Job wise labour rates for maintenance works for the year 2015-16- Justification thereof.
S.No.                                   Particulars                                 Rate as per    Wages fixed by       No. of     Working Cost of      Net    Total   Over Head charges @ 2
                                                                                     SOR for        Collector for       Labour    Hour / per Material Amount   (Rs.)
                                                                                     2014-15      Unskilled / Semi-    Required    Labour    Involved  (Rs.)
                                                                                                   skilled / Skilled                           (Rs.)
                                                                                                  Labour for 8 hour
                                                                                                   working per day
                                                                                                        (Rs.)
 1                             Straitening of leaned poles:-
        (a) Straitening of 140 Kg 8 mtr long PCC poles                                 222               223              3          2       35.50    167      203       41
            (Including pit digging Straitening & back filling with boulders &
            ramming including cost of boulders)
        (b) Straitening of 272 Kg 9.1 mtr long PCC poles                               335               223              4          2        80      223      303       61
            (Including pit digging, Straitening & back filling with boulders &
            ramming including cost of boulders)
        (c) Rail pole / H-Beam / R.S.Joist (175x85 mm)                                 416               223              5          2       97.50    279      376       75
            (Including pit digging, Straitening & back filling with boulders &
            ramming including cost of boulders)
        (d) R.S.Joist (125x70 mm)                                                      352               223              4          2       94.50    223      318       64
            (Including pit digging, Straitening & back filling with boulders &
            ramming including cost of boulders)
 2          Dismentling of damaged old support completely (For 33 KV & 11
            KV lines)
        (a) 140 Kg 8 mtr long PCC pole                                                 203               223              2          2        70      112      182       36
            Taking out of V cross arm, top clamp insulators, 4 pin cross arm
            etc. de-erection of pole & shifting
        (b) 272 Kg 9.1 Mtr long PCC Pole                                               228               223              2          2       90.50    112      202       40
            Taking out of V cross arm, top clamp insulators etc., de-erection of
            pole & shifting
        (c) Rail pole / H-Beam / R.S.Joist (175x85 mm)                                 664               223              5          2       304.50   279      583       117
            Cutting of pole by gas cutter / Dismentling, taking out of V-cross
            arm, top clamp insulators etc. shifting & loading in Board's vehicle.
        (d) R.S.Joist (125x70 mm)                                                      605               223              4          2        305     223      528       106
            Cutting of pole by gas cutter / Dismentling, taking out of cross arm,
            4 pin cross arm and insulators etc. shifting and loading in
            company's Vehicle
 3          Renovation of stay providing stay wire only where stay rod is found         72               223             1.50       1.50       4      63       67        13
            intact
4         New stay- Pit digging, grouting, concreting & erection
          (i) New stay for 33 KV line 20 mm                                    320   230    4      2     60.50     230        291       58
          (ii) New stay for 11 KV line 16 mm                                   188   230    1      2     105.50    58         163       33
    (a) For urban areas with concreting cement will be provided by the         189   240    1      2     107.50    60         168       34
        board
    (b) For rural areas with stone block                                       158   240    1      2     81.50     60         142       28
5         Painting of poles : cleaning of metallic surface by wire brush, 2
          coats of red oxide & 1 coat of Aluminium paint on all the steel
          surfaces, paint will be provided by the board & wire brush will be
          provided by the contractor.
    (a) Rail pole, R.S.Joist, H-Beam                                           183   240    1      2     102.50    60         163       33
    (b) V-cross arm & Top clamp 11 KV & 33 KV                                   71   240   1.50   1.50    3.50     68         71        14
    (c) LT 3 / 4 / 5 Pin cross arm each                                        38    240    1      1      6.50     30         37        7
    (d) DC channel (8',5',4', SPC) for 33 KV & 11 KV                           64    240   1.50    1       16      45         61        12
6   (a) Numbering of poles:- Preparing base by black paint at the height       35    240    1      1      4.50     30         35         7
        of 05 feet from ground level for writing pole number with white
        paint of size 4" including cost of paint and labour charges.
