Doc. No NDER.
018
Non Destructive Examination Request (NDER) Rev. No 0
Date 31 January 2010
Prepared by Approved by Reviewed by Notes :-
1) Base Metal Grade :API 5L X65 PSL 2
Signature
( Official NDE after 48 hours on 30/01/2010 )
Name Welding Inspector Welding Engineer 2) Base Metal Grade :A516 Gr.70
Date 31/1/2010 31/1/2010 ( Official NDE after 48 hours on 31/01/2010 )
Welding WPP/WPS Dimension [mm] NDE Method
Weld ID Process Type Position Backing Name Welder ID Acceptance Citeria
Date No L WT OD RT UT PT MT
TC.A0016-1 28/1/10 WPP.A0016 SAW Mechanized 1G YES 1000 20.6 - Wan / Haris EW-27/EW-05 X X X ASME IX,API 5L,
EEMUA 158
TC.A0016-2 28/1/10 WPP.A0016 SAW Mechanized 1G YES 1000 20.6 - Yazid / Haris EW-28/EW-05 X X X ASME IX,API 5L,
EEMUA 158
TC.M0010-1 29/1/10 WPP.M0010 SMAW Manual 2G YES 1000 37.08 - Mat Zaki EW-22 X X X AWS D1.1,ASME IX,
EN 15614-1, EEMUA 158
TC.M0011-1 29/1/10 WPP.M0011 SMAW Manual 2G YES 1000 37.08 - Zolkipli EW-09 X X X AWS D1.1,ASME IX,
EN 15614-1, EEMUA 158
Date of print: 04/22/2019 EEW MALAYSIA SDN. BHD. Page 1 of 2
Doc. No NDER.018
Non Destructive Examination Request (NDER) Rev. No 0
Date 31 January 2010
Prepared by Approved by Reviewed by Notes :-
1) Base Metal Grade :API 5L X65 PSL 2
Signature
( Official NDE after 48 hours on 30/01/2010 )
Name Welding Inspector Welding Engineer 2) Base Metal Grade :A516 Gr.70
Date 31/1/2010 31/1/2010 ( Official NDE after 48 hours on 31/01/2010 )
Welding WPP/WPS Dimension [mm] NDE Method
Weld ID Process Type Position Backing Name Welder ID Acceptance Citeria
Date No L WT OD RT UT PT MT
Date of print: 04/22/2019 EEW MALAYSIA SDN. BHD. Page 2 of 2