Name of Road: Generalised Per KM Cost Package No.: For 1st Year SL No Item of Work Qntty Unit Rate Amount SOR 2016-17 Ref No

The document outlines the costs for various road maintenance items over a 5 year period. It includes details on restoring rain cuts, shoulder maintenance, repairing potholes, culvert and railing maintenance, signage, trimming vegetation and other items. The total cost for all 5 years is estimated to be Rs. 471146.00.

Uploaded by

Hoque joynul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views24 pages

Name of Road: Generalised Per KM Cost Package No.: For 1st Year SL No Item of Work Qntty Unit Rate Amount SOR 2016-17 Ref No

The document outlines the costs for various road maintenance items over a 5 year period. It includes details on restoring rain cuts, shoulder maintenance, repairing potholes, culvert and railing maintenance, signage, trimming vegetation and other items. The total cost for all 5 years is estimated to be Rs. 471146.00.

Uploaded by

Hoque joynul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 24

PRADHAN MANTRI GRAM SADAK YOJANA FOR 2016-17

Name of Road :
Generalised per km cost Package No. :
For 1st Year
Sl No SOR 2016-17 Item of work Qntty Unit Rate Amount
Ref No.
1 15.1 A Restoration of rain cuts 45.00 cum 101.00 4545.00

2 15.2.I Maintenance of earthen shoulder 250.00 sqm 62.00 15500.00


(stripping of excess soil)
3 15.3.I Repair of pot holes by removal of 0.00 sqm 6976.00 0.00
failed material and filling with
75mm BM
4 15.3.IV Maintenance of Bituminous surface 0.00 sqm 165.00 0.00
(Repair to pot holes and removal of
5 15.7.I loose material)
Maintenance of Hume pipe 4 no 1238.00 4952.00
culverts
6 15.9 Maintenance of Road signs 0.50 km 927.00 463.50

7 15.10.II Maintenance of RCC railing 0.38 m 148.00 56.24

8 15.11 Maintenance of 200 m stones and 1.00 km 326.00 326.00


Km stones
9 15.12.I Cutting branches of trees from 20 no 64.00 1280.00
roadway
10 15.12.II Cutting of shrubs from roadway 40 no 4.00 160.00
11 15.12.III Trimming grass and weeds from 270.00 sqm 1.00 270.00
shoulder

12 15.13 White washing of parapet walls of 10.00 sqm 13.00 130.00


CD works
Total 27682.74
Say Rs. 27683.00
For 2nd Year
1 15.1 A Restoration of rain cuts 54.00 cum 101.00 5454.00

2 15.2.I Maintenance of earthen shoulder 300.00 sqm 62.00 18600.00


( stripping of excess soil)
3 15.3.I Repair of pot holes by removal of 0.00 sqm 6976.00 0.00
failed material and filling with
75mm BM
4 15.3.IV Maintenance of Bituminous surface 0.00 sqm 165.00 0.00
(Repair to pot holes and removal of
loose material)
5 15.7.I Maintenance of Hume pipe 4 no 1238.00 4952.00
culverts
6 15.9 Maintenance of Road signs 0.50 km 927.00 463.50

7 15.10.II Maintenance of RCC railing 0.76 m 148.00 112.48

8 15.11 Maintenance of 200 m stones and 1.00 km 326.00 326.00


Km stones
Sl No SOR 2016-17 Item of work Qntty Unit Rate Amount
Ref No.
9 15.12.I Cutting branches of trees from 20 no 64.00 1280.00
roadway
10 15.12.II Cutting of shrubs from roadway 40 no 4.00 160.00
11 15.12.III Trimming grass and weeds from 337.50 sqm 1.00 337.50
shoulder

12 15.13 White washing of parapet walls of 10.00 sqm 13.00 130.00


CD works
Total 31815.48
Say Rs. 31815.00
Sl No SOR 2016-17 Item of work Qntty Unit Rate Amount
Ref No.
For 3rd Year
1 15.1 A Restoration of rain cuts 63.00 cum 101.00 6363.00

2 15.2.I Maintenance of earthen shoulder 350.00 sqm 62.00 21700.00


( stripping of excess soil)
3 15.3.I Repair of pot holes by removal of 8.78 sqm 6976.00 61249.28
failed material and filling with
75mm BM
4 15.3.IV Maintenance of Bituminous surface 70.31 sqm 165.00 11601.15
(Repair to pot holes and removal of
loose material)
5 15.7.I Maintenance of Hume pipe 4 no 1238.00 4952.00
culverts
6 15.9 Maintenance of Road signs 0.50 km 927.00 463.50

