        Work Experience
 Total Work experience 5.3 Years
         From 1st Jan, 2012 till date , working as a Senior Engineer in Network Engineering in Ericsson Global
          Services Pvt. Ltd.
         From 28th May, 2010 to 31 December, 2011 worked as an Engineer in N&TC (Network and Technology
          Consultant) Ericsson India Private Limited.
        Competence
         Radio network optimization of WCDMA / LTE network.
         Primary competence : 3G WCDMA Network Optimization of following KPIs:
          DCR - CS 12.2, HSDPA, R99, MultiRAB (Retainability)
          RRC and RAB - CS 12.2, HSDPA , R99 ,MultiRAB (Accessibilty)
          IRAT and SHO - CS 12.2 , R99 ,MultiRAB (Mobility)
          CQI , Packet Throughput ,Channel Switching , BLER Performance (Service Integrity)
          Parameter audit and further tuning using Tools like Gladiator .
         Co-ordinated on field Drive Test experience of WCDMA Airtel and completed AT of 11 clusters and
          around 900 NodeBs of Delhi-NCR.
         LTE Optimizing Analysis of IRAT HO failures, Intra /Inter frequency and post processing of the drive test
          data and parameter recommendations, site verification report. Drive test analysis in detail through Gladiator
          G-Station, call events failure root cause analysis.
         Hands on experience in PRE SALES to acquire the business opportunities for the department for various
          tools of EDOS Package (OPTIMI).
         Customer Interaction: Handled Customer meetings for the network health related issues concerned with
          KPI Performance and also for the special VIP hotspot events and hence concluded the AT & Sign-Offs for
          Cluster as well as Nodes.
         Experience on Continuous Wave Testing and LTE survey for the Reliance.
      Knowledge sharing among team members with the various case studies and provided In-house trainings on
          the tools and technologies
        Experience Summary
 Start       End     Duration
                                       Projects and Responsibilities               Customer/Vendor
 Date        Date    (Months)
                                Presently working On Site in Gabon with
                                respect to new site Roll out and is entirely
1stJul     Till      1.5        responsible for node tuning , optimization        AIRTEL-GABON
2015       Date      Months     and hence customer acceptance.                    (Africa)
                                Have been on On-site in Nigeria for 6 months
                                for KPI optimization and sites Sign-Off .
                                Regulary been on customer interface and
16thJul    30thJun   11.5       made the 265 WCDMA nodes sign off                 AIRTEL-NIGERIA
2014       2015      Months     possible.                                         (Africa)
                                Responsible for performance optimization &
                                initial tunings of call events with the aids of
                                LAYER 2/3 messages, RSRP, SINR, and
                                Power Control.
                                Also performed Cluster / SSD level KPI
                                analysis.
16thApr    10thJul              Acted as GSC SPOC for the quality control
2014       2015      3 Months   and project delivery.                             AT&T LTE ,U.S.A.
                                Served MS Project as Team Lead for Bharti
                                and involved in daily optimization activities
                                along with counters and parameter level
                                analysis against the contractual KPIs agreed
                                with the customer: RRC, RAB, DCR, CQI,
                                HSDPA Throughput and IRAT. Also
1stAug     15thApr   8.5        governed the benchmarking activities and          BHARTI AIRTEL 3G
2013       2014      Months     worked on the hotspot and pain areas              UPW-RAJASTHAN
                                Looked after WCDMA domain in Due
                                Diligence Phase for the transition from
                                Huawei to ERICSSON which involves base
                                lining and preparing methodology for
                                calculating KPI, also includes formula
                                validation logically and from the customer
                                server as well. In addition, being in the
                                Central team was given responsibility for
                                Punjab circle Optimization which involved
                                KPI Analysis& Enhancement and
                                Improvement plan governed by
                                recommending parameters, features and
16thJan    31stJul   6.5        tuning strategies. Hands on with the M2000        RCOM-HUAWEI-
2013       2013      Months     server.                                           SYSTEM
                                  End to end optimization activities involving
                                  new feature implementation, parameter
                                  testing, and hands on making macro for the
1stDec     15thJan                automated KPI Dashboard for all Bharti           BHARTI AIRTEL 3G
2012       2013       1.5 Month   circles of India.                                DELHI
                                  Solution documentation on EDOS utilities to
1stNov     30thNov                acquire the business opportunities for the