    (b) Obtaining G.I.S. co-ordinates per pole (latitude & longitude) for                                         5.00 per 5.00 per
        works to be executed in R-APDRP town areas.                                                               location/ location/
                                                                                                                    pole      pole
7         Painting of X-mer:- Cleaning of X-mer body with water, brush,
          detergent & providing paint labour charges only, paint shall be
          provided by board
    (a) 25 KVA X-mer: 2 coats of Red oxide & one coat of Gray paint            215   230    2      2     76.50     115        192       38
    (b) 50/63 KVA X-mer: 2 coats of Red oxide & one coat of Gray paint         277   230    2      2      128      115        243       49
    (c)   100 KVA X-mer: 2 coats of Red oxide & one coat of Gray paint         340   230    2      2      180      115        295       59
    (d)   200 KVA X-mer: 2 coats of Red oxide & one coat of Gray paint         352   230    2      2     190.50    115        306       61
    (e)   315 KVA X-mer: 2 coats of Red oxide & one coat of Gray paint         377   230    2      2      211      115        326       65
    (f)   500 KVA X-mer 2 coats of Red oxide & one coat of Gray paint          500   230    2      2      314      115        429       86
8         Straitening of tilted V cross arm & top clamps provided with back
          clamps
    (a)   33 KV V-cross arm (Where replacement of V-cross arm not              59    230   1.50   1.25    0.50     54         54        11
          required :- Material supplied by board
    (b)   11 KV V-cross arm (Where replacement of V-cross arm not              33    230    1      1       2       29         31        6
          required :- Material supplied by board
    (c)   33 KV Top clamp (Where replacement of V cross arm not                20    230    1     0.65     0       19         19        4
          required :- Material supplied by board
    (d)   11 KV Top clamp (Where replacement of V cross arm not                20    230    1     0.65     0       19         19        4
          required :- Material supplied by board
9         Replacement of bent V cross arm :- Taking out of bent cross arm &
          replacement by new one along with taking out of 02 No. insulators,
          binding opening & again providing the same.
(a) 33 KV   113   223   1   2   40.50   56   96   19
(b) 11 KV    89   223   1   1    47     28   75   15
10         Replacement of Top clamps:- Taking out of damaged top clamp, 01
           No. insulator opening, binding & again providing New top clamp
           along with fixing of insulator & rewinding
     (a) 33 KV                                                                    53     223   1   1.65         0      46    46    9
     (b) 11 KV                                                                    26     223   1   0.77         1      21    22    4
11       Renovation of earthing of poles for single locations (material shall     0.00                    3                  0     0
         be supplied by the Board)
     (a) 33 KV                                                                    125    223   1    1         77.50    28    105   21
           Pit digging, putting of earthing coil/ with back filling, connecting
           earthing coil with steel structure of pole.
     (b) 11 KV                                                                    119    223   1    1         72.50    28    100   20
           Pit digging, putting of earthing coil/ with back filling, connecting
           earthing coil with steel structure of pole.
     (c) LT line                                                                  83     223   1    1          42      28    70    14
         Pit digging, putting of earthing coil/ with back filling, connecting
         earthing coil with steel structure of pole.
12         Making holes on Rails, R.S.Joist, H-Beam by gas kit / Rachet for       57     223   1    1          22      28    50    10
           earthing / Top clamp fixing etc.
13         Replacement of Damaged Disc insulator taking out of line               215    223   2    2         71.50    112   183   37
           conductor, replacement of Disc & again fixing the line conductor &
           renovation of jumper using trifer or turn buckle.
14         Replacement of Damaged Pin insulator
     (a) 33 KV                                                                    34     223   1    1           1      28    29    6
     (b) 11 KV                                                                    20     223   1   0.63         0      18    18    4
15         Restringing of line conductor for 33/11 KV line work includes
           opening of binding of conductors from the insulators taking out of
           conductors from the Disc & retensioning the conductor & rewinding
           of it as the insulator (ACSR / AAAC Conductor) rates are taken per
           Km per phase
     (a)   Raccoon & Dog conductor per Km / conductor                             1019   223   7    3          282     585   867   173
     (b)   Rabbit conductor                                                        759   223   6    2         308.50   335   643   129
     (c)   Weasel                                                                  630   223   4    2          309     223   532   106
     (d)   Squirrel                                                                500   223   4    1          309     112   421    84
16       Replacement / AUGUMENTATION of line conductor (for 33/11 KV)
         The work includes opening the binding of insulators of the
         sections, dismentling old conductors & coiling the conductor
         properly. laying out New conductor & tensioning it on the line with
         proper sag & binding of the conductor with insulator (ACSR &
         AAC) 1.5 times of standard rate.