7 15.10.II Maintenance of RCC railing 1.52 m 148.00 224.96

8 15.11 Maintenance of 200 m stones and 1.00 km 326.00 326.00


Km stones
9 15.12.I Cutting branches of trees from 20 no 64.00 1280.00
roadway
10 15.12.II Cutting of shrubs from roadway 40 no 4.00 160.00
11 15.12.III Trimming grass and weeds from 337.50 sqm 1.00 337.50
shoulder

12 15.13 White washing of parapet walls of 10.00 sqm 13.00 130.00


CD works

Total 108787.39
Say Rs. 108787.00
For 4th Year
1 15.1 A Restoration of rain cuts 72.00 cum 101.00 7272.00

2 15.2.I Maintenance of earthen shoulder 400.00 sqm 62.00 24800.00


(stripping of excess soil)
3 15.3.I Repair of pot holes by removal of 10.54 sqm 6976.00 73527.04
failed material and filling with
75mm BM
4 15.3.IV Maintenance of Bituminous surface 93.75 sqm 165.00 15468.75
(Repair to pot holes and removal of
loose material)
5 15.7.I Maintenance of Hume pipe 4 no 1238.00 4952.00
culverts
6 15.9 Maintenance of Road signs 0.50 km 927.00 463.50

7 15.10.II Maintenance of RCC railing 1.90 m 148.00 281.20

8 15.11 Maintenance of 200 m stones and 1.00 km 326.00 326.00


Km stones
9 15.12.I Cutting branches of trees from 20 no 64.00 1280.00
roadway
Sl No SOR 2016-17 Item of work Qntty Unit Rate Amount
Ref No.
10 15.12.II Cutting of shrubs from roadway 40 no 4.00 160.00
11 15.12.III Trimming grass and weeds from 337.50 sqm 1.00 337.50
shoulder

12 15.13 White washing of parapet walls of 10.00 sqm 13.00 130.00


CD works
Total 128997.99
Say Rs. 128998.00
Sl No SOR 2016-17 Item of work Qntty Unit Rate Amount
Ref No.
For 5th Year
1 15.1 A Restoration of rain cuts 81.00 cum 101.00 8181.00

2 15.2.I Maintenance of earthen shoulder 450.00 sqm 62.00 27900.00


( stripping of excess soil)
3 15.3.I Repair of pot holes by removal of 15.81 sqm 6976.00 110290.56
failed material and filling with
75mm BM
4 15.3.IV Maintenance of Bituminous surface 117.19 sqm 165.00 19336.35
(Repair to pot holes and removal of
loose material)
5 15.7.I Maintenance of Hume pipe 4 no 1238.00 4952.00
culverts
6 15.9 Maintenance of Road signs 0.50 km 927.00 463.50

7 15.10.II Maintenance of RCC railing 1.90 m 148.00 281.20

8 15.11 Maintenance of 200 m stones and 1.00 km 326.00 326.00


Km stones
9 15.12.I Cutting branches of trees from 20 no 64.00 1280.00
roadway
10 15.12.II Cutting of shrubs from roadway 40 no 4.00 160.00
11 15.12.III Trimming grass and weeds from 562.50 sqm 1.00 562.50
shoulder

12 15.13 White washing of parapet walls of 10.00 sqm 13.00 130.00


CD works
Total 173863.11
Say Rs. 173863.00
5 Years Total 471146.00
For 5th Year
1 15.1 A Restoration of rain cuts 81.00 cum 101.00 8181.00

2 15.2.I Maintenance of earthen shoulder 450.00 sqm 62.00 27900.00


( stripping of excess soil)
3 15.3.I Repair of pot holes by removal of 15.81 sqm 6976.00 110290.56
failed material and filling with
75mm BM
4 15.3.IV Maintenance of Bituminous surface 117.19 sqm 165.00 19336.35
(Repair to pot holes and removal of
loose material)
5 15.7.I Maintenance of Hume pipe 4 no 1238.00 4952.00
culverts
6 15.9 Maintenance of Road signs 0.50 km 927.00 463.50

