Is SP 34 1987
Is SP 34 1987
                                                                       Payment Schedule for Item No.1 of Appendix : F-1 (Survery and Investigation work etc. )
  1        1.19.1    Topographic and cadastral survey for head works of irrigation projects by using      126.00     Ha.     242.00      30492.00      1      Survey and investigation, drilling for geological
                     Total station GPS, etc. with minimum 30 number of point reading per ha, to                                                               investigations if any, slip circle stability analysis,
                     generate 15mx15m grid and 0.5 m interval contours including transfer of entire                                                           water loss testing, fixing of alignment, foundation,
                     data to computer system in different geo-referenced layers / themes using                                                                design & drawing, profiles and preparation of
                     features of standard software, compatible with design software packages,                                                                 detailed estimate as per CSR in force from 01-09-
                     including supply of soft and hard copies of point readings, including digitizing                                                         2017 on the basis of approved design, drawing,
                     village maps and super imposing the contours on village map (scale 1in 4000)                                                             clubbing of items for recording measurements and
                     including marking all permanent features like roads, cart tracks, existing canals,                                                       basis of payment getting approval of same items
                     temples, tanks, forest boundary and electric poles, etc. including marking of                                                            from the competent authority, as per specifications,
                     ridges and valleys on survey sheet including supply of 4 soft copies and 4 hard                                                          design criteria of Water Recourses Deptt, relevant
                     copies after approval of competent authority, preparation & submission of grid                                                           I.S. codes, G.S.I, circulars issued by the competent
                     and L-section nalla etc. complete.                                                                                                       authority from time to time and vetting and approval
                                                                                                                                                              of construction drawings from competent authority.
1-(a) Total Qty. & Topographic and cadastral survey for head works of irrigation
                                                                                                          126.00     Ha.      0.00     30492.00               (a) Topographic and cadastral survey for
   Amount Rs.      projects                                                                                                                          1-(a)                                                             126.00     Ha.     242.00      30492.00
                                                                                                                                                              head works of irrigation projects
                                                                                         Unit Rate =      242.00     Per       Ha.
  2        1.06.1    Chain and compass survey for headworks                                                28.05     Km.     1350.00      37868.00
  3        1.09.1    Levelling for head works below 15 m interval for basin survey and dam seat            28.05     Km.     1473.00      41318.00
                     survey.
  4        1.01.2    Dag-belling in all types of soil Double spade "V" shaped stroke (100 mm deep)        4950.00    Rm.      9.00        44550.00
5 1.11 Double levelling for transfer of bench marks. 31.50 Km. 2946.00 92799.00
1-(b) Total Qty. & Chain & Compass Survey and Levelling for head works of irrigation
                                                                                                           59.55     Km.      0.00     216535.00              (b) Chain & Compass Survey and Levelling
   Amount Rs.      projects                                                                                                                          1-(b)                                                              59.55     Km.     3636.19    216535.00
                                                                                                                                                              for head works of irrigation projects
                                                                                         Unit Rate =      3636.19    Per    Km.
  6         1.12     Providing and fixing of standard bench marks, as per type design 8 of Water           2.00      Each    1491.00      2982.00
                     Resources Dept. including fixing of MS plate size 12x12x0.60 cm and 2 Nos.
                     anchor bolts of 10 mm dia. and 30 cm length including shaping and welding etc.,
                     including cost of cement, metal and sand (for 0.13 cum M-15 nominal mix
                     concrete with 20 mm graded metal) including labour for excavation in all type of
                     strata, mixing, laying and curing of concrete including form work and fixing of MS
                     plate including cost of water for mixing and curing of concrete including all lead
                     and all lifts etc complete.
  7         1.13     White washing and figuring of bench marks as per type design 7 of Water               2.00      Each    202.00        404.00
                     Resources Department including cost of material complete.
  8        1.15.1    Providing chainage cum boundary, stone (as per type design no 4 of WRD) .            180.00     Each     57.00      10260.00
  9        1.15.2    Fixing chainage cum boundary stone,as per type design no 4 of WRD in M-7.5           180.00     Each    234.00      42120.00
                     cement concrete with 40 mm graded aggregate including excavation (any strata),
                     handling and fixing of stone, curing etc, complete.
 10        1.15.3    Painting chainage cum boundary stone as per (typre design no 4 of WRD) with          180.00     Each     54.00       9720.00
                     enamel paint and figuring and labelling with black paint including cost of paint
                     brushes etc complete.
