0% found this document useful (0 votes)
69 views41 pages

Pump Design Computation

This document contains a spreadsheet for designing riprap shoreline protection. It includes sections to calculate average water depth, wave height, runup elevation, rock sizing, quantities of riprap and geotextile needed, and a sketch of site coordinates. However, many of the cells are blank or return error values, so full design computations cannot be completed based on the information provided.

Uploaded by

Frank Rojas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views41 pages

Pump Design Computation

This document contains a spreadsheet for designing riprap shoreline protection. It includes sections to calculate average water depth, wave height, runup elevation, rock sizing, quantities of riprap and geotextile needed, and a sketch of site coordinates. However, many of the cells are blank or return error values, so full design computations cannot be completed based on the information provided.

Uploaded by

Frank Rojas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 41

LAKESHORE RIPRAP DESIGN COMPUTATIONS SPREADSHEET ver 3.24.

17

CLIENT: COUNTY: DATE:


DSN BY: CHECKED BY: DATE:
COMMENTS:
*****************************************************************************************************************************
Average Depth (d) Across Longest Fetch Using Numerical Average
Station No. Station (ft) Depth (ft.) Average Depth (d) = ft
1 Longest Fetch (F) = ft
2 Hazard Class of Site: (1=Low, 2=Med, 3=High)
3 Revetment Slope Ratio (z) = (i.e. 2:1)
4 Ordinary High Water Elev. =
5 Normal Yearly Low Water Elev. = See sketch
6 Average Top of Bank Elev. = on "desc" tab.
7 Proposed Toe Lake Bottom Elev. =
8 Length of Shoreline= ft
9 Observed Boat Wave Height(Bs)= (if applicable) ft
10
Weighted Average = 0.0 feet
Numerical Average = #DIV/0!
Wave Height Design
Storm Wind Speed (Ua) = 35 mph = 51.45 ft/sec
Wave Period (T) = 0.559(UaF)1/3 (Ua-mph, F-miles) = 0.00 sec
Wave Length (L) = 5.12T2 = 0.00 ft
Non-dimensional fetch (χ) = gF/(Ua)^2 = 0.00
Non-dimensional water depth (δ) = gd/(Ua)^2 = #VALUE!
A1 = 0.493δ0.75 = #VALUE!
B1 = 0.00313χ0.57 = 0.0000
Non-dimensional epsilon (έ) = .00364(tanhA1tanh(B1/tanhA1))1.74 = #VALUE!
Wave energy (E) = έUa4/g2 = #VALUE! ft2
Wave Height (Hs) = 4E0.5 = #VALUE! ft #VALUE!
Safety Design Factor (DFwph) = (based on hazard class) = #VALUE!
Design Wave Height (Ho) = DFwphHs = #VALUE! Feet
Ho/L = = 0.00
Relative Runup Ratio = = 0.00
Runup (R) = Ho*(Relative Runup Ratio) = 0.0 Feet
Setup (S) = lesser of 0.5' or 0.1Hs = #VALUE! Feet
Elevation Design #VALUE!
Lower Limit For Protection = Low Water - 1.5Hs = #VALUE! Elev. Calc. ### Elev. Used
Upper Limit For Protection = OHWM+R+S (or OHWM + Bs) = #VALUE! Elev. Calc. ### Elev. Used
Upper Limit For Riprap = OHWM+Hs (or OHWM+Bs) = #VALUE! Elev. Calc. ### Elev. Used
#VALUE! = #VALUE! ft Calc. ### ft- Length Used
Rock Design
Rock Specific Gravity (Gs) = = 2.65 typical 2.65 Gs Used
Shape of Rock = Cubical
Safety Design Factor (DFriprap) = = 0.00 0.00 SDF Used
Rock Size Wave Height (Hrock) = Hs*DFriprap = #VALUE! ft
W50 Rock Size = (RockFactor)GsHrock3/(Gs-1)3z = #VALUE! lbs.
d50 Rock Size = 0.0 0.0 in. D50 Used
Rock Thickness = greater of 12" or 2D50 = 12.0 inches
Recommended Toe Type = #VALUE! #VALUE! Used
0.0 feet