     (a) Raccoon & Dog conductor per Km / conductor                             2818   223   10   7        458     1951   2409   482
     (b) Rabbit conductor                                                       2185   223   10   6       200.50   1673   1873   375
     (c) Weasel                                                                 1787   223   10   4        409     1115   1524   305
     (d) Squirrel                                                               1601   223   10   4        254     1115   1369   274
17       Replacement of fixed & moving contacts of AB awitch with
         (Adjustment of complete unit greasing and renovation of jumper
         wire each location)
     (a) 33 KV                                                                  253    223   2    2        103     112    215    43
     (b) 11 KV                                                                  140    223   2    2         9      112    121    24
18      Providing stay insulator to LT lines, cutting of stay wire binding of   82     223   1    2        14      56     70     14
        stay insulators & erection & tightening of stay
19   a. Re-stringing of line conductor in LT, removing of service lines,        275    223   2    2       121.50   112    233    47
        diamond guarding and binding, retensioning of the conductor and
        reproviding diamond guarding, service jumpering etc. (considering
        08 services per span)
     b. Re-stringing of line conductor in LT, diamond guarding and binding,     196    223   2    2       55.50    112    167    33
        retensioning of the conductor and reproviding diamond guarding,
        service jumpering etc. (considering 08 services per span)
20      Providing extension piece to maintain safe clearance as per IE                 223
        rules (each location)
     a. 33 KV each location                                                     277    223   2    2        123     112    235    47
     b. 11 KV each location                                                     203    223   2    2       61.50    112    173    35
21       Straitening of DP                                                      254    223   2    2       103.50   112    215    43
         Pit digging 50%, loosening of stay straingthning of DP tightening of
         stay and back filling of pit
     a. 33 KV
      1 272 Kg PCC pole                                                         686    223   4    2       355.50   223    579    116
      2 Rail / H-Beam / R.S.Joist                                               808    223   5    3       268.50   418    687    137
     b. 11 KV                                                                                         .
      1 140 Kg PCC pole                                                         461    223   4    2        168     223    391    78
2 Rail / H-Beam / R.S.Joist   630   223   4   2   309   223   532   106
22        Renovation of Carpet guarding
     a. 33 KV                                                             1157   223   8    3     316.50   669   986   197
     b. 11 KV                                                             689    223   5    2      304     279   583   117
     c.   LT line                                                         287    223   2    2      131     112   243   49
23        Service line renovation (only labour charges)
     a. Single phase                                                      99     223   2   1.60     0      89    89    18
     b. Three phase                                                       191    223   2    2     56.50    112   168   34
24        LT jumper renovation                                            20     223   1   0.65     0      18    18    4
25        Tree cutting and trimming of tree branches :-
     a. LT line                                                           53     230   1   1.77     0      51    51    10
     b. 11 KV Line                                                        60     230   1    2       0      58    58    12
     c.   33 KV Line                                                      110    230   2   1.50    17      86    103   21
26        Replacement of Distribution box                                 314    230   2    2      159     115   274   55
          Replacement of cable (3.5 core) Replacement will be with lugs
          materials will be provided by the Company
     a. 300 sq. mm.                                                       444    230   4    2      164     230   394   79
     b. 150 sq. mm.                                                       382    230   4    2      112     230   342   68
     c.   70 sq. mm.                                                      293    230   3    2      90      173   263   53
27        Replacement of DO fuse unit (each)
     a. 33 KV                                                             116    223   2   1.50    19      84    103   21
     b. 11 KV                                                             76     223   2    1      12      56    68    14
28        Replacement of phase main switch                                154    223   2    2     25.50    112   137   27