7 15.10.II Maintenance of RCC railing 1.90 m 148.00 281.20

8 15.11 Maintenance of 200 m stones and 1.00 km 326.00 326.00


Km stones
9 15.12.I Cutting branches of trees from 20 no 64.00 1280.00
roadway
10 15.12.II Cutting of shrubs from roadway 40 no 4.00 160.00
Sl No SOR 2016-17 Item of work Qntty Unit Rate Amount
Ref No.
11 15.12.III Trimming grass and weeds from 562.50 sqm 1.00 562.50
shoulder

12 15.13 White washing of parapet walls of 10.00 sqm 13.00 130.00


CD works
Total 173863.11
Say Rs. 173863.00
5 Years Total 753796.00
4

ASM/CO/2016/3692
N MANTRI GRAM SADAK YOJANA FOR 2016-17

Remarks

total 6% raincuts for 1st


year
total 10 % for 1st year

not required

not required

maintenance to be done
twice a year
maintenance to be done
once in 2 years
considering 2% requiring
maintenance

considering 12% of the


total area requiring grass
trimming

total 7.2% raincuts for 2nd


year
total 12 % for 1st year

not required

not required

maintenance to be done
twice a year
maintenance to be done
once in 2 years
considering 4% requiring
maintenance
Remarks

considering 15% of the


total area requiring grass
trimming
Remarks

total 8.4% raincuts for 3rd


year
total 14 % for 3rd year

total 2.5% requiring


maintenance for 3rd year

total 1.5% requiring


maintenance for 3rd year

maintenance to be done
twice a year
maintenance to be done
once in two years
considering 8% requiring
maintenance

considering 15% of the


total area requiring grass
trimming

total 9.6% raincuts for 1st


year
total 16 % for 4th year

total 3% requiring
maintenance for 4th year

total 2% requiring
maintenance for 4th year

maintenance to be done
twice a year
maintenance to be done
once in two years
considering 10% requiring
maintenance
Remarks

considering 15% of the


total area requiring grass
trimming
Remarks

total 10.8% raincuts for


1st year
total 18 % requiring
maintenance for 5th year
total 4.5 % requiring
maintenance for 5th year

total 2.5 % requiring


maintenance for 5th year
maintenance to be done
twice a year
maintenance to be done
once in two years
considering 10% requiring
maintenance

considering 25% of the


total area requiring grass
trimming

total 10.8% raincuts for


1st year
total 18 % requiring
maintenance for 5th year
total 4.5 % requiring
maintenance for 5th year

total 2.5 % requiring


maintenance for 5th year

maintenance to be done
twice a year
maintenance to be done
once in two years
considering 10% requiring
maintenance
Remarks

considering 25% of the


total area requiring grass
trimming
PRADHAN MANTRI GRAM SADAK YOJANA FOR 2016-17
Name of Road :
Generalised per km cost Package No. :
For 1st Year
Sl No SOR 2016-17 Item of work Qntty Unit Rate Amount
Ref No.
1 15.1 A Restoration of rain cuts 45.00 cum 101.00 4545.00

2 15.2.I Maintenance of earthen shoulder 250.00 sqm 62.00 15500.00


(stripping of excess soil)
3 15.3.I Repair of pot holes by removal of 0.00 sqm 6976.00 0.00
failed material and filling with
75mm BM
4 15.3.IV Maintenance of Bituminous surface 0.00 sqm 165.00 0.00
(Repair to pot holes and removal of
5 15.7.I loose material)
Maintenance of Hume pipe 4 no 1238.00 4952.00
culverts
6 15.9 Maintenance of Road signs 0.50 km 927.00 463.50

7 15.10.II Maintenance of RCC railing 0.38 m 148.00 56.24

8 15.11 Maintenance of 200 m stones and 1.00 km 326.00 326.00


Km stones
9 15.12.I Cutting branches of trees from 20 no 64.00 1280.00
roadway
10 15.12.II Cutting of shrubs from roadway 40 no 4.00 160.00
11 15.12.III Trimming grass and weeds from 270.00 sqm 1.00 270.00
shoulder

12 15.13 White washing of parapet walls of 10.00 sqm 13.00 130.00


CD works
Total 27682.74
Say Rs. 27683.00
For 2nd Year
1 15.1 A Restoration of rain cuts 54.00 cum 101.00 5454.00