Rock Gradation Style = Riprap Gradation (EFH 17 Method)


Quantities % Passing Size of Stone (Inches)
Riprap: 0 Cu. Yds. 100 0
Geotextile: 0 Sq. Yds. (does not include overlap) 60 - 85 0
Boulders: 0 Cu. Yds. 25 - 50 0
5 - 20 0
0-5 0
Sand or Gravel can be us
as a filter in place of
geotextile

The filter layer gradation


shall be designed per
Chapter 26 of Part 633 o
National Engineering
Handbook .
el can be used
place of

er gradation
gned per
f Part 633 of the
neering
DATA ENTRY UNITS : 1 (1 = US Feet, 2 = Meters)

COORDINATES
PAIR X Y
1 0.00 #VALUE!
2 #DIV/0! #VALUE!
3 #VALUE! 0.00
4 #VALUE! 0.00 Area = #VALUE! square feet
5 #VALUE! -1.00 #VALUE! acres
6 #VALUE! -1.00
7 0.00 #VALUE!
12.00
8
9 10.00
10
11 8.00
12
13
Y

6.00
14
15 4.00
16
17 2.00

18
19 0.00
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
20
21 X

22
23 Vertical Drop #VALUE!
24 Horizontal #VALUE!
25 Slope Length #VALUE!
26
27
28
29
30
spreadsheet by M.K. King AreaByCoordinateMethod4-2005.
=X1*Y2
#VALUE!
#DIV/0!
#VALUE! square meters #VALUE!
#VALUE! hectares #VALUE!
#VALUE!
#VALUE!
0
0
0
0
0
0
0
0
0
0
0
0
0.50 0.60 0.70 0.80 0.90 1.00
0
X 0
0
0
0
0
0
0
0
0
0
AreaByCoordinateMethod4-2005.xls Sum #VALUE!
Difference/2 = #VALUE!
DATA ENTRY UNITS : US feet

COORDINATES
PAIR X Y
=X2*Y1 1 0 #VALUE!
#VALUE! 2 #DIV/0! #VALUE!
#VALUE! 3 #VALUE! 0
#VALUE! 4 #VALUE! 0 Area = #VALUE!
#VALUE! 5 #VALUE! -1 #VALUE!
#VALUE! 6 #VALUE! -1
0 7 0 #VALUE!
#VALUE! 8 0 0
0 9 0 0
0 10 0 0
0 11 0 0
0 12 0 0
0 13 0 0
0 14 0 0
0 15 0 0
12.00
0 16 0 0
0 17 0 0
10.00
0 18 0 0
0 19 0 0
8.00
0 20 0 0
0 21 0 0
Y

6.00
0 22 0 0
0 23 0 0
4.00
0 24 0 0
0 25 0 0
2.00
0 26 0 0
0 27 0 0 0.00
0 28 0 0 0.00 0.10 0.20 0.30 0.40 0.50 0.60
0 29 0 0 X
0 30 0 0
#VALUE! spreadsheet by M.K. King
sq units
square feet #VALUE! square meters
acres #VALUE! hectares

0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
X

AreaByCoordinateMethod4-2005.xls
DATA ENTRY UNITS : 1 (1 = US Feet, 2 = Meters)

COORDINATES
PAIR X Y
1 0.00 #VALUE!
2 #DIV/0! #VALUE!
3 #VALUE! 0.00
4 #VALUE! 0.00 Area = #VALUE! square feet
5 #VALUE! -1.00 #VALUE! acres
6 #VALUE! -1.00
7 #DIV/0! -1.00
12.00
8 #DIV/0! #DIV/0!
9 #VALUE! #DIV/0! 10.00
10 #VALUE! #VALUE!
11 0.00 #VALUE! 8.00
12
13
Y