29        Replacement of porcelain kit-kat                                46     223   1   1.50     0      42    42    8
30        Replacement of lightning arrestor as per schedule
     a. 33 KV                                                             95     223   1    2      28      56    84    17
     b. 11 KV                                                             39     223   1   1.27     0      35    35    7
31       Replacement of Silica Jel                                               21      223   1    0.68     0      19     19      4
32       Renovations of Jumpers of DT S/s. alongwith lugging (material will     228      223   2     2      87      112    199    40
         be supply by the Company)
33       Commissioning of meter at DT (installation of meter box, meter,        695      223   5     2      309     279    588    118
         cabling, commissioning complete by skilled labour)
                Additional Job work already incorporated in 2014-15
1        Shifting of location of meter from inside to outside consumer
         premises labour charges
     a   Single phase connection                                                 167     223    2    2       31     112    143     29
     b   Three phase connection                                                  268     223    3    2       61     167    228     46
2        Replacement of old meter box by installation of new piller Box in      3359     223   10    8      639     2230   2869   574
         complex including fixing & laying of cables and shifting of
         connection only labour charges
3        Indexing of consumer premises, survey, meter card fixing, writing       24      223   1    0.74     0      21     21      4
         of S/C no., line diagram preparation, from DT to consumer
         premises each DT wise
4        DT meter installation including CT / meter box and meter               661      223   4     2      335     223    558    112
         installation (only labour charges)
5        Laying of HT ABC cable (labour charges) 33 kV                          5868     223   15   12       30     5018   5048   1010
6        Laying of HT ABC cable (labour charges) 11 kV                          4100     223   15    8      177     3345   3522    704
7        Fixing of LT junction box on the pole for providing LT connection       130     223    2    2        0     112    112      22
8        Providing Earthing of Distribution S/s including pit digging laying    661      223   4     2      335     223    558    112
         and connecting wire to support, X-mer etc. Back filling of pit by
         Black Cotton soil (only labour charges) per pitwise
     Additional Job work already incorporated in proposal 2014-15                        223
1        Cleaning of 33/11 KV S/s. Yard (approx. 75% area of S/s.)             2596.80   223   12    6      373     2007   2380   476
         including removal of grasses, tree plants removal dusting etc.
2        Renovation of yard levelling and metalling with cleaning, scraning    1564.80   223   8     6      110     1338   1448   290
         labour charges
3        ABC cable end joint replacement and fixing
      a Per phase                                                               686      223   4     2     355.50   223    579    116
      b Straight joint                                                          932      223   6     4      129     669    798    160
     c. LT end joint per phase                                                   71      223   1     2       5      56     61     12
      d LT straight joint per phase                                             104      223   1     2     32.50    56     88     18
4       UG XLPE Cable end joint replacement and fixing
    a HT end joint per phase                                                    1172     223   7   5      32      976    1008   202
    b   Straight joint per phase                                                1463     223   7   6      85      1171   1256   251
5       X-mer maintenance work
    i   Replacement of stud ( HT/LT) labour charges only material
        provided by CSPDCL
    a 63 KVA 11/0.4 KV X-mer                                                    180      223   2   2      42      112    154    31
    b 100 KVA 11/0.4 KV X-mer                                                  207.60    223   3   2      11      167    178    36
    c 200 KVA 11/0.4 KV X-mer                                                  232.80    223   3   2      32      167    199    40
    d 315 KVA 11/0.4 KV X-mer                                                   258      223   3   2      53      167    220    44
    e 500 KVA 11/0.4 KV X-mer                                                  283.20    223   3   2      74      167    241    48
    ii Job work for renovation of complete Maintenance of D X-mer with
       replacement of Oil seal, burnt stud HT & LT, filtration of X-mer Oil,
       opening and tightening of core and winding and painting including
       minor repairing such as replacement of burnt stud change of
       LT/HT bushing etc.
