RESOURCE SCHEDULING OF
RESIDENTIAL PROJECT USING
       PRIMAVERA
           AIM OF PROJECT
 The main aim of this project is to study the plan
  of a residential building project (G+4) and
  scheduling of construction activities and
  budgeting by Using suitable method of Project
  management techniques (CPM,PERT) with help
  of primavera software.
           Schedule of project
 Study the basics of primavera
 Selection of project and preparation of typical plan for (G+4)
  Residential building.
 Estimation of quantities
 Preparation of activity layout and calculating duration of each
  activity.
 Scheduling the activities
 Preparation of WBS layout.
 Budgeting the project.
 Preparation of reports &document
      Concept of primavera
    &Oracle corporation review
 1. Primavera is a tool for planner, project managers and
  any person needs to plan - control a project.
 2.It is a product of primavera system in since 1982-
  oracle corporation -2008(p6)
 Oracle's Primavera P6 Enterprise Project Management
  is the most powerful and easy-to-use solution for
  globally prioritizing, planning, managing, and executing
  projects, programs.
Specified & method of working
 p6 is specified in managing all types of projects
            small, medium & large
 Methods of Working:-
       Pm is using critical path method (CPM) in
calculating project duration and floats of the activities
 It has types of charts (view/display)
     Gantt Bar chart
        Key words& their definitions
                 &uses
 Construction management
 Scheduling
 Tracking
 Resources
 Man-day
 Budget
 Project: Any undertaken work is called project, it requires
  resources and fund to complete. We can get some out put by
  doing project.
 Ex: catering, wedding planning, construction of building,
  software development.
Project Planning Components&
           Parameters
 The components that may be measured and controlled using
  planning and scheduling software
  Time
  Resource
  Cost
Planning the project by means
 Thinking & documenting what needs to be done to complete the
  project
 Defining Responsibilities(AR,OW,CONTRACTER)
 Defining the phases (DP, EP, FP)
 Calculating Activity duration
 Adding the logic links between activities
 Assigning resources and cost to activities
 Define calendars
 Create a work break down structure
 Preparing work schedules
 Developing an acceptable budget
 Provide a base line which progresses is measured
Monitoring and controlling means:-
 Ensuring the project is being executed according to
  the plan measuring performance
 Compare the projects progress with the original plan
 Suggesting correction action when needed
 Inform the team about progress
 Identifying the improvement of performance of team
 Forecast Problems
        Project life cycle (Plc.)
 The time span between the start and competition of
  project. Represents the project
 life cycle which varies from few months to few years
The life cycle of project can be broadly divided into the
following:-
 a) Formation stage / inception stage
            . Feasibility studies
            .Invest appraisal(budget)
            .project definition
 b) Mobilization / preparation Stage
            .Project Preliminary plan
            .Design & drawing
            .Specification and tendering(contract finalization)
            .resource Mobilization
 C) Construction stage / Execution stage
         . Planning & controlling execution
         .Inducting Resources
         .Construction
         .Final handing over to the client
Project updating cycle
cre
THE PROGRAM CAN BE SEE IN
 PRIMAVERA SOFTWARE IN
       PRACTICALY