2012       2012       1 Month     department.                                      PRE SALES
                                  Undergo the OJT for the optimization tool
                                  training of the X- Parameter during which
                                  live testing is done on the different networks
15thSept   31stOct                consisting single carrier as well as multi       BHARTI AIRTEL 3G
2012       2012       1.5 Month   carrier.                                         DELHI
                                  Concluded Spectrum Refarming Planning
                                  and 2G-3G Swap Deployments from the view
1stJuly    31thAug                point of capacity management and
2012       2012       2 Months    introduction of higher technologies.             MULTI VENDOR
                                  Part of Managed service team involved in
                                  projects JOC and Benchmarking ,was
                                  performing the activities concerned with New
                                  site planning , feature implementation
                                  ,Proposed capacity and coverage sites ,
                                  parametric tuning ,Benchmarking action
1stMar     30thJune               plan, KPI monitoring ,Drive test optimization    BHARTI AIRTEL 3G
2012       2012       4 Months    .                                                DELHI
                                  Involved in LTE survey and Continuous
 st          th
1 Oct      26 Feb                 wave testing for the 15 sites and ensuring
2011       2012       5Months     their drive extent to be proper.                 RELIANCE
                                  WCDMA support with Optimization and
29thMar    31stSep                Tuning activities for AIRTEL with KPI            BHARTI AIRTEL 3G
2011       2011       7Months     Monitoring & Handling.                           DELHI
                                  Successful 3G Network Roll out of Bharti 3G
25thAug    28thMar                Delhi for above 2000 NodeB’s and cluster         BHARTI AIRTEL 3G
2011       2011       7 Months    optimization                                     DELHI
1stAug     24th Aug               Remote support includes basic optimization       ZAIN-NIGERIA
2010       2010     24 days       using Winfiol.                                   2G/3G
28thMay    30thJuly                                                                ERICSSON
2010       2010       2 Months    Classroom Based Trainings                        ACADEMY
    Tools Proficiency
        RF Tool – Analyzer, Parser
        TIPP , FFAX
        ATOLL
        UETR, GPEH,WMRR,WNCS
        Alarm List Viewer
        Map Info 8.5, Map Info 10
        MCOM
        Nepa , TEI
        Tems Investigation 10
        Network Explorer
        Business Object , ESPA
        Gladiator
        OSS - Winfiol
        Optimi-X-Parameter
    Professional Qualifications
      Completed B-TECH in ICT (Information and Communication Technology) at Dhirubhai
     Ambani Institute of Information and communication Technology (DA-IICT) with 64%.
      C.B.S.E. Senior Secondary School Certificate from Central Academy, Kota with 75%.
      Secondary School Certificate of C.B.S.E. from St. Paul’s School, Beawar with 74%.
    Professional Training Experience
     Ericsson certified trainings :
        LTE AIR INTERFACE
        LTE PERFORMANCE MANAGEMENT AND OPTIMIZATION
        WCDMA W10 AIR INTERFACE
        WCDMA W10 RAN FUNCTIONALITY
        WCDMA W10 RAN INITIAL TUNING
        WCDMA SYSTEM OVERVIEW
        WCDMA PERFORMANCE MANAGEMENT AND OPTIMIZATION
        WCDMA-GSM HANDOVER
        OPTIMI X -PARAMETER
        IP BASICS
        AXE INTRODUCTION
        MPBN OVERVIEW
        GPRS SYSTEM SURVEY
        GSM BSS 07 CELL PLANNING PRINCIPLES
        GSM MSS R5 INTRODUCTION
   Achievements
     Awarded with ROCKSTAR Award for Q2, 2014 owing to leading the Airtel Nigeria ON site
    Project.
     Awarded with ACE Award for Q2, 2013 owing to the performance in RCOM and Airtel
    Project.
     Received accolades from the SDM for successful Roll out of Bharti 3G Delhi.
     Received appreciation for successfully concluding the RIL Continuous Wave Testing.
     Completed L1 and L2 certification with highest score for the Optimi tool – X parameter.
     Completed both ETCP & RAN certifications with more than 95% score.
     Was among the top 1.1% students from all over India in the AIEEE-2006.
   Extra Curricular Activities
     Awarded as Techno student of the year for governing technical events successfully in college.
     Won Carrom Championships for three years in a row in college and also was a part of college
    cricket team.
     Lead the college dance team in 1st and 2ndyear for the Inter college dance competions.
     Student Member of Institute of Electrical & Electronics Engg. (IEEE)
     Head of technical committee and organized events like
      EXCOGITATE - an event about designing a technical structure using very simple on technical
      objects:
      MASQUARADE – Event based on robotics programming.
   Personal Details
     Date of Birth           11th December
     Nationality             Indian
     Marital Status          Unmarried
     Languages Known         English, Hindi
     Hobbies                 Public Speaking, Reading, Terpsichore, Cricket
     Passport Number         J2580046
     References              On Demand
     I hereby declare that the information furnished above is true to the best of my knowledge and
     belief.
     Date: 23-08-2015.