Calculation Sheet Information
1    Calc Sheet Prepared By              Zubair Ahmed Tariq
2    Calc Sheet Checked By               Imran Hassan
3    Calc Sheet Rev 0 dated 15-03-2010   Calculation Sheet implemented in the system
4    Information of Base Data used       Steam Tab version Duo 1997
5    Information of Base Data used       Partial Volume Coefficient Values Table From Pressure Vessel Hand Book By
6    Information of Base Data used       Pipe Dimensional Table
10
11
12
13
ormation
ressure Vessel Hand Book By EUGENE F.MEGYESY 10th edition
                                                                INSTRUCTIONS
1    calculation sheet is valid for
2    Sheet will be use only for
4    All inputs required are indicated in RED Fonts.
5    All the Blue font inputs are constant valve and should not be changed during normal calculations.
6    Some inputs are required by selection through drop down windows.
7    Calulations will be automatically performed after insertion of all inputs.
8    The results of calcualtions are highlighted by Red Orange, and Green Markers for easy use of the Calcualtion Sheet
     The green highlighted output means that results are OK while for Red highlighted output suggest to change the input
9
     where orange highlighed cells will be seen which shows a neutralizing point.
10   The user should use the recommneded values of important parameters as commented against their respective cell.
11   All Table values are extrated in the data sheet and are made as accurate as possible.
12   To use the sheet for internal use, Use Cover Internal, and to use the sheet for external use (outside Company), use C
13   After performing calcualtions, take print and get it signed by all concerned and keep the record in the form of both sof
14   For getting best results use this excel sheet in Microsoft Excel-2007 version.
NS
alculations.
y use of the Calcualtion Sheet
ut suggest to change the input to make the result OK. Also some
d against their respective cell.
 use (outside Company), use Cover External
e record in the form of both soft and hard copy.
 00      2-Aug-10                                                     xxx                                      XX                                     XX
                                                                     Initial          Signature              Initial          Signature              Initial            Signature
Rev         Date                     Description
                                                                               Prepared By                             Checked By                                  Approved By
                       Kot Addu Power Company Limited.
                       Kot Addu District Muzaffargarh                                                                                            CLIENT REFERENCE NO.
                       Punjab, Pakistan
                       Phone + 92-66-2301047-49 , Fax: +92-66-230102
                          NSR ENERGIES PVT LIMITED.
                          26-A Block, Canal View Housing Society, West Canal Bank Road, Lahore,                                                       NSR PROJECT NO.
                          Pakistan
                          Phone + 92-42-35964763 , Fax: +92-42-35964764
                                                                                                                                                                   XXXX
      PROJECT                                                       XXXX-XXX-XXX-140
DOCUMENT TITLE                                                              Calculations
                                                                                                                                                          REV.                SHEET
DOCUMENT NO.                                                        XXXX-XXX-XXX-140
                                                                                                                                                               0               1 of 4
       This document is the intellectual property of Descon Engineering Limited. Any unauthorized use, including modification and reproduction of the content is strictly prohibted
C:\Documents and Settings\airshad\Desktop\[Template calcs sheet.xls]Cover Internal
  00       2-Aug-10                                                            XXX                                                       XXXX
                                                                              Initial                   Signature                        Initial                  Signature
 Rev          Date                         Description
                                                                                                Prepared By                                               Checked By
                           NSR ENERGIES PVT LIMITED.
                           26-A Block, Canal View Housing Society, West Canal Bank                                                                   NSR PROJECT NO.
                           Road, Lahore, Pakistan
                           Phone + 92-42-35964763 , Fax: +92-42-35964764
                                                                                                                                                               XXXX
       PROJECT                                                          XXXX-XXX-XXX-
DOCUMENT TITLE                                                              Calculations
                                                                                                                                                           REV.                SHEET
  DOCUMENT NO.                                                       XXXX-XXX-XXX-140
                                                                                                                                                            00                  1 of 4
        This document is the intellectual property of Descon Engineering Limited. Any unauthorized use, including modification and reproduction of the content is strictly prohibted
                                                   Calculations
       Note
Line
       Rev
                                                         System Pressurer Drop Calculations Sheet
 1
 2            Circuit Pressure Drop Calculations
 3                                                                                   Circuit Pressure drop
 4            Steam pressure required at battery limit            =     P0    =         10        Barg
 5            Steam flow                                           =    P1     =      10.3        Barg
 6
 7
 8
 9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
           Doc No XXXX-XXX-XXX-140
           Rev No. 00
           Sheet No.2 of 4
Sheet
Pressure drop
     Barg       =     10    Barg
     Barg       =     0.3   Barg
                                                                                       Doc No XXXX-XXX-XXX-140
                                               Calculations                            Rev No. 00
                                                                                       Sheet No.3 of 4
             Note
Line
       Rev
                                                              Calculations Sheet
 1
 2                  Calculations
 3                  water temperature                         =   TBFW   =         -        =     95.0   °C
 4                  Desnity of feed water                     =   ρBFW   =         -        =   #NAME?   Kg/m3
 5
 6
 7
 8
 9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
                                                                                       Doc No XXXX-XXX-XXX-140
                                               Calculations                            Rev No. 00
                                                                                       Sheet No.4 of 4
             Note
Line
       Rev
                                                              Calculations Sheet
 73
 74
 75
 76
 77
 78
 79
 80
 81
 82
 83
 84
 85
 86
 87
 88
 89
 90
 91
 92
 93
 94
 95
 96
 97
 98
 99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122                 Sketch
123
124
125
126
127                                            LLWL
128
129
130
131
132
133                    hliquid
134
135
136
137
138                               Base Frame
139
140
141
142