         UCSR                                                                                                                                                                                                                              Clubbed
S. No.                                                   Item of Work                                       Quantity   Unit     Rate       Amount      S. No.                  Clubbed Item of Work                      Quantity   Unit               Amount      Remarks
          Item No.                                                                                                                                                                                                                           Rate
  1          2                                                  3                                              4        5           6         7          8                                  9                               10       11       12          13         14
  11        L.S.     Provision for sign board in both flanks as per Specification of W.R.D.                  2.00      Job    50000.00     100000.00
                     Preparation and Submission of Survey & Investigation , Design , Drawing and
  12        L.S.     Estimate of the Earthen Dam .
                                                                                                            One Job    Job    200000.00    200000.00
1-(c ) Total Qty. & ( c) Providing and Fixing of B.M.'s Stone and Chainage cum                                                                                ( c) Providing and Fixing of B.M.'s Stone
                                                                                                            182.00     Each     0.00      365486.00
   Amount Rs.       Boundary Stone for head works of irrigation projects                                                                               1-( c) and Chainage cum Boundary Stone for head                    182.00    Each   2008.16    365486.00
                                                                                              Unit Rate =   2008.16    Per    Each                            works of irrigation projects
  14        L.S.     Geological investigation report & visit of officers of G.S.I.                          One Job    Job    50000.00      50000.00
1-(d)Total Qty. &
                     (d) Geotechanical Investigation work etc.                                               45.00     Rm.      0.00      273200.00
  Amount Rs.                                                                                                                                           1-(d)    (d) Geo-techanical Investigation work etc.                45.00     Rm.    6071.11    273200.00
                                                                                              Unit Rate =   6071.11    Per    Rm.
                                                                 Payment Schedule for Item No.2 of Appendix : F-1 (Survey work for R & R Plan and L. A. Cases etc. )
  1         1.16     Labour only for survey for all types of building/ houses/wells including taking        210.00     Each    921.00      193410.00     2      Carrying out Cadastral survey for land and property
                     detailed measurements thereof, measuring components like fencing etc., and                                                                 affected due to the dam and it‘s submergence,
                     entering in register, sketching, if required, noting specifications for foundation                                                         preparing temporary land acquisition cases for
                     plinth, superstructure, roofing, flooring, doors and windows etc directly at site.                                                         borrow area required if any, permanent land
                                                                                                                                                                acquisition cases (Private land & Govt. land),fixing
                                                                                                                                                                stone on FRL and MWL line and as per
  2         L.S.     Preparation and submission of land acquisition cases village wise from dam              6.00      Each   10000.00      60000.00            specification, and preparation of Rehabilitation and
                     sheet and submergence area, W.W. and getting approval, collecting village Maps                                                             resettlement plan for the Project affected families as
                     & certified copies of Khasra & B1 marked land acquired area on village maps                                                                per prevailing guidelines for “Right to fair
                     and prepared complete cases fro land acquisition & submit to L.A. officers in four                                                         compensation and transparency in land acquisition,
                     copies. Property survey in total submergence area coming under M.W.L. and                                                                  rehabilitation and resettlement act.’’
                     preparation of rehabilitation & resettlement plan and getting approval or as
                     directed by the Engineer-in-charge.
  3         L.S.     Preparation of Property Acquisition Case & drawings & getting approval by               6.00      Each    5000.00      30000.00
                     competant authority.
  4         L.S.     Preparation of R & R Plan and getting approval by competant authority.                  1.00      Each   10000.00      10000.00
 2 - Total Qty. &    Survey work for Preparation of Land Acquisition Cases including R
                                                                                                             7.00      Each     0.00      293410.00             Survey work for Preparation of Land
  Amount Rs.         & R Plan etc.                                                                                                                      2-                                                                 7.00     Each   41915.71   293410.00
                                                                                                                                                                Acquisition Cases including R & R Plan etc.
