1) A new panel will temporarily draw power from an existing main distribution panel's spare 800A circuit breaker, which is not connected to UPS or generator backup power. 2) Two proposals are presented: install a static UPS to provide 5 minutes of backup power for small outages, or redesign loads and connect some to existing UPS systems after reconfiguring connections from three transformers to improve reliability. 3) Further vendor advice is needed to study disconnecting non-critical loads like chillers from the new panel design.

Uploaded by

Said Touhami
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
117 views1 page

Cable Routing Final 3rd

1) A new panel will temporarily draw power from an existing main distribution panel's spare 800A circuit breaker, which is not connected to UPS or generator backup power. 2) Two proposals are presented: install a static UPS to provide 5 minutes of backup power for small outages, or redesign loads and connect some to existing UPS systems after reconfiguring connections from three transformers to improve reliability. 3) Further vendor advice is needed to study disconnecting non-critical loads like chillers from the new panel design.

Uploaded by

Said Touhami
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Temporally this panel will feed from the main distribution panel MDB1 ( TR.

1 2000KVA) from a spare circuit breaker 800A, and as this 800


Amps circuit breaker is not connected to neither UPS nor Generator so the proposals are:
1 ) Install a static UPS with batteries which will keep the line running for a duration for 5 minutes and eliminate small power off only but it
can't grantee operate the line more than this
2 )As - built SLD for three transformers and re-design all loads to allow studying disconnect some not important loads like chillers (vendor
advise is needed) and connect the complete new line to existing UPSs

Rev Date By Check Description

Client

Nestle Water Algerie Spa.


Prepared By

Engineering Services & Consultancy Center Co.


Water Way, Unit BS08, Parcel 22A NI, New Cairo

Tel/ Fax: +202 22900908

DWG. Name
5L line 2 Distribution Board SLD
New panel design
Scale DWG. Number Designed By Drawn By Checked By
M.Abdelsattar M.Abdelsattar

You might also like