PROCUREMENT STRATEGY
Purchase Requisition No.                   7268
 Date:      01 December 2016                                                      Contact Person: Malahayati Zamzam
Requisition Type
   Service                                Materials
Section 1: General Information
Tender Authority                                        Procurement     Estimated Contract Value (QR)     1,925,698
Tender Reference (to be provided by TC
                                                        2016-4164
Secretary)
Tender Title                                            IVF Microscope & Accessories
Brief Scope of Services/ Scope of Requirements
The purpose of this tender is to procure IVF Microscope and accessories for IVF facilities in OPC.
Proposed Commencement Date of Supply /
                                                       Feb 2017                Contract Duration               One time
Services
Section 2: Procurement Strategy and Objectives
Proposed Tendering
Strategy
                                ____________________
                                Major medical equipment company suppliers are invited in the tender to submit either Olympus
Objective of the Strategy
                                or equivalent Microscope
                                     1.    Khalid Scientific
                                     2.    Zahrawi medical
Bidder(s) List (Selective &          3.    Scitech Arabia
Single Source)                       4.    Al Suwaidi
                                     5.    Sedeer
                                The above mentioned suppliers are major medical equipment suppliers in Qatar and able to provide the
Justification of Proposed       required equipment from the different manufacturers.
Strategy
Section 3: Tender Evaluation
   Technical (UNPRICED first the Commercial (PRICED) bids
   Technical (UNPRICED) and Commercial (PRICED) at the same time
Justification
:                  After Technical and Commercial opening, TER will be prepared by technical team then commercial evaluation will be
                   conducted by the commercial evaluation committee
Technical Evaluation (Unpriced) Team                                     Commercial Evaluation (Priced) Team
 Joyce Cummings                 Director – Operations & Infrastructure               Chair
                                                                         Ali Ali             Chair
                                Manager, Special Projects                          Member
                                                                         Malahayati Zamzam   Member
                                                                                  Member
                                                                             Non-voting member
                                                                                                      Commercial (Priced)
Technical (Unpriced) Criteria
                                                                                                      Criteria
                                                               Page 2 of 4
 Device must represent the most current technology and meet standards of care.
 Device must be CE, FDA or CSA approved
 Must be provided with the ECRI 5-digit device code and the 6-digit manufacturer code
 Power Supply: Must comply with Sidra's standard voltage supply;single phase 220-240V
 50 Hz utilizing a three pin British style electrical plug or double insulated AC power
 supply adaptor (and as applicable, a rechargeable battery source).
 For sensitive analysers and other equipment as designated a standalone UPS must be
 connected with the analyzer
 If a higher voltages are required; the only alternate is a 415V three phase power
 supply.
 Must be able to be delivered and installed using regular egress and exit points in the
 facility.
 Must be able to be transported to end user site using regular door access 1060mm
 wide and 2080 high. Lift access must not exceed 3000 kgs or be greater than 2560mm x
 1395mm x 2970mm (HxWxD). Please notify if offer exceeds any of these parameters
 Must be able to be decontaminated by washing, wiping, disinfecting using
 internationally acceptable decontamination processes.
 Must state model year of introduction, spare parts availability after end of sales (in   Total score on the
 years) and manufacturing end date                                                        commercial
                                                                                          evaluation is 30%
Total score on the technical evaluation is 70%
Elimination criteria:
Section 4: Timeline / Milestones
Draft Scope of Work and Compensation
Final/ Agreed Scope of Work and Compensation
                                                                                          1 week
Preparation of Tender Document
Final Agreed Tender Document
Tender Advertisement Issue (for Open Tender and prequalification)
                                                                                          1 week
Tender Issue
                                                               Page 3 of 4
Pre-bid meeting (if applicable)
Tender Closing date
Technical Bid Opening
Completion of Technical Evaluation
                                                                                         3 weeks
Technical Evaluation Approval
Commercial Bid Opening
Commercial Evaluation Approval                                                           1 week
Award Recommendation Approval
Contract Award
Signing of Contract                                                                      2 weeks
Commencement date of Contract
Section 5: Endorsement/ Approval
Prepared by:
Sponsoring Department Representative   Erika Gonzales                 Signature / Date
Reviewed by:
Sponsoring Department
                                       Joyce Cummings                 Signature / Date
Manager
Endorsed by:
Procurement Representative             Malahayati Zamzam              Signature / Date
Approved by:
Procurement & Contract Director        Ali Ali                        Signature / Date
                                                        Page 4 of 4