                                                                                              Unit Rate = 41915.71     Per    Each
                                                                                     Payment Schedule for Item No.3 of Appendix : F-1 (Earth Dam Work etc. )
                                                                                                                                                         3      Earth dam and all related works as per approved
                                                                                                                                                                design, drawing, specifications of WRD, G.S.I.,
                                                                                                                                                                relevant IS Codes, and circulars issued by the
                                                                                                                                                                relevant department from time to time. including
                                                                                                                                                                completion of foundation excavation, treatment of
                                                                                                                                                                cut off, drilling, grouting and testing of foundation,
                                                                                                                                                                filling of cut-off and all other related base works
                                                                                                                                                                such as stripping, benching, laying filters,
                                                                                                                                                                construction of boulder toe , chimney filter,
                                                                                                                                                                earthwork on dam, pitching, spoil etc. as per
                                                                                                                                                                approved drawings and specifications, including
                                                                                                                                                                construction and fixing of notches etc. complete.
3 - (a) Total Qty. & (a) Excavation in all type of Soils and Rocks for all Components of                                                                        (a) Excavation in all type of Soils and Rocks
                                                                                                             0.00       0       0.00        0.00
    Amount Rs.       Earthen Dam and Approach & Spill Channel etc .                                                                                    3-(a)    for all Components of Earthen Dam and                    16745.90   Cum.    102.30    1713106.00
                                                                                                                                                                Approach & Spill Channel etc .
         UCSR                                                                                                                                                                                                            Clubbed
S. No.                                            Item of Work                               Quantity     Unit        Rate     Amount   S. No.                 Clubbed Item of Work               Quantity     Unit                 Amount         Remarks
          Item No.                                                                                                                                                                                                         Rate
                                                                                                                                                  (a) Excavation in all type of Soils and Rocks
  1          2                                           3                                      4           5           6        7        8
                                                                                                                                        3-(a)     for all Components of9Earthen Dam and              10
                                                                                                                                                                                                  16745.90     11
                                                                                                                                                                                                              Cum.         12
                                                                                                                                                                                                                         102.30        13
                                                                                                                                                                                                                                   1713106.00          14
                                                                               Unit Rate =   102.30       Per         Cum.                        Approach & Spill Channel etc .
3 - (b) Total Qty. & (b) Providing and Filling of C.O.T. with Treatment of Foundation by                                                          (b) Providing and Filling of C.O.T. with
                                                                                              0.00          0         0.00      0.00
    Amount Rs.       Curtain Grouting etc.                                                                                              3-(b)     Treatment of Foundation by Curtain              6480.50     Cum.        75.00    486038.00
                                                                               Unit Rate =    75.00       Per         Cum.                        Grouting etc.
3 - (C) Total Qty. & (c ) Providing & Laying of Filter Materials and Rock Toe for Extended                                                        (c ) Providing & Laying of Filter Materials
                                                                                              0.00          0         0.00      0.00
    Amount Rs.       Filter, Seepage Drains, Toe Drains & Boulder Toe etc.                                                              3-(C)     and Rock Toe for Extended Filter, Seepage         0.00      Cum.         0.00       0.00
                                                                                                                                                  Drains, Toe Drains & Boulder Toe etc.
                                                                               Unit Rate =    0.00        Per         Cum.
3 - (d) Total Qty. & (d) Providing & Laying of Earth work for hearting / casing of dam                                                            (d) Providing & Laying of Earth work for
                                                                                              0.00          0         0.00      0.00
    Amount Rs.       including Watering and Compaction etc.                                                                             3-(d)     hearting / casing of dam including Watering       0.00      Cum.         0.00       0.00
                                                                               Unit Rate =    0.00        Per         Cum.                        and Compaction etc.
2 Chain and compass survey for headworks 28.05 1350.00 Km. 37868.00 1.06.1
 3    Levelling for head works below 15 m interval     28.05      1473.00 Km.       41318.00 1.09.1
      for basin survey and dam seat survey.
 4    Dag-belling in all types of soil Double spade   4950.00          9.00 Rm.     44550.00 1.01.2
      "V" shaped stroke (100 mm deep)
 5    Double levelling for transfer of bench marks.    31.50     2946.00    Km.     92799.00    1.11
 6    Providing and fixing of standard bench           2.00       1491.00 Each       2982.00    1.12
      marks, as per type design 8 of Water
      Resources Dept. including fixing of MS plate
      size 12x12x0.60 cm and 2 Nos. anchor bolts
      of 10 mm dia. and 30 cm length including
      shaping and welding etc., including cost of
      cement, metal and sand (for 0.13 cum M-15
      nominal mix concrete with 20 mm graded
      metal) including labour for excavation in all
      type of strata, mixing, laying and curing of
      concrete including form work and fixing of
      MS plate including cost of water for mixing
      and curing of concrete including all lead and
      all lifts etc complete.
