Marine Chemicals Production in Gujarat

This document provides details about Archean Chemical Industries' marine chemical project in Gujarat, India. It summarizes key steps in establishing the project from 2005 to present, including securing land rights, environmental clearances, validation activities, and funding. The current Phase 1 involves producing industrial salt, sulfate of potash (SOP), and liquid bromine using sea brine from the Rann of Kutch. The configuration includes a brine field, evaporation circuit, SOP and bromine plants, utilities, and infrastructure over 24,271 hectares of leased land.

Uploaded by

AKHIL BABU S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
362 views70 pages

Marine Chemicals Production in Gujarat

This document provides details about Archean Chemical Industries' marine chemical project in Gujarat, India. It summarizes key steps in establishing the project from 2005 to present, including securing land rights, environmental clearances, validation activities, and funding. The current Phase 1 involves producing industrial salt, sulfate of potash (SOP), and liquid bromine using sea brine from the Rann of Kutch. The configuration includes a brine field, evaporation circuit, SOP and bromine plants, utilities, and infrastructure over 24,271 hectares of leased land.

Uploaded by

AKHIL BABU S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 70

ARCHEAN GROUP

ARCHEAN CHEMICAL INDUSTRIES PRIVATE LIMITED

Marine Chemicals
From Brine at
Rann of Kutch in India
C G Sethuram
India - Gujarat

SITE
Gujarat
District Kutch
Satellite Image of Site
It all started…..

Month and Year Activity

Jan 2005 MOU with Government of Gujarat in the Vibrant Gujarat


Summit 2005 for production of Salt and Salt based
Chemicals
July 2006 Agreement for Licensing & Know How with CSMCRI,
Bhavnagar for SOP, MOP, MgO, Brominating Reagents-
Integrated patented process

Feb 2008 Allotment order from Government of Gujarat (GOG) for


Phase 1- 60000 acres of area

Mar-July 2008 Demonstration work at CSMCRI

July 2008 Lease agreement with GOG

Jan-Sept 2008 Brine field designs and construction planning


Few Initial Photos of Site

Approach Road Brine Channel

Salt Desert Top Salt Layer


It takes time…a long time !!!!

Month & Year Activity / Clearance


Feb 2010 Application to the Ministry for Environmental
Clearance of the Project
Mar-Dec 2010 Various studies and EIA as stipulated by the
Government in Terms of Reference
Jan-June 2011 Evaluation and site visits by Expert Committee,
MOEF,Delhi
Sept 2011 Environmental Clearance from MOEF, Delhi
Apr 2012 Consent to Establish the Plant from Government
of Gujarat
Some Help and Validations…

Month & Year Validation Activity


Nov 2008 Mr. David Butts and Mr. Guy Wilkins, Experts in
Marine Chemicals and Brine Field Development
–Visit site and provide guidance on Brine Fields
and Evaporation circuit
Feb 2009 After initial studies on GRK brine a team from
KUTec visits site and offers to associate for SOP
Feb 2009 DDPS-QVF offers to provide equipment and
technology for Bromine production
June 2009 Mr. Harry Ritchie , Expert in Salt production
visits site and provides guidance on Salt
July 2009 Courtesy KUTec visits to Potash plants in
Europe take place
Validations

Demonstration at CSMCRI (Mar 2008)

Discussion at CSMCRI Pilot plant


Validations

Testing Sub Soil Brine in Rann

Mr.Guy Wilkins (Solar Salt


Engineering) visit to site
Validations

Discussion at Weather Station


Mr David Butts (DSB International)

Lab experiment on Soil Quality


Analysis-Mr David Butts
Validations

Team KUTec at CSMCRI

Team K-Utec at site (Feb 2009)


Validations

Mr. Harry Ritchie at Brine Field


Construction area

Mr.Harry Ritchie at the Rann Brine


Channel (June 2009)
Money- The Tough Resource

 Till 2010 all project funding internally done from


Archean Group
 In 2010 Pre-Money valuation and Capital infusion
from Sojitz, Japan with minor equity participation
 By end 2010 Consortium of 6 Banks agree to
lend by providing term loans after a long and
detailed appraisal
 Project cost and Capacities get revised in 2012-
Revised Equity and Debt get secured
Basic Details of the Project Phase 1

