Independent Consulting Engineer Scope of Works: Comply Remarks

The document outlines the scope of works for an independent consulting engineer. It lists 13 tasks including reviewing construction contracts and work programs, monitoring project progress, identifying risks, verifying approvals and drawdown requests are justified, preparing monthly reports, advising on project cost and claims, and confirming take up rates for leasable areas. The engineer will monitor the project delivery and performance, and advise the BPMB on achieving milestones, complying with requirements, and avoiding cost overruns.

Uploaded by

aezacs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views2 pages

Independent Consulting Engineer Scope of Works: Comply Remarks

The document outlines the scope of works for an independent consulting engineer. It lists 13 tasks including reviewing construction contracts and work programs, monitoring project progress, identifying risks, verifying approvals and drawdown requests are justified, preparing monthly reports, advising on project cost and claims, and confirming take up rates for leasable areas. The engineer will monitor the project delivery and performance, and advise the BPMB on achieving milestones, complying with requirements, and avoiding cost overruns.

Uploaded by

aezacs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

INDEPENDENT

 CONSULTING  ENGINEER
SCOPE  OF  WORKS
Comply Remarks
i Construction  Contract
review  &  comment
on  completeness,  adequacyor  shortcomings

ii Construction  Work  Progran  (CWP)


review  &  evaluate
activity  &  work  schedule  is  viable  &  realistic
can  achieve  major  milestone  &  target  completion
review  &  evaluate  any  revisions
submit  CWP    in  Microsoft  Project  file

iii Selection  of  Contractors/Sub-­‐contractors


review  &  comment
on  delivery  capabilities  to  undertake  contract

iv Rate  of  Work


monitor  weekly  &  monthly
actual  against  planned  
delivery/productivity
advise  BPMB  on  its  performance
refer  to  CWP

v Risk  Factors
identify  &  highlight
current  issue  &  risk  factors
affecting  milestone  and  completion
propose  mitigation  resources

vi Statutory  Authority
check  &  verify
all  approvals  &  requirements
obtained  &  complied

vii Drawdown  Requests


review  &  verify
drawdown  requests  are  justified
with  supporting  documents  &  evidence
ensure  all  claims  are  compiant  to  :
requirements  of  Contract,  construction,  workmanship,  
fabrication,  installation,  procurement  &  supply,  equipment  
&  materials.
viii Monthly  Progress  Report  &  Project  Closure  Report
prepare  &  forward
on  construction  &  development
stringently  follow  BPMB  standard  Reporting  Format

ix CPC/CCC
advise  BPMB  on  the  issuance
conforms  to  due  process  &  standard  practise

x Project  Cost
diligently  monitor
no  untoward  cost  over-­‐runs,  over-­‐claims  and  leakages
to  avoid  adverse  impact  on  overall  project  budget  &  delivery

xi Interim  Claims
periodically  monitor  &  assess  
interim  claims  &  project  expenses
against  PDA,  project  budget  and  financial  S-­‐curve

xii Take  Up  Rate  for  Leasable  Area


provide  written  confirmation  to  BPMB
Attachment  I  -­‐  Disbursement  Stage

xiii Other  Scopes


as  and  when  required
limited  to  the  SoW  &  the  ToR