 S.                     Item of work                    Quantity      Rate         Unit       Amount          USR
No.                                                                                                         Item no
 1                         2                               3            4       5                 6            7
 7     White washing and figuring of bench marks         2.00           202.00 Each                404.00    1.13
       as per type design 7 of Water Resources
       Department including cost of material
       complete.
 8     Providing chainage cum boundary, stone (as       180.00           57.00 Each            10260.00 1.15.1
       per type design no 4 of WRD) .
 9     Fixing chainage cum boundary stone,as per        180.00          234.00 Each            42120.00 1.15.2
       type design no 4 of WRD in M-7.5 cement
       concrete with 40 mm graded aggregate
       including excavation (any strata), handling
       and fixing of stone, curing etc, complete.
10     Painting chainage cum boundary stone as          180.00           54.00 Each              9720.00 1.15.3
       per (typre design no 4 of WRD) with enamel
       paint and figuring and labelling with black
       paint including cost of paint brushes etc
       complete.
11     Provision for sign board in both flanks as per    2.00        50000.00      Job        100000.00       L.S.
       Specification of W.R.D.
12     Preparation and Submission of Survey & One Job 200000.00 Job                           200000.00       L.S.
       Investigation , Design , Drawing and Estimate
       of the Earthen Dam .
                            GEO-TECH INVESTIGATION WORK
13     Drilling by diamond drilling , holes of         45.00 4960.00 Rm.                      223200.00 1.18.1.1
       minimum 75 mm dia. vertical or at inclination
       using diamond core drilling bit , double barrel
       tube in masonary , concrete or rock
       including cost of all materials, machinery,
       labour, water , collection of core samples ,
       logging and labelling samples , supplying
       wooden core box and re-drilling in case of
       collapse of sides etc. complete . For depth up
       to 30m from surface. 0* to 10* vertically
       dowanwards .
14     Geological investigation report & visit of       One Job      50000.00      Job         50000.00       L.S.
       officers of G.S.I.
                     Total Amount Rs.                                                         885713.00
                      Say Rs. In lakh                                                              8.86
                                                                           Authorised Signatory
                      Design Consultant                                 M/s Ambrish Kumar Tripathi,
                 M/s Ambrish Kumar Tripathi,                           Civil Contractor, Bhopal. (M.P.)
                Civil Contractor, Bhopal. (M.P.)
 S.                                                                                                       USR
                       Item of work                       No.       L.      B.    D/H.     Quantity
No.                                                                                                     Item no
 1                           2                             3        4        5     6          7           8
                                 DAM ALIGNMENT SURVEY WORK
 1    Topographic and cadastral survey for head                                                         1.19.1
      works of irrigation projects by using Total
      station GPS, etc. with minimum 30 number of
      point reading per ha, to generate 15mx15m
      grid and 0.5 m interval contours including
      transfer of entire data to computer system in
      different geo-referenced layers / themes
      using features of standard software,
      compatible with design software packages,
      including supply of soft and hard copies of
      point readings, including digitizing village
      maps and super imposing the contours on
      village map (scale 1in 4000) including
      marking all permanent features like roads,
      cart tracks, existing canals, temples, tanks,
      forest boundary and electric poles, etc.
      including marking of ridges and valleys on
      survey sheet including supply of 4 soft copies
      and 4 hard copies after approval of
      competent       authority,   preparation     &
      submission of grid and L-section nalla etc.
      complete.
      (A) Survery for Dam alignment                      0.0001   900.00    600            54.00 Ha.
      (B) Survery for Approach & Spill Channel 0.0001             1200.00   600            72.00 Ha.
      alignment
                    Total Quantity                                                        126.00 Ha.
 2    Chain and compass survey For headworks                                                            1.06.1
      (a)(i) Dam Axis Base line                            1      750.00                   750.00 M.
      (a)(ii) X-Section at 10 m interval 90m. Each        76      180.00                  13680.00 M.
      side.
      (b)(i) Approach & Spill channel base line            3      900.00                  2700.00 M.
      (b)(ii) X-Sec. at 10 m interval 60 m either side    91      120.00                  10920.00 M.
                                                                                  Total   28050.00 M.
                                                                                   Say    28.05 Km.
 3    Levelling for head works Above 10 m interval                                                      1.09.1
      for basin survey and dam seat survey.
                                                                                  Total   28050.00 M.
