This letter from A.K. Shivhare Infrastructure Pvt. Ltd. informs M/S L.N. Malviya Infra Projects Pvt. Ltd that the third milestone of 72.69% physical and 72.72% financial progress has been achieved for the Khilchipur-Jirapur Road project. The letter provides contract and project details, notes the milestone was achieved on May 3rd, and includes a progress report as an attachment. A copy is also sent to the Resident Engineer for L.N. Malviya infra Projects Pvt. Ltd.

Uploaded by

TL SJP
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
286 views1 page

7)

This letter from A.K. Shivhare Infrastructure Pvt. Ltd. informs M/S L.N. Malviya Infra Projects Pvt. Ltd that the third milestone of 72.69% physical and 72.72% financial progress has been achieved for the Khilchipur-Jirapur Road project. The letter provides contract and project details, notes the milestone was achieved on May 3rd, and includes a progress report as an attachment. A copy is also sent to the Resident Engineer for L.N. Malviya infra Projects Pvt. Ltd.

Uploaded by

TL SJP
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

A.K.S hivhare Infrastructure Pvt.Ltd .

Branch Office. Railway Station Road,BIAORA Distt. Rajgarh (M.P)


Head Office: 16, Eden Garden ChunaBhatti, Kolar Road,Bhopal (M.P.)
Tel:-:07374(0)230085, 230086Fax:230086, Mob.9425037549, E-mail-akshivhare@rediffmail.com

Ref No: AKSIPL/KJP/PM/40 Date : 04.05.2019

To,
The Team Leader,
M/S L.N.Malviya Infra Projects Pvt.Ltd
A/381, Siddhnath Swapn City,
Shujalpur

Subject: Rehabilitation & Up gradation of Intermediate lane flexible pavement to 2 lane with
paved Shoulders Rigid pavement on KHILCHIPUR - JIRAPUR Road from Km 5.500 to
Km 22.190 on Khilchipur to Jirapur section of newly declared NH -752 B in the state of
Madhya Pradesh on EPC mode
Contract Agreement no. :-04/2017-2018, Dated:26/02/2018

“Regarding Achieved of 3rd Milestone”

Dear Sir,

We are informing you that, we have achieved the 3rd milestone (70.0% Progress -405 day – dated
07.05.2019) of Khilchipur-Jirapur Road project on dated 03rd may 2019. The Physical progress of
project is 72.69% and financial progress is 72.72% (Progress report attached with this letter)
This is for your kind information and necessary action please.
Thanking you

Yours faithfully,

For A. K. Shivhare infrastructure Pvt ltd

Anshu Kumar Sharma


(Project Manager)

Enclosure: - Progress Report

Copy to: -

1. The Resident Engineer, L. N. Malviya infra Projects Pvt. Ltd., for information requested
and necessary action please.