Construction Material Rates

The document provides rates for three types of road construction work: 1. Granular sub-base work at a rate of 152 rupees per square meter. 2. Wetmix macadam work at a rate of 196 rupees per square meter. 3. Levelling charges for wetmix macadam or granular sub-base work at 52 rupees per square meter.

Uploaded by

kamalgk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
2K views1 page

Construction Material Rates

The document provides rates for three types of road construction work: 1. Granular sub-base work at a rate of 152 rupees per square meter. 2. Wetmix macadam work at a rate of 196 rupees per square meter. 3. Levelling charges for wetmix macadam or granular sub-base work at 52 rupees per square meter.

Uploaded by

kamalgk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

RATE FOR GSB/WETMIX WORK

Sl.No Specification Rate Unit

GRANULAR SUB BASE - GRADE -I - ( 100 MM thick )


Providing Granular sub base using Grade -1 materials as
per clause 400-1 of MORTH with minimum CBR 30 Spreading in Uniform
1 Layers with Motor Grader on Prepared Surface, mix in by Place Method at 152.00 Sq.Mtr
OMC and compacting with Vibratory Roller tro Achieve the Disred Density
including all Labourcharges etc.., Complete as Per technical Specification and
As directed by the departmental Officers MORTH - IV No, 111,112,401,900.

WETMIX MECCADAM - ( 100 MM thick )


Providing, laying spreading and compacting Wet Mix
2 Macadam with clean, crushed, graded aggregates and granular material and 196.00 Sq.Mtr
finished in accordance with the requirements of the specifications and
thickness as per approved plans or as directed by the engineer.

LEVELLING CHARGES
Levelling,compacting and finishing the WETMIX MECCADAM / GSB to
uniform thickness of 100mm with mechanical paver to the specified grades
and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic
Roller to the required density etc., including labour for attending to paver to
3 site etc., including hire charges and fuel charges for Paver Finisher / paver 52.00 Sq.Mtr
finisher, Vibratory / Pneumatic roller and all other tools and plant required,
including fuel and all other incidental charges etc., complete as per
specification using CMP
as per Morth rev 5.