                                                                                   Say    28.05 Km.
 S.                                                                                                 USR
                      Item of work                    No.      L.      B.   D/H.     Quantity
No.                                                                                               Item no
 1                           2                         3       4       5     6          7            8
 4    Dag-belling in all types of soil Double spade                                               1.01.2
      "V" shaped stroke (100 mm deep)
      (a)(i) Dam Axis Base & Toe line                  3     750.00                 2250.00 M.
      (b)(i) Approach & Spill channel base line        3     900.00                 2700.00 M.
                                                                            Total   4950.00 M.
 5    Double levelling for transfer of bench marks.                                                1.13
      For Fixing Chainage cum Boundary Stone for        180        1.00                             180 No.
      Dam and Approach & Spill Channel @30m. =
      3 X 1800 / 30 = 180 Nos.
 3     Preparation of Property Acquisition Case &         6.00        5000.00 Each            30000.00      L.S.
       drawings & getting approval by competant
       authority.
 4     Preparation of R & R Plan and getting              1.00       10000.00 Each            10000.00      L.S.
       approval by competant authority.
                                                                          Authorised Signatory
                      Design Consultant                                M/s Ambrish Kumar Tripathi,
                 M/s Ambrish Kumar Tripathi,                          Civil Contractor, Bhopal. (M.P.)
                Civil Contractor, Bhopal. (M.P.)
  INCLUDING THE WORK OF SURVEY , GEO-TECH INVESTIGATION , DESIGN ,DRAWING , ESTIMATE , AND EXCAVATION IN ALL STRATA FOR ALL COMPONENTS OF SPILLWAY & ALLIED
       WORKS , ANCHORING , LAYING OF C.C. & R.C.C. , STEEL REINFORCEMENT , AND INCLUDING WORK OF APPROACH ROADS & BUILDINGS , TRIAL & COMISSINING ETC.
                                                                                                                                                                                                                                    U.C.S.R. w.e.f. 01-09-2017
         UCSR                                                                                                                                                                                                                       Clubbed
S. No.                                          Item of Work                                 Quantity   Unit     Rate     Amount       S. No.                       Clubbed Item of Work                          Quantity   Unit                Amount          Remarks
          Item No.                                                                                                                                                                                                                    Rate
  1          2                                        3                                         4        5           6       7           8                                     9                                    10       11       12            13             14
                                                                       Payment Schedule for Item No.1 of Appendix : F-2 (Survery and Investigation work etc. )
  1        1.19.1    Topographic and cadastral survey for head works of irrigation           2001.67    Ha.     242.00     484404.00     1      Survey and investigation ,review of hydrology, drilling water
                     projects by using Total station GPS, etc. with minimum 30 number                                                           loss testing, fixing of alignment, foundation, design, drawing,
                     of point reading per ha, to generate 15mx15m grid and 0.5 m                                                                profiles and preparation of detailed estimate as per CSR in
                     interval contours including transfer of entire data to computer                                                            force from 01-09-2017 on the basis of approved design,
                     system in different geo-referenced layers / themes using features                                                          drawing, clubbing of items for records measurements and
                     of standard software, compatible with design software packages,                                                            basis of payment getting approval of same items from the
                     including supply of soft and hard copies of point readings, including                                                      competent authority, as per specifications, design criteria of
                     digitizing village maps and super imposing the contours on village                                                         W.R.D, relevant I.S. codes, G.S.I and circulars issued by the
                     map (scale 1in 4000) including marking all permanent features like                                                         department from time to time, preparing, temporary land
                     roads, cart tracks, existing canals, temples, tanks, forest boundary                                                       acquisition cases for borrow area required if any, Permanent
                     and electric poles, etc. including marking of ridges and valleys on                                                        land acquisition cases (Private land, Government land, Forest
                     survey sheet including supply of 4 soft copies and 4 hard copies                                                           land if any),. vetting of construction drawings from and
                     after approval of competent authority, preparation & submission of                                                         approval from the competent authority. The work also includes
                     grid and L-section nalla etc. complete.                                                                                    survey and fixing of boundary stones for FRL and MWL and
                                                                                                                                                property survey under guidance of departmental
                                                                                                                                                representative for submergence and property between FRL
                                                                                                                                                and MWL.
  2        1.06.1    Chain and compass survey for headworks                                   45.00     Km.     1350.00     60750.00
  3        1.09.1    Levelling for head works below 15 m interval for basin survey and        45.00     Km.     1473.00     66285.00
                     dam seat survey.