Location Greater Rann of Kutch


Hajipir, Bhuj Taluk, Kutch District,
Gujarat, India
Total Area under 24271 Hectares (60000 Acres)
Lease
Brine Bed Area 16187 Hectares

Evaporation Circuit 7594 Hectares


Area
Plant Area 500 Hectares
Current Phase 1 Products & Capacities

Product Production Capacity (MTA)

Industrial Salt (NaCl) As per market demand

Sulphate of Potash 130000

Liquid Bromine 10500


Marine Chemicals Project Configuration

 Brine Field and Evaporation Circuit


 SOP Plant
 Liquid Bromine Plant
 CoGen Power Plant
 ISBL Utilities including Desalination Plant
 OSBL Facilities including Sea Water Intake
 Infrastructure
Overall Site Plan
Evaporation Circuit Layout
Satellite View - Site
Satellite View - Site
Salt Manufacturing from Sea brine
Sea Brine 6-10o Be 10-14o Be 14-17o Be 38-40-49o Be
3-3.5o Be CaCO3 Crystallization

I IV Magnesium
Chloride
Recovery

Mixed Salt
Pans
Salt Storage
Heaps 36 to 38 o Be

12-13o Be Gypsum 17-24o Be


Crystallization starts Pre Crystallizer
Sels Mixt
II III Area
Pans
34 to 36 o Be

Bittern Reservoir

Crude Salt
Pans
Most Gypsum
separates 29 to 34 o Be

Reservoir Condensor Crystalliser


Area Area Area
24-25o Be 25.5 -29o Be
Feed Preparation

FIELD – POND SEQUENCE

25 deg.Be’ 29 deg.Be’ 32 deg.Be’ 36 deg.Be’

CRY CIRCUIT CIRCUIT CRY


Channels
in Salt bed
Crude Salts Crude Magnesium
Sulphate Salts Kainite
Salt - NaCl

End Bittern
for Bromine
MgCl2
Sea water GRK Brine
BISCHOFITE Constituents
(w/v%) (w/v%)
100
(KCl.MgCl2.6H2O) CARNALLITE Na 1.05 10.25
KIESERITE 90
K 0.03 0.38
80
MgSO4.6H2O
70 Mg 0.12 1.15
(KCl.MgSO4.3H2O) KAINITE
60 Cl 1.89 18.46
50
LEONITE
SO4 0.26 1.64
40
MgSO4.7H2O 6
5 3
(K2.SO4.MgSO4.3H2O) 3
SCHOENITE 0 1 Phase diagram of oceanic salt system at 25oC
(concentrations expressed in mol / 1000 moles H2O).7
2 20
SYLVITE Compositions of Dead sea brine (●), oceanic bittern
[before (▲) and after (Δ) desulfatation] and SEL
ASRTAKANITE 10
[before (■) and after (□) desulfatation] are also
GLASERITE
MgSO4 K2Cl2 shown. Compositions are provided in Table 1 for
4 30 20 10 0 10 2 Dead sea brine (1), SEL (2), desulfated SEL (3),
30
0 10 0 oceanic bittern of sp gr 1.263 (5) and desulfated
THENARDITE oceanic bittern of sp gr 1.221 (6).

Na2.SO4
Janecke Diagram – CSMCRI’s data
K2SO4
Crystallizer- C1
Crystallizer- KTMS
Pumping Station 1
Pumping Station 1
Pumping Station 1
Pumping Station 2
Pumping Station 3
Pumping Station 4
Pumping Station 5
Pumping Station 5
Rain- The spoiler !!!

