WALBRO
Guidelines and Support
     This template has been developed to support Advanced Part Quality Planning (APQP) for Suppliers to Walbro Group. The template can be used
 1
     for any project, part, or system.
 2   The requirements and PPAP submission level for submission will be determined by the Walbro Quality Representative.
     The Quality Representative will be responsible for providing the basic project information and placing an "X" in the "No Action Needed" column
 3
     for activities which will NOT be followed-up by supplier under normal circumstances.
 4   The Supplier is responsible for identifying the responsible person in the "Responsibility" column and to establish the Due Date for each activity
     The Supplier is required to report progress by filling in the "Status" column and sending the entire APQP Tracker to the Walbro Quality
 5
     representative on a regular basis. (Status explanation: ○< 25% done; ◔ 25% done; ◑ 50% done; ◕ 75% done; ● completed)
                                                                                                                                                            Form: W-4-0015
                                                                                                                                                            Rev: 5-Jan-2015
                                                                       APQP Tracker Form
Walbro Part Number:                                                                     Supplier Name:
Part Name:                                                                              Revision Level:
APQP Launch Date:                                                                       APQP Tracker Revision Date:
                        Supplier Team Members                                                                         Walbro Team Memebers
                Title                              Name                                                   Title                                 Name
          Project Manager                                                                           Project Manager
               Quality                                                                                   Quality
             Engineering                                                                               Engineering
       Supply Chain/Purchasing                                                                   Supply Chain/Purchasing
                         Status explanation:   ○< 25% done; ◔ 25% done; ◑ 50% done; ◕ 75% done; ● completed. (see Symbols tab)
                                                                                                                                             Comments /
                      Design Planning and Definition                                                   Date                     No Action               AIAG APQP
 1                                                                     Responsibility    Due Date                     Status                   Action
                 (For Suppliers with Design Resonsibility)                                           Completed                   Needed                  reference
                                                                                                                                              Required
          Design goals and specification requirements set with input
 1.1
          from Walbro
          Design Failure Mode and Effect Analysis (D-FMEA)
 1.2                                                                                                                                                        2.1
          complete
          Design For Manufacturability and Assembly (DFM/DFA)
 1.3                                                                                                                                                        2.2
          complete
 1.4      Cross-functional design reviews with Walbro                                                                                                     2.3; 2.4
 1.5      Engineering Drawings completed                                                                                                                    2.6
                                                                                                                                                Form: W-4-0015
                                                                                                                                                Rev: 5-Jan-2015
1.6    Engineering Specifications completed                                                                                                     2.7
1.7    Material specifications set                                                                                                              2.8
       Drawing and Specification Changes has been
1.8                                                                                                                                             2.9
       documented
       Major and Critical Product and Process Characteristics
1.9                                                                                                                                            2.11
       determined
       Manufacturing of prototypes and prototype approval by
1.10
       Walbro
                                                                                                                                 Comments /
                                                                                                  Date               No Action              AIAG APQP
 2                      Planning and Definition                     Responsibility   Due Date               Status                 Action
                                                                                                Completed             Needed                 reference
                                                                                                                                  Required
2.1    Supplier to review Drawing & specification                                                                                               2.7
       Special/Critical Characteristics reviewed, Capability
2.2                                                                                                                                            2.11
       requirements confirmed
       Preliminary Process flow chart and Bill of material
2.3                                                                                                                                          1.9; 1.10
       established
       New Tooling, Equipment and Facilities requirements
2.4                                                                                                                                            2.10
       established
       New Gauges, Fixtures, and Testing equipment
2.5                                                                                                                                            2.12
       requirements established
2.6    Initial capacity assessment done
2.7    Sub-Suppliers identified with approved quality audits done
2.8    Drawing & specification review with Walbro                                                                                               2.7
2.9    Feasibility study completed.                                                                                                            2.13
                                                                                                                                 Comments /
                                                                                                  Date               No Action              AIAG APQP
 3        Manufacturing Process Design and Development              Responsibility   Due Date               Status                 Action
                                                                                                Completed             Needed                 reference
                                                                                                                                  Required
                                                                                                                                            Form: W-4-0015
                                                                                                                                            Rev: 5-Jan-2015
3.1    Packaging plan reviewed with Walbro                                                                                                  3.1
3.2    Process Flow Charts created                                                                                                          3.3
       Process Failure Mode and Effect Analysis (P-FMEA)
3.3                                                                                                                                         3.6
       completed
3.4    Preliminary Control Plan completed                                                                                                   3.7
3.5    Measurement system analysis plan completed                                                                                           3.9
       New Tooling, Equipment and Facilities obtained and
3.6                                                                                                                                      2.10; 2.12
       installed
       New Gauges, Fixtures, and Testing equipment obtained
3.7                                                                                                                                        2.12
       and installed
       Equipment set-up procedures established and
3.8
       documented
3.9    Work instructions developed                                                                                                          3.8
3.10   Training plan complete and implemented
3.11   Sub-Supplier APQP plan completed
3.12   Preliminary Walbro delivery plan received
3.13   Preliminary Sub-Supplier delivery plan completed
                                                                                                                             Comments /
                                                                                              Date               No Action              AIAG APQP
 4                      Engineering Samples                     Responsibility   Due Date               Status                 Action
                                                                                            Completed             Needed                 reference
                                                                                                                              Required
4.1    Engineering samples requirements defined
4.2    Sample delivery date
       Engineering samples available - design, dimensional, &
4.3
       material verification
                                                                                                                                                    Form: W-4-0015
                                                                                                                                                    Rev: 5-Jan-2015
                                                                                                                                   Comments /
                      Significant Production Run                                                    Date               No Action              AIAG APQP
 5                                                                    Responsibility   Due Date               Status                 Action
                    Product and Process validation                                                Completed             Needed                 reference
                                                                                                                                    Required
5.1    Production Control plan established                                                                                                         4.7
5.2    Training of personnel completed
       Design FMEA (for suppliers that are design responsible) is
5.3                                                                                                                                               2.2.4
       complete
5.4    Process Flow Diagram complete                                                                                                              2.2.5
5.5    Process FMEA using AIAG format complete                                                                                                    2.2.6
       Control Plan is complete using AIAG format with all major
5.6                                                                                                                                               2.2.7
       and critical characteristics identified.