6.00
14
15 4.00
16
17 2.00

18
19 0.00
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
20
21 X

22
23
24
25
26
27
28
29
30
spreadsheet by M.K. King AreaByCoordinateMethod4-2005.
=X1*Y2
#VALUE!
#DIV/0!
#VALUE! square meters #VALUE!
#VALUE! hectares #VALUE!
#VALUE!
#VALUE!
#DIV/0!
#DIV/0!
#VALUE!
#VALUE!
0
0
0
0
0
0
0
0
0.50 0.60 0.70 0.80 0.90 1.00
0
0
0
0
0
0
0
0
0
0
0
AreaByCoordinateMethod4-2005.xls Sum #VALUE!
Difference/2 = #VALUE!
DATA ENTRY UNITS : US feet

COORDINATES
PAIR X Y
=X2*Y1 1 0 #VALUE!
#VALUE! 2 #DIV/0! #VALUE!
#VALUE! 3 #VALUE! 0
#VALUE! 4 #VALUE! 0 Area = #VALUE!
#VALUE! 5 #VALUE! -1 #VALUE!
#VALUE! 6 #VALUE! -1
#DIV/0! 7 #DIV/0! -1
#DIV/0! 8 #DIV/0! #DIV/0!
#DIV/0! 9 #VALUE! #DIV/0!
#DIV/0! 10 #VALUE! #VALUE!
#VALUE! 11 0 #VALUE!
#VALUE! 12 0 0
0 13 0 0
0 14 0 0
0 15 0 0
12.00
0 16 0 0
0 17 0 0
10.00
0 18 0 0
0 19 0 0
8.00
0 20 0 0
0 21 0 0
Y

6.00
0 22 0 0
0 23 0 0
4.00
0 24 0 0
0 25 0 0
2.00
0 26 0 0
0 27 0 0 0.00
0 28 0 0 0.00 0.10 0.20 0.30 0.40 0.50 0.60
0 29 0 0 X
0 30 0 0
#VALUE! spreadsheet by M.K. King
sq units
square feet #VALUE! square meters
acres #VALUE! hectares

0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
X

AreaByCoordinateMethod4-2005.xls
DATA ENTRY UNITS : 1 (1 = US Feet, 2 = Meters)

COORDINATES
PAIR X Y
1 0.00 #VALUE!
2 #DIV/0! #VALUE!
3 #VALUE! #VALUE!
4 #DIV/0! #DIV/0! Area = #VALUE! square feet
5 #DIV/0! #DIV/0! #VALUE! acres
6 #DIV/0! #DIV/0!
7 #DIV/0! #DIV/0!
12.00
8 #DIV/0! #DIV/0!
9 0.00 #VALUE! 10.00
10
11 8.00
12
Y

13 6.00
14
15 4.00
16
17 2.00

18
19 0.00
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
20
21 X

22
23 Vertical Drop #VALUE! #DIV/0!
24 Horizontal #VALUE! #DIV/0!
25 Slope Length #VALUE! #DIV/0! #VALUE!
26
27
28
29
30
spreadsheet by M.K. King AreaByCoordinateMethod4-2005.
=X1*Y2
#VALUE!
#DIV/0!
#VALUE! square meters #VALUE!
#VALUE! hectares #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0
0
0
0
0
0
0
0
0
0
0.50 0.60 0.70 0.80 0.90 1.00
0
X 0
0
0
0
0
0
0
0
0
0
AreaByCoordinateMethod4-2005.xls Sum #VALUE!
Difference/2 = #VALUE!

0  L.b
0  L.b/2
#DIV/0! phi radians
#DIV/0! drop
DATA ENTRY UNITS : US feet

COORDINATES
PAIR X Y
=X2*Y1 1 0 #VALUE!
#VALUE! 2 #DIV/0! #VALUE!
#VALUE! 3 #VALUE! #VALUE!
#VALUE! 4 #DIV/0! #DIV/0! Area = #VALUE!
#DIV/0! 5 #DIV/0! #DIV/0! #VALUE!
#DIV/0! 6 #DIV/0! #DIV/0!
#DIV/0! 7 #DIV/0! #DIV/0!
#DIV/0! 8 #DIV/0! #DIV/0!
#DIV/0! 9 0 #VALUE!
#VALUE! 10 0 0
0 11 0 0
0 12 0 0
0 13 0 0
0 14 0 0
0 15 0 0
12.00
0 16 0 0
0 17 0 0
10.00
0 18 0 0
0 19 0 0
8.00
0 20 0 0
0 21 0 0
Y