2 15.2.I Maintenance of earthen shoulder 300.00 sqm 62.00 18600.00


( stripping of excess soil)
3 15.3.I Repair of pot holes by removal of 0.00 sqm 6976.00 0.00
failed material and filling with
75mm BM
4 15.3.IV Maintenance of Bituminous surface 0.00 sqm 165.00 0.00
(Repair to pot holes and removal of
loose material)
5 15.7.I Maintenance of Hume pipe 4 no 1238.00 4952.00
culverts
6 15.9 Maintenance of Road signs 0.50 km 927.00 463.50

7 15.10.II Maintenance of RCC railing 0.76 m 148.00 112.48

8 15.11 Maintenance of 200 m stones and 1.00 km 326.00 326.00


Km stones
Sl No SOR 2016-17 Item of work Qntty Unit Rate Amount
Ref No.
9 15.12.I Cutting branches of trees from 20 no 64.00 1280.00
roadway
10 15.12.II Cutting of shrubs from roadway 40 no 4.00 160.00
11 15.12.III Trimming grass and weeds from 337.50 sqm 1.00 337.50
shoulder

12 15.13 White washing of parapet walls of 10.00 sqm 13.00 130.00


CD works
Total 31815.48
Say Rs. 31815.00
Sl No SOR 2016-17 Item of work Qntty Unit Rate Amount
Ref No.
For 3rd Year
1 15.1 A Restoration of rain cuts 63.00 cum 101.00 6363.00

2 15.2.I Maintenance of earthen shoulder 350.00 sqm 62.00 21700.00


( stripping of excess soil)
3 15.3.I Repair of pot holes by removal of 8.78 sqm 6976.00 61249.28
failed material and filling with
75mm BM
4 15.3.IV Maintenance of Bituminous surface 70.31 sqm 165.00 11601.15
(Repair to pot holes and removal of
loose material)
5 15.7.I Maintenance of Hume pipe 4 no 1238.00 4952.00
culverts
6 15.9 Maintenance of Road signs 0.50 km 927.00 463.50

7 15.10.II Maintenance of RCC railing 1.52 m 148.00 224.96

8 15.11 Maintenance of 200 m stones and 1.00 km 326.00 326.00


Km stones
9 15.12.I Cutting branches of trees from 20 no 64.00 1280.00
roadway
10 15.12.II Cutting of shrubs from roadway 40 no 4.00 160.00
11 15.12.III Trimming grass and weeds from 337.50 sqm 1.00 337.50
shoulder

12 15.13 White washing of parapet walls of 10.00 sqm 13.00 130.00


CD works

Total 108787.39
Say Rs. 108787.00
For 4th Year
1 15.1 A Restoration of rain cuts 72.00 cum 101.00 7272.00

2 15.2.I Maintenance of earthen shoulder 400.00 sqm 62.00 24800.00


(stripping of excess soil)
3 15.3.I Repair of pot holes by removal of 10.54 sqm 6976.00 73527.04
failed material and filling with
75mm BM
4 15.3.IV Maintenance of Bituminous surface 93.75 sqm 165.00 15468.75
(Repair to pot holes and removal of
loose material)
5 15.7.I Maintenance of Hume pipe 4 no 1238.00 4952.00
culverts
6 15.9 Maintenance of Road signs 0.50 km 927.00 463.50

7 15.10.II Maintenance of RCC railing 1.90 m 148.00 281.20

8 15.11 Maintenance of 200 m stones and 1.00 km 326.00 326.00


Km stones
9 15.12.I Cutting branches of trees from 20 no 64.00 1280.00
roadway
Sl No SOR 2016-17 Item of work Qntty Unit Rate Amount
Ref No.
10 15.12.II Cutting of shrubs from roadway 40 no 4.00 160.00
11 15.12.III Trimming grass and weeds from 337.50 sqm 1.00 337.50
shoulder

12 15.13 White washing of parapet walls of 10.00 sqm 13.00 130.00


CD works
Total 128997.99
Say Rs. 128998.00
Sl No SOR 2016-17 Item of work Qntty Unit Rate Amount
Ref No.
For 5th Year
1 15.1 A Restoration of rain cuts 81.00 cum 101.00 8181.00

