0% found this document useful (0 votes)
65 views1 page

Edificio Centro de Operaciones: LEED BD+C: New Construction (v2009)

Scorecard de la Certificación LEED del Edificio de Centro de Operaciones del Banco Agrícola de El Salvador

Uploaded by

SleivaRastovich
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views1 page

Edificio Centro de Operaciones: LEED BD+C: New Construction (v2009)

Scorecard de la Certificación LEED del Edificio de Centro de Operaciones del Banco Agrícola de El Salvador

Uploaded by

SleivaRastovich
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1000087197, San Salvador,

Edificio Centro de Operaciones


LEED BD+C: New Construction (v2009) GOLD, AWARDED AUG 2017

SUSTAINABLE SITES AWARDED: 19 / 26 MATERIAL & RESOURCES CONTINUED

SSp1 Construction activity pollution prevention REQUIRED MRc5 Regional materials 2/2
SSc1 Site selection 1/1 MRc6 Rapidly renewable materials 0/1
SSc2 Development density and community connectivity 5/5 MRc7 Certified wood 0/1
SSc3 Brownfield redevelopment 0/1
SSc4.1 Alternative transportation - public transportation access 6/6 INDOOR ENVIRONMENTAL QUALITY AWARDED: 2 / 15
SSc4.2 Alternative transportation - bicycle storage and changing rooms 0/1
EQp1 Minimum IAQ performance REQUIRED
SSc4.3 Alternative transportation - low-emitting and fuel-efficient vehicles 3/3
EQp2 Environmental Tobacco Smoke (ETS) control REQUIRED
SSc4.4 Alternative transportation - parking capacity 2/2
EQc1 Outdoor air delivery monitoring 0/1
SSc5.1 Site development - protect or restore habitat 0/1
EQc2 Increased ventilation 0/1
SSc5.2 Site development - maximize open space 0/1
EQc3.1 Construction IAQ Mgmt plan - during construction 1/1
SSc6.1 Stormwater design - quantity control 0/1
EQc3.2 Construction IAQ Mgmt plan - before occupancy 0/1
SSc6.2 Stormwater design - quality control 0/1
EQc4.1 Low-emitting materials - adhesives and sealants 0/1
SSc7.1 Heat island effect - nonroof 1/1
EQc4.2 Low-emitting materials - paints and coatings 0/1
SSc7.2 Heat island effect - roof 1/1
EQc4.3 Low-emitting materials - flooring systems 0/1
SSc8 Light pollution reduction 0/1
EQc4.4 Low-emitting materials - composite wood and agrifiber products 0/1
EQc5 Indoor chemical and pollutant source control 0/1
WATER EFFICIENCY AWARDED: 6 / 10 EQc6.1 Controllability of systems - lighting 0/1
WEp1 Water use reduction REQUIRED EQc6.2 Controllability of systems - thermal comfort 1/1
WEc1 Water efficient landscaping 2/4 EQc7.1 Thermal comfort - design 0/1
WEc2 Innovative wastewater technologies 0/2 EQc7.2 Thermal comfort - verification 0/1
WEc3 Water use reduction 4/4 EQc8.1 Daylight and views - daylight 0/1
EQc8.2 Daylight and views - views 0/1
ENERGY & ATMOSPHERE AWARDED: 27 / 35
EAp1 Fundamental commissioning of building energy systems REQUIRED INNOVATION AWARDED: 4 / 6
EAp2 Minimum energy performance REQUIRED IDc1 Innovation in design 3/5
EAp3 Fundamental refrigerant Mgmt REQUIRED IDc2 LEED Accredited Professional 1/1
EAc1 Optimize energy performance 13 / 19
EAc2 On-site renewable energy 7/7 REGIONAL PRIORITY AWARDED: 2 / 4
EAc3 Enhanced commissioning 2/2
SSc1 Site selection 1/1
EAc4 Enhanced refrigerant Mgmt 2/2
SSc7.2 Heat island effect - roof 1/1
EAc5 Measurement and verification 3/3
EAc6 Green power 0/2
TOTAL 63 / 110

MATERIAL & RESOURCES AWARDED: 3 / 14


MRp1 Storage and collection of recyclables REQUIRED
40-49 Points 50-59 Points 60-79 Points 80+ Points
MRc1.1 Building reuse - maintain existing walls, floors and roof 0/3
CERTIFIED SILVER GOLD PLATINUM
MRc1.2 Building reuse - maintain interior nonstructural elements 0/1
MRc2 Construction waste Mgmt 0/2
MRc3 Materials reuse 0/2
MRc4 Recycled content 1/2