6.00
0 22 0 0
0 23 0 0
4.00
0 24 0 0
0 25 0 0
2.00
0 26 0 0
0 27 0 0 0.00
0 28 0 0 0.00 0.10 0.20 0.30 0.40 0.50 0.60
0 29 0 0 X
0 30 0 0
#VALUE! spreadsheet by M.K. King
sq units
square feet #VALUE! square meters
acres #VALUE! hectares

0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
X

AreaByCoordinateMethod4-2005.xls
DATA ENTRY UNITS : 1 (1 = US Feet, 2 = Meters)

COORDINATES
PAIR X Y
1 0.00 #VALUE!
2 #DIV/0! #VALUE!
3 #VALUE! #VALUE!
4 #DIV/0! #DIV/0! Area = #VALUE! square feet
5 #DIV/0! #DIV/0! #VALUE! acres
6 #DIV/0! #DIV/0!
7 #DIV/0! #DIV/0!
12.00
8 #DIV/0! #DIV/0!
9 #VALUE! #DIV/0! 10.00
10 #VALUE! #VALUE!
11 0.00 #VALUE! 8.00
12
Y

13 6.00
14
15 4.00
16
17 2.00

18
19 0.00
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
20
21 X

22
23
24
25
26
27
28
29
30
spreadsheet by M.K. King AreaByCoordinateMethod4-2005.
=X1*Y2
#VALUE!
#DIV/0!
#VALUE! square meters #VALUE!
#VALUE! hectares #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#VALUE!
#VALUE!
0
0
0
0
0
0
0
0
0.50 0.60 0.70 0.80 0.90 1.00
0
0
0
0
0
0
0
0
0
0
0
AreaByCoordinateMethod4-2005.xls Sum #VALUE!
Difference/2 = #VALUE!

0  L.b
0  L.b/2
#DIV/0! phi radians
#DIV/0! drop
DATA ENTRY UNITS : US feet

COORDINATES
PAIR X Y
=X2*Y1 1 0 #VALUE!
#VALUE! 2 #DIV/0! #VALUE!
#VALUE! 3 #VALUE! #VALUE!
#VALUE! 4 #DIV/0! #DIV/0! Area = #VALUE!
#DIV/0! 5 #DIV/0! #DIV/0! #VALUE!
#DIV/0! 6 #DIV/0! #DIV/0!
#DIV/0! 7 #DIV/0! #DIV/0!
#DIV/0! 8 #DIV/0! #DIV/0!
#DIV/0! 9 #VALUE! #DIV/0!
#DIV/0! 10 #VALUE! #VALUE!
#VALUE! 11 0 #VALUE!
#VALUE! 12 0 0
0 13 0 0
0 14 0 0
0 15 0 0
12.00
0 16 0 0
0 17 0 0
10.00
0 18 0 0
0 19 0 0
8.00
0 20 0 0
0 21 0 0
Y

6.00
0 22 0 0
0 23 0 0
4.00
0 24 0 0
0 25 0 0
2.00
0 26 0 0
0 27 0 0 0.00
0 28 0 0 0.00 0.10 0.20 0.30 0.40 0.50 0.60
0 29 0 0 X
0 30 0 0
#VALUE! spreadsheet by M.K. King
sq units
square feet #VALUE! square meters
acres #VALUE! hectares

0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
X

AreaByCoordinateMethod4-2005.xls
DATA ENTRY UNITS : 1 (1 = US Feet, 2 = Meters)

COORDINATES
PAIR X Y
1 0.00 #VALUE!
2 #VALUE! 0.00
3 #VALUE! 0.00
4 #VALUE! 1.00 Area = #VALUE! square feet
5 #DIV/0! 1.00 #VALUE! acres
6 #DIV/0! #VALUE!
7 0.00 #VALUE!
12.00
8
9 10.00
10
11 8.00
12
Y