    a 63 KVA 11/0.4 KV X-mer                                                   3064.80   223   6   8     1258     1338   2596   519
    b 100 KVA 11/0.4 KV X-mer                                                  3586.20   223   8   8    1260.50   1784   3045   609
    c. 200 KVA 11/0.4 KV X-mer                                                 4597.20   223   8   9     1887     2007   3894   779
    d 315 KVA 11/0.4 KV X-mer                                                  5608.20   223   8   10   2513.50   2230   4744   949
    e 500 KVA 11/0.4 KV X-mer                                                   6630     223   8   12    2933     2676   5609   1122
  6        Distribution box door repairing / providing new door and its
           replacement against damaged / missing (labour charges with
           material)
       A. Upto 100 KVA Distribution box                                        1200            240
       B. Above 100 to 200 KVA Distribution box                                1300            240
       C. 300 to 500 KVA Distribution box                                      1400            240
  7        Providing BPL Connection with Material including labour charges     325             240
           (Meter board 10"x12" 01 no. GI Wire 16 swg, Earthing terminal 01
           no. 1/2"-04 no. nuts and bolts with washer for fixing of board,
           Piano switch 5 Amp., 01 no. bulb Holder, 16 Amp. cut-out, 02 no.
           Screw for fixing in meter and cut-out etc., 1.5 mm. up to maximum
           30 meter.)
           (Remark :- The cost service wire to deducted @ Rs. 5.00 per
           meter on the basis of actual length of wire reduced by 30 meter
           length).
      Additional essential work already incorporated in SOR 2014-15
  1        Replacement of XLPE cable U/G and removing of faulty cable per      9000
           span i.e. 100 mtr. Span (per span)
  2        Replacement of AB cable and removing of faulty cable per span       500
           i.e. 100 mtr. Span (per span)
  3        Replacement of XLPE U/G cable end terminal kit (per phase)          2000
  4        Replacement of straight joint for XLPE U/G cable (per phase)        3000
  5     a Replacement of AB cable end joint per phase including material of    1000
          good quality
        b Replacement of AB cable end joint per phase (only labour charges)    500
  6     a Replacement of AB cable straight joint including material of good    1500
          quality (per phase).
        b Replacement of AB cable straight joint (only labour charges)         500
Note The labour engaged should be Minimum qualification at least 12 th passed having knowledge / working of computer preferable ITI Passed
Remark:- Revision of above proposal is on the basis of following points
  1        The above schedule of rate revised as compare to directive issue by Labour Commissioner under Minimum Wage Act-1948 for unskilled labour Rs. 223.00 per day, semi
           skilled labour Rs. 230.00 per day and skilled labour Rs. 240.00 per day (for the period for 01.04.2015 to 30.09.2015) as per circular of Assistant Labour Commissioner
           Raipur District Raipur (copy enclosed). The collector rate increased w.e.f. 01.04.2015 about 6.19% as compared to previous rate.
  2        Labour contractor have to bear the responsibility of the All labour Rules applicable to him i.e. EPF deduction / payment of income tax / service tax, workmen
           compensation etc.
  3        Contractor have to deposit the addle. Money as provision in Hkou ,oaa vU; lafUuekZ.k deZdkj ¼fu;ksstu ,oa lsok 'krkssZa dks fofu;e½ vf/kfu;e
           1996 dh /kkjk 18¼1½ ,oa 18¼3½ lg ifBr fu;e 251 ds vuqlkj vlaxfBr {ks= ds deZdkjksa dss fgr ds fy, fu;kstdks ls fuekZ.k ykxr
           dk ,d izfr'kr dh nj ls midj eaMy dks ns; gksxk tks deZdkjksa ds fgr ds fy, fofHkUu dY;k.kdkjh ;kstukvksa esa jkf'k dk mi;ksx fd;k
           tkuk gSA
  Total
proposed
for 2015-
 16 (Rs.)
  243
  364
  452
  381
  218
  242
  700
  634
   80
  349
  196
  201
  170
  195
   85
  44
  73
  41
 5.00 per NEW ADDED
location/p
    ole
  230
  292
  354
  367
  391
  515
  65
  37
  22
  22
116
90
55     *
27
 0
126
120
84
60
220
35
21     *
1041
 772
 638
 505
2891
2248
1829
1643
257
145
84
280
200
281
208
258
694
824
469
638
1183
699
291
107    *
202
22
61
69     *
124
329
473
410
315
123
81
164
50
101
42     *
23
238
705
 171
 274
3443
25
670
6057
4226
 134
670
2856
1738
694
958
73
106
1209
1507
184
214
239
264
290
3115
3653
4673
5692
6731
       1274
       1380
       1487
       345
       9557
       531
       2124
       3186
       1062
       531
       1593
       531