0% found this document useful (0 votes)
70 views1 page

Meeting Notes 1

The meeting discussed assigning roles and responsibilities to students for an upcoming production. Each person was given a different role based on what they were best suited to do. Important dates of June 10th and 12th were set as rehearsal days to prepare everyone for carrying out their roles, with the 12th being the actual production day.

Uploaded by

api-413228826
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views1 page

Meeting Notes 1

The meeting discussed assigning roles and responsibilities to students for an upcoming production. Each person was given a different role based on what they were best suited to do. Important dates of June 10th and 12th were set as rehearsal days to prepare everyone for carrying out their roles, with the 12th being the actual production day.

Uploaded by

api-413228826
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Meeting Notes

Date: 22/05/19 Time: 9:45am


Place: 1116
Name: Paris Beszant

Issues Discussed Person Responsible For Action


In the first meeting we had we Each person is assigned a
discussed everyone’s roles and different role. Each one is
who was going to be doing what different and everyone does a
in the final production day. We all different role on the day.
agreed on the roles that everyone
was best suited to. Some students
weren’t in but got assigned roles
which the class felt they would do
best on the day.

Important Dates Two main days when


10th June and 12th June everyone comes in.
These 2 dates are a run through
of the production which is on
Monday at 2 o’clock so
everyone is used to their roles
and is able to carry them out on
the day. The 12th is the actual
production and when the
interview is going to happen.

You might also like