5.7    Significant Production run complete                                                                                                         4.1
5.8    Measurements System Analysis (MSA)                                                                                                          4.2
       Initial Process Potential Studies on all major and critical
5.9                                                                                                                                               2.2.11
       dimensions
5.10   Process capability study(s) complete                                                                                                        4.3
       Scrap rate calculated and action plan established if
5.11
       needed.
5.12   Capacity verified (Cycle/Tact Times verified)
       Packaging requirements verified to ensure part integrity at
5.13                                                                                                                                               4.6
       point of use
                                                                                                                                                AIAG PPAP
       Master sample stored at Supplier (Master sample of each
5.14                                                                                                                                              Manual
       multiple cavity die, tool or pattern - for future reference.
                                                                                                                                                  2.2.15
                                                                                                                                   Comments /
            PPAP Documents for submission to Walbro                                                 Date               No Action                AIAG PPAP
 6                                                                    Responsibility   Due Date               Status                 Action
         Package must be submitted in the following order                                         Completed             Needed                   reference
                                                                                                                                    Required
                                                                       Form: W-4-0015
                                                                       Rev: 5-Jan-2015
       Part Submission Warrant (PSW) complete using the
6.1                                                                2.2.18; 4.1
       Walbro Warant
       Inlcude Approved Engineering Change Documents that
6.2                                                                  2.2.2
       are not on the current production drawing
       Supplier Request for Deviation or Change forms, if any,
6.3
       have been submitted and approved by Walbro
       All Drawing dimenensions, notes, and materials are
6.4    ballooned and assigned a number (numbers must be              2.2.1
       circled)
       Dimensional Results are complete using the Walbro
6.5    Dimensional Report Form and all non-conformances              2.2.9
       clearly identified
6.6    Design FMEA (for suppliers that are design responsible)       2.2.4
6.7    Process Flow Diagram                                          2.2.5
6.8    Process FMEA using AIAG format                                2.2.6
6.9    Control Plan                                                  2.2.7
6.10   Measurement System Analysis Studies (MSA)                     2.2.8
6.11   Certification for all Checking Aids/Fixtures                  2.2.16
6.12   Initial Process Potential Studies                             2.2.11
       Appearance Approval, Material Certificate of Analysis and    2.2.13;
6.13   Performance Test Results complete. (Blanket statements       2.2.12;
       of conformance are not acceptable)                           2.2.10
       Records of Compliance with Walbro Specific
       Requirements Form complete. The Conflict Mineral Policy
6.14                                                                 2.2.17
       Statement and WEMDSL Information can be found on the
       Walbro.com supplier page
       Certificate of Compliance complete (for electronic
6.15                                                                 2.2.17
       components only)
       PPAP Sample Parts submited (must be from a significant
6.16                                                                 2.2.14
       production run)
                                                                                                                                            Form: W-4-0015
                                                                                                                                            Rev: 5-Jan-2015
6.17   Other information as requested by Walbro                                                                                           2.2.17
6.18   PPAP Package Submitted to Walbro                                                                                                   2.2.17
                                                                                                                             Comments /
                                                                                              Date               No Action              AIAG APQP
 7     Walbro approval, Start of serial production & Delivery   Responsibility   Due Date               Status                 Action
                                                                                            Completed             Needed                 reference
                                                                                                                              Required
7.1    Walbro delivery plan received and confirmed
7.2    Sub-Supplier delivery plan communicated and confirmed
○
◔
◑
◕
●
No Action Needed
                                           Revision Log & Approval
                                                      Revision Log
Rev Level   Date of Change      Change Requested By
Rel                     9-Jan-14 Quality Team
ision Log & Approval
   Revision Log
                       Nature of Change          Approval
     Initial Release                      S. Zigich