0% found this document useful (0 votes)
76 views2 pages

Request Yong2

A company called Early Seven Aggregates and Construction Supply has been awarded an ISAG permit to extract sand and gravel from an area located along the Guintubungan River. They are requesting that CENRO-Ormoc provide a surveyor to survey the permit area and determine its accurate boundaries. The company also wants to place posts every kilometer within its designated extraction area.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views2 pages

Request Yong2

A company called Early Seven Aggregates and Construction Supply has been awarded an ISAG permit to extract sand and gravel from an area located along the Guintubungan River. They are requesting that CENRO-Ormoc provide a surveyor to survey the permit area and determine its accurate boundaries. The company also wants to place posts every kilometer within its designated extraction area.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

March 20, 2019

MARIO L. TUBIANA PH.D.RS


CENRO Officer
CENRO-Ormoc

Dear Sir:

Good day!

We would like to request from your good office for a surveyor


to conduct the survey of the ISAG permit area located at the
Guintubungan River awarded to Early Seven Aggregates and
Construction Supply with ECC Ref. Code: ECC – R08-1505- 0079.
This is to determine the appropriate metes and bounds authorize
for Early Seven Aggregates and Construction Supply to extract
sand and gravel under its ISAG permit. In addition thereto, our
client would also want to place a post in every kilometer of his
designated area.

We earnestly hope for your usual prompt action on this


matter. Thank you very much.

You might also like