2 15.2.I Maintenance of earthen shoulder 450.00 sqm 62.00 27900.00


( stripping of excess soil)
3 15.3.I Repair of pot holes by removal of 15.81 sqm 6976.00 110290.56
failed material and filling with
75mm BM
4 15.3.IV Maintenance of Bituminous surface 117.19 sqm 165.00 19336.35
(Repair to pot holes and removal of
loose material)
5 15.7.I Maintenance of Hume pipe 4 no 1238.00 4952.00
culverts
6 15.9 Maintenance of Road signs 0.50 km 927.00 463.50

7 15.10.II Maintenance of RCC railing 1.90 m 148.00 281.20

8 15.11 Maintenance of 200 m stones and 1.00 km 326.00 326.00


Km stones
9 15.12.I Cutting branches of trees from 20 no 64.00 1280.00
roadway
10 15.12.II Cutting of shrubs from roadway 40 no 4.00 160.00
11 15.12.III Trimming grass and weeds from 562.50 sqm 1.00 562.50
shoulder

12 15.13 White washing of parapet walls of 10.00 sqm 13.00 130.00


CD works
Total 173863.11
Say Rs. 173863.00
5 Years Total 471146.00
For 5th Year
1 15.1 A Restoration of rain cuts 81.00 cum 101.00 8181.00

2 15.2.I Maintenance of earthen shoulder 450.00 sqm 62.00 27900.00


( stripping of excess soil)
3 15.3.I Repair of pot holes by removal of 15.81 sqm 6976.00 110290.56
failed material and filling with
75mm BM
4 15.3.IV Maintenance of Bituminous surface 117.19 sqm 165.00 19336.35
(Repair to pot holes and removal of
loose material)
5 15.7.I Maintenance of Hume pipe 4 no 1238.00 4952.00
culverts
6 15.9 Maintenance of Road signs 0.50 km 927.00 463.50

7 15.10.II Maintenance of RCC railing 1.90 m 148.00 281.20

8 15.11 Maintenance of 200 m stones and 1.00 km 326.00 326.00


Km stones
9 15.12.I Cutting branches of trees from 20 no 64.00 1280.00
roadway
10 15.12.II Cutting of shrubs from roadway 40 no 4.00 160.00
Sl No SOR 2016-17 Item of work Qntty Unit Rate Amount
Ref No.
11 15.12.III Trimming grass and weeds from 562.50 sqm 1.00 562.50
shoulder

12 15.13 White washing of parapet walls of 10.00 sqm 13.00 130.00


CD works
Total 173863.11
Say Rs. 173863.00
5 Years Total 753796.00
4
N MANTRI GRAM SADAK YOJANA FOR 2016-17

Remarks

total 6% raincuts for 1st


year
total 10 % for 1st year

not required

not required

maintenance to be done
twice a year
maintenance to be done
once in 2 years
considering 2% requiring
maintenance

considering 12% of the


total area requiring grass
trimming

total 7.2% raincuts for 2nd


year
total 12 % for 1st year

not required

not required

maintenance to be done
twice a year
maintenance to be done
once in 2 years
considering 4% requiring
maintenance
Remarks

considering 15% of the


total area requiring grass
trimming
Remarks

total 8.4% raincuts for 3rd


year
total 14 % for 3rd year

total 2.5% requiring


maintenance for 3rd year

total 1.5% requiring


maintenance for 3rd year

maintenance to be done
twice a year
maintenance to be done
once in two years
considering 8% requiring
maintenance

considering 15% of the


total area requiring grass
trimming

total 9.6% raincuts for 1st


year
total 16 % for 4th year

total 3% requiring
maintenance for 4th year

total 2% requiring
maintenance for 4th year

maintenance to be done
twice a year
maintenance to be done
once in two years
considering 10% requiring
maintenance
Remarks

considering 15% of the


total area requiring grass
trimming
Remarks

total 10.8% raincuts for


1st year
total 18 % requiring
maintenance for 5th year
total 4.5 % requiring
maintenance for 5th year

total 2.5 % requiring


maintenance for 5th year
maintenance to be done
twice a year
maintenance to be done
once in two years
considering 10% requiring
maintenance

considering 25% of the


total area requiring grass
trimming

total 10.8% raincuts for


1st year
total 18 % requiring
maintenance for 5th year
total 4.5 % requiring
maintenance for 5th year

total 2.5 % requiring


maintenance for 5th year

maintenance to be done
twice a year
maintenance to be done
once in two years
considering 10% requiring
maintenance
Remarks

considering 25% of the


total area requiring grass
trimming