13 6.00
14
15 4.00
16
17 2.00

18
19 0.00
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
20
21 X

22
23 Vertical Drop #VALUE!
24 Horizontal #VALUE!
25 Slope Length #VALUE!
26
27
28
29
30
spreadsheet by M.K. King AreaByCoordinateMethod4-2005.
=X1*Y2
0
#VALUE!
#VALUE! square meters #VALUE!
#VALUE! hectares #VALUE!
#DIV/0!
#DIV/0!
0
0
0
0
0
0
0
0
0
0
0
0
0.50 0.60 0.70 0.80 0.90 1.00
0
X 0
0
0
0
0
0
0
0
0
0
AreaByCoordinateMethod4-2005.xls Sum #VALUE!
Difference/2 = #VALUE!
DATA ENTRY UNITS : US feet

COORDINATES
PAIR X Y
=X2*Y1 1 0 #VALUE!
#VALUE! 2 #VALUE! 0
#VALUE! 3 #VALUE! 0
#VALUE! 4 #VALUE! 1 Area = #VALUE!
#DIV/0! 5 #DIV/0! 1 #VALUE!
#DIV/0! 6 #DIV/0! #VALUE!
#VALUE! 7 0 #VALUE!
#VALUE! 8 0 0
0 9 0 0
0 10 0 0
0 11 0 0
0 12 0 0
0 13 0 0
0 14 0 0
0 15 0 0
12.00
0 16 0 0
0 17 0 0
10.00
0 18 0 0
0 19 0 0
8.00
0 20 0 0
0 21 0 0
Y

6.00
0 22 0 0
0 23 0 0
4.00
0 24 0 0
0 25 0 0
2.00
0 26 0 0
0 27 0 0 0.00
0 28 0 0 0.00 0.10 0.20 0.30 0.40 0.50 0.60
0 29 0 0 X
0 30 0 0
#VALUE! spreadsheet by M.K. King
sq units
square feet #VALUE! square meters
acres #VALUE! hectares

0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
X

AreaByCoordinateMethod4-2005.xls
DATA ENTRY UNITS : 1 (1 = US Feet, 2 = Meters)

COORDINATES
PAIR X Y
1 0.00 #VALUE!
2 #VALUE! #VALUE!
3 #VALUE! #VALUE!
4 0.00 #VALUE! Area = #VALUE! square feet
5 0.00 #VALUE! #VALUE! acres
6 #VALUE! 0.00
7 #VALUE! 0.00
12.00
8 #VALUE! 1.00
9 #DIV/0! 1.00 10.00
10 #DIV/0! #VALUE!
11 0.00 #VALUE! 8.00
12
13
Y

6.00
14
15 4.00
16
17 2.00

18
19 0.00
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
20
21 X

22
23
24
25
26
27
28
29
30
spreadsheet by M.K. King AreaByCoordinateMethod4-2005.
=X1*Y2
#VALUE!
#VALUE!
#VALUE! square meters #VALUE!
#VALUE! hectares #VALUE!
0
#VALUE!
#VALUE!
#VALUE!
#DIV/0!
#DIV/0!
0
0
0
0
0
0
0
0
0.50 0.60 0.70 0.80 0.90 1.00
0
0
0
0
0
0
0
0
0
0
0
AreaByCoordinateMethod4-2005.xls Sum #VALUE!
Difference/2 = #VALUE!
DATA ENTRY UNITS : US feet

COORDINATES
PAIR X Y
=X2*Y1 1 0 #VALUE!
#VALUE! 2 #VALUE! #VALUE!
#VALUE! 3 #VALUE! #VALUE!
#VALUE! 4 0 #VALUE! Area = #VALUE!
#VALUE! 5 0 #VALUE! #VALUE!
#VALUE! 6 #VALUE! 0
#VALUE! 7 #VALUE! 0
#VALUE! 8 #VALUE! 1
#DIV/0! 9 #DIV/0! 1
#DIV/0! 10 #DIV/0! #VALUE!
#VALUE! 11 0 #VALUE!
#VALUE! 12 0 0
0 13 0 0
0 14 0 0
0 15 0 0
12.00
0 16 0 0
0 17 0 0
10.00
0 18 0 0
0 19 0 0
8.00
0 20 0 0
0 21 0 0
Y