Year Rainfall in mm per year

Prior to 2008 Average < 150

2009 > 300

2010 > 600

2011 > 900

Till Date 2012 > 300


Gates in Crystallizer
Gates in Crystallizer
Construction of Cause Way
Salt in C1 Crystallizer-Already formed
KTMS Crystallizer
Weather Station
Temporary on site Laboratory
Engineering and Technology

Product Party Place Details


Project CSMCRI India SOP, MgO, Green
Concept Bromine and Derivatives
Brine Field Archean India Phase 1 – 60000 acres

SOP KUTec Germany 20 TPH

Liquid DDPS-QVF Germany 10500 MTA


Bromine
Detail HDO India Plant
Engineering Technologies
Typical Salt Washery Scheme
SALT STOCK PILE

HOPPER-1

CLARIFIER-1 CONVEYOR-3
RAW SALT FEED

METAL SCREW
CONVEYOR
CONVEYOR-1 CONVEYOR-2

CONVEYOR-4
CLARIFIER-2

HOPPER-2

SALT STOCK PILE

SINGLE TRAIN CAPACITY - 200 TPH


NUMBER OF TRAINS - 3 TRAINS
TOTAL CAPACITY PER DAY - 600 TPH = 12000 TPD
TOTAL CAPACIITY PER YEAR . 12000 X 250 = 3 MILLION MTA
Plant Layout
Plant Layout
Chemistry of Production of SOP

KTMS + MgSO4 2KCl.MgSO4.2.75 H2O


Synthetic Kainite

2KCl.MgSO4.3H2O + Cold ML + SW K2SO4.MgSO4.6H2O + EL


Synthetic Kainite Primary Schoenite

K2SO4.MgSO4.6H2O + K2SO4.MgSO4.6H2O + SW 2K2SO4 + Hot ML


Primary Schoenite Secondary Schoenite SOP

Hot ML K2SO4.MgSO4.6H2O + Cold ML


Secondary Schoenite

KTMS: Kainite type Mixed Salt, ML:Mother liquor, SW: Sea Water, EL: End Liquor Containing MgCl2
SOP Plant-Rough 3 D Layout

SOP
Kainite
Hoppers
SOP
Crushers Plant
Epsomite

Utilities Thickeners
/ Reactors
Tank
farm
Chemistry of Production of Bromine

Cl2

MgBr2 MgCl2 + Br2


Bromine Plant-Rough 3 D Layout
Key Vendors-Too much of Germany !! ??

Equipment Vendor
Centrifuges Siebtechnik

Cooling Crystallizers Ebner

Dryer Siebtechnik

Glass Columns DDPS-QVF

Process Control System Siemens


Some Other Key Vendors

Equipment or Service Vendor

Harvesters for Salt and Kainite RovDurant Engineering,


South Africa
CoGen Plant – Consultancy for EPC Snyder Energo, India

CoGen Plant-Boilers Cethar Vessels, India

CoGen Plant- Steam Turbine Qingdao, China


through APT, India
CoGen Plant-Balance of Plant and APT, India
Erection and Commissioning
Piling and Ground Improvement Keller Engineering , India
(Parent Company from
Germany !!)
Harvester
Some more Tests….. With Kainite and SOP

More Trials at KUTec in 2012

Compaction & Granulation Trials


at Koppern, Germany in 2012
Infrastructure

 Existing Own Office at Gandhidham about 4 hours


from the site used for Project activities
 Office cum Residential Facility being built at
Nakhatrana about 75 minutes from the site
 Shift Facilities will be built at site
 Company Transport to site -To and Fro
 Doctor and Medical Facilities at site
Nakhatrana Site Office being built……
Nakhatrana Accommodation getting ready…
Key Utilities

 CoGen Power Plant - Coal Based - 10 MWH


Operating Capacity
 Desalination Plant- Sea Water RO-10 MLD
Capacity
 Process Air Compressors
 VAM Chilling Plant
 Full Fledged Workshop for Maintenance
Sea Water Feed Scheme
Lakhpat Fort near Sea Water Intake Point

North of Lakhpat Fort will be the Pipeline


Current Approach Road to Site
Temporary Camp Area
Temporary Container Camp Offices
Construction Progress-Boiler Area
Construction Progress-Bromine Plant Area
Construction Progress-ESP Area
Construction Progress- Storage Area
Archean – KUTec
It all started then….and…Continues….
Thank you

Corporate office: 5th Floor, Tower 2 - TVH Beliciaa Towers, 94 MRC Nagar, Chennai 600 028, Tamil Nadu, India
Tel: 91.44.4303 3444, Fax: 91.44.4303 3555 / 777
www.archeangroup.com, sethuram@archeangroup.com