  4        1.01.2    Dag-belling in all types of soil Double spade "V" shaped stroke 45000.00           Rm.      9.00      405000.00
                     (100 mm deep)
  5         1.11     Double levelling for transfer of bench marks.                            45.00     Km.     2946.00    132570.00
  6        1.15.1    Providing chainage cum boundary, stone (as per type design no 4         300.00     Each     57.00      17100.00
                     of WRD) .
  7        1.15.2    Fixing chainage cum boundary stone,as per type design no 4 of           300.00     Each    234.00      70200.00
                     WRD in M-7.5 cement concrete with 40 mm graded aggregate
                     including excavation (any strata), handling and fixing of stone,
                     curing etc, complete.
  8        1.15.3    Painting chainage cum boundary stone as per (typre design no 4 of       300.00     Each     54.00      16200.00
                     WRD) with enamel paint and figuring and labelling with black paint
                     including cost of paint brushes etc complete.
1-(a) Total Qty. & (a) Basin Survey and Fixing of FRL Stone with Survey
                                                                                             2001.67    Ha.      0.00     1252509.00
   Amount Rs.      Work etc.
 14         1.13     White washing and figuring of bench marks as per type design 7 of         2.00       Each       202.00         404.00
                     Water Resources Department including cost of material complete.
 15         L.S.     Provision for sign board at Spillway Site as per specification of         2.00        Job      50000.00     100000.00
                     W.R.D.
 16         L.S.     Preparation and Submission of Survey & Investigation , Design ,          One Job      Job     700000.00     700000.00
                     Drawing and Estimate of the Spillway .
1-(b) Total Qty. & (b) Spillway Alignment , Design, Drawing and Estimate
                                                                                               28.80       Km.         0.00     1096548.00
   Amount Rs.      etc.
18 L.S. Geological investigation report & visit of officers of G.S.I. One Job Job 200000.00 200000.00
Unit Rate = 8596.36 Per Rm. 1-(c ) ( c) Geological Investigations for Spillway etc. 55.00 Rm. 8596.33 472800.00
                                                Design Consultant                                  Authorised Signatory                                  (Akhilesh Chandorkar)         (M.K. Mishra)                  (D.K. Jain)                 (R.C. Tiwari)
                                          M/s Ambrish Kumar Tripathi ,                         M/s Ambrish Kumar Tripathi ,                                             Sub Engineer                            Sub Divisional Officer        Executive Engineer
                                          Civil Contractor,Bhopal (M.P.)                       Civil Contractor,Bhopal (M.P.)                                    Water Resources Sub Division                 Water Resources Sub Division   Water Resources Division
                                                                                                                                                                        Damoh (M.P.)                                 Damoh (M.P.)                 Damoh (M.P.)
         UCSR                                                                                                                          Clubbed
S. No.               Item of Work   Quantity   Unit   Rate       Amount              S. No.   Clubbed Item of Work   Quantity   Unit                   Amount                 Remarks
          Item No.                                                                                                                       Rate
  1          2            3            4        5      6              7                8               9               10       11       12                 13
                                                                                                                                                 ..........................     14
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                                                             .....................
                                                                                                                                                 ..........................
                     SATDHARU MEDIUM IRRIGATION PROJECT
                             ABSTRACT OF COST OF UNIT - I HEAD WORK
            SPILLWAY ALIGNMENT AND BASIN SURVEY (Pay. Sch. F-2, Item No.-1)
2 Chain and compass survey for headworks 45.00 1350.00 Km. 60750.00 1.06.1
 3    Levelling for head works below 15 m interval      45.00     1473.00 Km.      66285.00 1.09.1
      for basin survey and dam seat survey.
 4    Dag-belling in all types of soil Double spade 45000.00           9.00 Rm.   405000.00 1.01.2
      "V" shaped stroke (100 mm deep)
 5    Double levelling for transfer of bench marks.   45.00       2946.00 Km.     132570.00    1.11
 6    Providing chainage cum boundary, stone (as       300.00       57.00 Each     17100.00 1.15.1
      per type design no 4 of WRD) .
 7    Fixing chainage cum boundary stone,as per        300.00     234.00 Each      70200.00 1.15.2
      type design no 4 of WRD in M-7.5 cement
      concrete with 40 mm graded aggregate
      including excavation (any strata), handling
      and fixing of stone, curing etc, complete.