6.00
0 22 0 0
0 23 0 0
4.00
0 24 0 0
0 25 0 0
2.00
0 26 0 0
0 27 0 0 0.00
0 28 0 0 0.00 0.10 0.20 0.30 0.40 0.50 0.60
0 29 0 0 X
0 30 0 0
#VALUE! spreadsheet by M.K. King
sq units
square feet #VALUE! square meters
acres #VALUE! hectares

0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
X

AreaByCoordinateMethod4-2005.xls
DATA ENTRY UNITS : 1 (1 = US Feet, 2 = Meters)

COORDINATES
PAIR X Y
1 0.00 #VALUE!
2 #VALUE! 0.00
3 #VALUE! 0.00
4 #DIV/0! #VALUE! Area = #VALUE! square feet
5 0.00 #VALUE! #VALUE! acres
6
7
12.00
8
9 10.00
10
11 8.00
12
Y

13 6.00
14
15 4.00
16
17 2.00

18
19 0.00
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
20
21 X

22
23 Vertical Drop #VALUE!
24 Horizontal #VALUE!
25 Slope Length #VALUE!
26
27
28
29
30
spreadsheet by M.K. King AreaByCoordinateMethod4-2005.

z= 0 
phi= 0 
pair 3 opp= 0 
pair 3 adj= 1 
Trock= 12 
=X1*Y2
0
#VALUE!
#VALUE! square meters #VALUE!
#VALUE! hectares #DIV/0!
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.50 0.60 0.70 0.80 0.90 1.00
0
X 0
0
0
0
0
0
0
0
0
0
AreaByCoordinateMethod4-2005.xls Sum #VALUE!
Difference/2 = #VALUE!
DATA ENTRY UNITS : US feet

COORDINATES
PAIR X Y
=X2*Y1 1 0 #VALUE!
#VALUE! 2 #VALUE! 0
#VALUE! 3 #VALUE! 0
#DIV/0! 4 #DIV/0! #VALUE! Area = #VALUE!
#VALUE! 5 0 #VALUE! #VALUE!
#VALUE! 6 0 0
0 7 0 0
0 8 0 0
0 9 0 0
0 10 0 0
0 11 0 0
0 12 0 0
0 13 0 0
0 14 0 0
0 15 0 0
12.00
0 16 0 0
0 17 0 0
10.00
0 18 0 0
0 19 0 0
8.00
0 20 0 0
0 21 0 0
Y

6.00
0 22 0 0
0 23 0 0
4.00
0 24 0 0
0 25 0 0
2.00
0 26 0 0
0 27 0 0 0.00
0 28 0 0 0.00 0.10 0.20 0.30 0.40 0.50 0.60
0 29 0 0 X
0 30 0 0
#VALUE! spreadsheet by M.K. King
sq units
square feet #VALUE! square meters
acres #VALUE! hectares

0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
X

AreaByCoordinateMethod4-2005.xls
DATA ENTRY UNITS : 1 (1 = US Feet, 2 = Meters)

COORDINATES
PAIR X Y
1 0.00 #VALUE!
2 #VALUE! #VALUE!
3 #VALUE! #VALUE!
4 #DIV/0! #VALUE! Area = #VALUE! square feet
5 #VALUE! 0.00 #VALUE! acres
6 #VALUE! 0.00
7 #DIV/0! #VALUE!
12.00
8 0.00 #VALUE!
9 10.00
10
11 8.00
12
13
Y

6.00
14
15 4.00
16
17 2.00

18
19 0.00
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
20
21 X

22
23
24
25
26
27
28
29
30
spreadsheet by M.K. King AreaByCoordinateMethod4-2005.

