DISCONNECT LOW NEEDS
VOLTAGE (UPTO 480V) MOTOR

TARGET COMPLETION DATE


Date : Page 1 of 2

RESPONSIBLE AREA SUP.


03/12/2018

ACTION TAKEN *
SKILL TRAINING
Loss Efficien RECOMMEND
Significan

INDUSTRIAL HYG. REVIEW


Exposures cy ED

PROCEDURE/ PRACTICE
t Steps (Consider Safety, Check CONTROLS

SPECIAL RULES
(Break- Health, Damage,
down Fire, Quality,
Serial No

critical task Production probl


into steps) ems, as well as
People, Yes No
Equipment,
Materials and
Environment
Interactions)

1 Obtain Work  Electric shock Yes Site visit for seeing  

PROCEDURE
Permit actual condition at
site, Lock out, tag
out of equipment
requirement, PPE
/Make JSA
2 Perform Tag  Locking Yes Check motor tag and  
out / Lock wrong motor operation lock,

PROCEDURE
out of Motor starter Stand on the side of
Breaker in  Breaker the breaker and
Cubicle damage operate
located at  Personal
Substation injury
3 Test from  Operating Yes Check motor tag  
field junction wrong switch number and
box and tripping operation tag
near by motor
 
 
 
Open Motor  Hand injury  
PROCEDURE

4
Terminal  Equipment Use proper gloves/  
Box at field damage / loss Yes PPE
of j.box gasket
Classification: Internal Use

OCCUPATION :
DEPARTMENT: ELECTRICAL Analysis by : Ibrahim Al-
KOP TECHNICAN Ibrahim
Reviewed by : Bassam
PROGRAM
NEEDS
TASK ANALYZED:(TASK INVENTORY
SERIAL NO. 2 )
CONNECT/DISCONNECT LOW

TARGET COMPLETION DATE


RESPONSIBLE AREA SUP.
VOLTAGE (UPTO 480V) MOTOR Date : Page 2 of 2

ACTION TAKEN *
03/12/2018

SKILL TRAINING
Loss Efficien RECOMMEND
Significan

INDUSTRIAL HYG. REVIEW


Exposures cy ED

PROCEDURE/ PRACTICE
t Steps (Consider Safety, Check CONTROLS

SPECIAL RULES
(Break- Health, Damage,
down Fire, Quality,
Serial No

critical task Production probl


into steps) ems, as well as
People, Yes No
Equipment,
Materials and
Environment
Interactions)

5 Mark motor  Hand injury Yes Use proper gloves/  


terminals,  Electric shock PPE , Use insulated
cable leads  Wrong phase tools, Follow
and remove sequence/ existing color code
the insulation termination & markings
from the  cable damage
terminations
6 Disconnect  Hand injury Yes Use proper gloves/  

PROCEDURE
motor power Electric shock PPE , Use insulated
cable,  Wrong phase tools, Follow
Grounding sequence/ existing color code
cable termination & markings
 cable damage
7 Pull out the  Hand injury Yes Use proper gloves/  
PROCEDURE

cable and  cable damage PPE


tape together
to the
termination
Box
8 For  Hand injury Yes Use proper gloves/  
PROCEDURE

connecting,  cable damage PPE


Pull in the
cable to the
terminal box

9 Remove  Hand injury Yes Use proper gloves/  


PROCEDUR

insulation  Electric shock PPE



E

cable damage
Classification: Internal Use