Analysis of Rate For Providing/Fixing of Single Lights: Amount of 44 Pole 3% Contigency

This document provides an analysis of rates for providing and fixing single street lights. It includes: 1) Supply and installation of poles, foundations, excavation, earthing, junction boxes, cables, and light fixtures for 44 poles. 2) The total cost for providing 44 poles is estimated at Rs. 9,004,353. An additional 3% contingency of Rs. 270,131 is added. 3) The cost also includes two 50KVA transformers at Rs. 800,000 and electric connection charges of Rs. 200,000 paid to WAPDA. 4) The grand total estimated cost for the street lighting work is Rs. 10,274,484.

Uploaded by

muhammad iqbal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
395 views2 pages

Analysis of Rate For Providing/Fixing of Single Lights: Amount of 44 Pole 3% Contigency

This document provides an analysis of rates for providing and fixing single street lights. It includes: 1) Supply and installation of poles, foundations, excavation, earthing, junction boxes, cables, and light fixtures for 44 poles. 2) The total cost for providing 44 poles is estimated at Rs. 9,004,353. An additional 3% contingency of Rs. 270,131 is added. 3) The cost also includes two 50KVA transformers at Rs. 800,000 and electric connection charges of Rs. 200,000 paid to WAPDA. 4) The grand total estimated cost for the street lighting work is Rs. 10,274,484.

Uploaded by

muhammad iqbal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

ANALYSIS OF RATE FOR PROVIDING/FIXING OF SINGLE LIGHTS

Analysis for one Km


S. No. Description Qty Unit Rate Amount
PART "A"

Supply and installation of GI 24 Rft high section pole


1 6"x5"x3: dia double arm with base plate 15"x15x3/4" with 22 Each 27681 608982
protected paint two coats i/c junction jox with connector

Supply and installation of 1-1/2" dia GI pipe in road


A 390 Each 263.70 102843
crossing (heavy quality) CH:23 Item22 III-e

2 FOUNDATIONS

Making foundation having kerb 1:4:8 (6" thick of 3'x3' and


RCC 1:2:4 i/c the cost of concreting of 5'x2'x2' with a ratio
22 Each 15665 344630
of 1:2:4 jobs also covers the cost of excavation of 45 Cft
cost i/c 4 Nos anchor bolts (Analysis attached)

3 EXCAVATION

Excavation of trench for cable and conducts in all type of


had and soft soil having a size of 2x2.5 i/c the cost of 16400 %0Cft 3833.30 62866
black filling with excavated warth complete in all respect

4 EARTHING AND JUNCTION BOX


Supply and installation of "B" class warthing i/c inspection
22 P.Job 3578.65 78730
chamber (Ch:24 Item68 P-151)
5 FEEDERS & CABLES
Supply and laying of PVC sheated 4 core 660/1100 volt non
amoured cables (C-24-13-C
i) 4Cx7/0.064PVC/PVC/SWA 200 P.Rft 260.15 52030
ii) 4Cx7/0.044PVC/PVC/SWA 3564 P.Rft 127.85 455657
iii) 4Cx7/0.029PVC/PVC from junction box to light fixute 792 P.Rft 60.15 47639
6 LIGHT FIXTURE

130 Watts LED light Make philips/ indal/ thorn ( white


44 Each 62345.00 2743180
LED) for 10 m high pole (Anaysis Attached)

Supply and erection of iron / aluminum cable 500 volts


main switch with triple pole and neutral and RC fuses of
7 angle iron board with 1/8"thick M.S sheet covering i/c 1 Each 2906.1 2906
bounding of earth with necessary flexible pipe and
thimbles 60/65 Amp (C-24-18-C-III)

Supply and erection of bus bars for 500 volts 8 phase A.C
supply with 4 copper bars i/c glazed porcel in bridges on
8 angle iron board fixed with rag bolts and M.S sheet box 1 Each 2712.85 2713
1.5mm thick etc complete 60 Amp with 4 coopers bars size
1.5"x1/8" (C-24-21-I)

Total= 4502177
Rate Per Pole 4490427/22= 204644

Amount of 44 Pole= 9004353


3% Contigency= 270131
P/W of Trancformer 50 KVA PEL /Scimens Made Complete= 2 No. 400000= 800000
Provision of Electrict Connection charges paid to WAPDA= 2 No. 100000 200000
G.Total 10274484
Sub Engineer Sub Divisional Officer
Road Construction Sub Division
Bahawalnagar

DESCRIPTION OF ITEM
and washed aggregate, in required sahpe and design,i/c forms, moulds, shuttring, liffting, compacting, curring

(a) (i)
Reinforced cement in roof slab, beems