z= 0 
phi= 0 
pair 6 opp= 0 
pair 6 adj= 1 
Trock= 12 
theta= #DIV/0!
=X1*Y2
#VALUE!
#VALUE!
#VALUE! square meters #VALUE!
#VALUE! hectares #DIV/0!
#VALUE!
#VALUE!
#DIV/0!
0
0
0
0
0
0
0
0
0
0
0
0.50 0.60 0.70 0.80 0.90 1.00
0
X 0
0
0
0
0
0
0
0
0
0
AreaByCoordinateMethod4-2005.xls Sum #VALUE!
Difference/2 = #VALUE!
DATA ENTRY UNITS : US feet

COORDINATES
PAIR X Y
=X2*Y1 1 0 #VALUE!
#VALUE! 2 #VALUE! #VALUE!
#VALUE! 3 #VALUE! #VALUE!
#VALUE! 4 #DIV/0! #VALUE! Area = #VALUE!
#VALUE! 5 #VALUE! 0 #VALUE!
#VALUE! 6 #VALUE! 0
#DIV/0! 7 #DIV/0! #VALUE!
#VALUE! 8 0 #VALUE!
#VALUE! 9 0 0
0 10 0 0
0 11 0 0
0 12 0 0
0 13 0 0
0 14 0 0
0 15 0 0
12.00
0 16 0 0
0 17 0 0
10.00
0 18 0 0
0 19 0 0
8.00
0 20 0 0
0 21 0 0
Y

6.00
0 22 0 0
0 23 0 0
4.00
0 24 0 0
0 25 0 0
2.00
0 26 0 0
0 27 0 0 0.00
0 28 0 0 0.00 0.10 0.20 0.30 0.40 0.50 0.
0 29 0 0 X
0 30 0 0
#VALUE! spreadsheet by M.K. King
sq units
square feet #VALUE! square meters
acres #VALUE! hectares

.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
X

AreaByCoordinateMethod4-2005.xls
LAKESHORE RIPRAP DESIGN COMPUTATIONS SPREADSHEET - DRAFT ver 7.12 (Draft)

CLIENT: Example COUNTY: Dodge DATE: 04/23/19


DSN BY: SRS CHK BY: DATE:
COMMENTS: Beaver Dam Lake
*****************************************************************************************************************************
Average Depth Across Longest Fetch
Station No. (min. of 5) Depth (ft.)
1 26
2 26
3 26 Storm Wind Speed (S) = 35 mph
4 26 Wave Period (T) = 3.31 Seconds
5 26 Wave Length (L) = 56.11 Feet
Longest Fetch (F) = 31,500 Feet
Average Depth (d) = 26 Feet 5.97 Miles
d/L = 0.46
Wave type is Transitional Wave

Hazard Class of Site: 3


(1=Low, 2=Med, 3=High)
Wave Height Design
Wave Height (Hs) = 2.4 Feet
High Hazard Wave Height (Ho) = 4.0 Feet (Likely need individual DNR permit)
Input Slope Ratio of Revetment (i.e. 2:1): 2 (USE ONLY 1.5, 2, 3, 4, 5, 6, or 10)
Ho/L = 0.07
Runup (R) = 6.3 Feet Setup (S) = 0.4 Feet
Elevation Design
Ordinary High Water Elevation = 950.0
Normal Yearly Low Lake Elevation = 950.0
Average Top Elevation of Existing Bank = 960.0
Lake Bottom Elevation at Shoreline = 945.0
Lower Limit For Protection = 946.4 Calc 946.4 Used
Upper Limit For Protection = 952.4 Calc 952.4 Used
No Overtopping Pad Needed Calc Used
Rock Design

Shape of Rock: 1=Cubical 2=Sperical 2


d50 Rock Size = 17.4 Inches (Calc) 4 Inches (Used)
Rock Thickness = 12.0 Inches
Toe Type (A,B,C, or boulDer): c Lc = 12 feet
Length of Shoreline= 50 Feet Riprap Gradation
Quantities % Passing Size of Stone (Inches)
Riprap: #VALUE! Cu. Yds. 100 8 to 10
Geotextile: #VALUE! Sq. Yds. 85 6.4 to 8
Filter: #VALUE! Cu. Yds. 50 4 to 6
15 1.2 to 2

You might also like