 8    Painting chainage cum boundary stone as          300.00       54.00 Each     16200.00 1.15.3
      per (typre design no 4 of WRD) with enamel
      paint and figuring and labelling with black
      paint including cost of paint brushes etc
      complete.
           SPILLWAY ALIGNMENT , DESIGN , DRAWING AND ESTIMATE WORK
 9    Chain and compass survey for headworks            28.80     1350.00 Km.      38880.00 1.06.1
10    Levelling for head works below 15 m interval      28.80     1473.00 Km.      42422.00 1.09.1
      for basin survey and dam seat survey.
 S.                     Item of work                     Quantity      Rate         Unit       Amount         USR
No.                                                                                                         Item no
1                              2                            3            4         5              6         7
11     Dag-belling in all types of soil Double spade     3900.00             9.00 Rm.           35100.00 1.01.2
       "V" shaped stroke (100 mm deep)
12     Double levelling for transfer of bench marks.      60.00        2946.00 Km.             176760.00      1.11
13     Providing and fixing of standard bench             2.00         1491.00 Each               2982.00     1.12
       marks, as per type design 8 of Water
       Resources Dept. including fixing of MS plate
       size 12x12x0.60 cm and 2 Nos. anchor bolts
       of 10 mm dia. and 30 cm length including
       shaping and welding etc., including cost of
       cement, metal and sand (for 0.13 cum M-15
       nominal mix concrete with 20 mm graded
       metal) including labour for excavation in all
       type of strata, mixing, laying and curing of
       concrete including form work and fixing of
       MS plate including cost of water for mixing
       and curing of concrete including all lead and
       all lifts etc complete.
14     White washing and figuring of bench marks          2.00           202.00 Each               404.00     1.13
       as per type design 7 of Water Resources
       Department including cost of material
       complete.
15     Provision for sign board at Spillway Site as  2.00             50000.00      Job        100000.00      L.S.
       per specification of W.R.D.
16     Preparation and Submission of Survey & One Job               700000.00       Job        700000.00      L.S.
       Investigation , Design , Drawing and Estimate
       of the Spillway .
                              GEO-TECH INVESTIGATION WORK
17     Drilling by diamond drilling , holes of            55.00        4960.00 Rm.             272800.00 1.18.1.1
       minimum 75 mm dia. vertical or at inclination
       using diamond core drilling bit , double barrel
       tube in masonary , concrete or rock
       including cost of all materials, machinery,
       labour, water , collection of core samples ,
       logging and labelling samples , supplying
       wooden core box and re-drilling in case of
       collapse of sides etc. complete . For depth up
       to 30m from surface. 0* to 10* vertically
       dowanwards .
18     Geological investigation report & visit of        One Job    200000.00       Job        200000.00      L.S.
       officers of G.S.I.
                     Total Amount Rs.                                                        2821857.00
                      Say Rs. In lakh                                                             28.22
                                                                            Authorised Signatory
                      Design Consultant                                  M/s Ambrish Kumar Tripathi,
                 M/s Ambrish Kumar Tripathi,                            Civil Contractor, Bhopal. (M.P.)
                Civil Contractor, Bhopal. (M.P.)
 S.                                                                                                    USR
                         Item of work                  No.      L.       B.    D/H.     Quantity
No.                                                                                                  Item no
 1                            2                         3       4        5      6          7           8
              BASIN SURVEY AND FIXING OF F.R.L. STONE WITH SURVEY WORK
 1    Topographic and cadastral survey for head                                                      1.19.1
      works of irrigation projects by using Total
      station GPS, etc. with minimum 30 number of
      point reading per ha, to generate 15mx15m
      grid and 0.5 m interval contours including
      transfer of entire data to computer system in
      different geo-referenced layers / themes
      using features of standard software,
      compatible with design software packages,
      including supply of soft and hard copies of
      point readings, including digitizing village
      maps and super imposing the contours on
      village map (scale 1in 4000) including
      marking all permanent features like roads,
      cart tracks, existing canals, temples, tanks,
      forest boundary and electric poles, etc.
      including marking of ridges and valleys on
      survey sheet including supply of 4 soft copies
      and 4 hard copies after approval of
      competent       authority,   preparation     &
      submission of grid and L-section nalla etc.
      complete.
Submergence Area Survery for Basin Plan 1 2001.67 1.00 2001.67 Ha.