Iris Inspection Report: Tube Mapping

The document is an inspection report of a hydrogen cooler with tag number E-610 B. It maps the condition of each of the 133 tubes, with none being rejected. The tubes are mapped out in a grid with numbers indicating the assessed condition of each tube ranging from 9 to 20%. The inspection was performed by PT. SUCOFINDO and reviewed and approved by PT. SULFINDO ADI USAHA.

Uploaded by

Arief Wisnu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
88 views10 pages

Iris Inspection Report: Tube Mapping

The document is an inspection report of a hydrogen cooler with tag number E-610 B. It maps the condition of each of the 133 tubes, with none being rejected. The tubes are mapped out in a grid with numbers indicating the assessed condition of each tube ranging from 9 to 20%. The inspection was performed by PT. SUCOFINDO and reviewed and approved by PT. SULFINDO ADI USAHA.

Uploaded by

Arief Wisnu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

IRIS INSPECTION REPORT

TUBE MAPPING

HYDROGEN COOLER TAG. NO. E-610 B


NO REJECTED TUBES
Tubes
R
o Top of Vessel
w
s

1 Row 1, Tube 1 9
2 12
3 13
4 14
5 15
6 15
7 17
8 18
9 19
10 20
11 17
12 19 14
13 19 15
14 18 14
15 17 13
16 16 12
17 15 9
14
13
9
9

Total Accepted Tubes : 133 Rejected Tubes : 0.00

Legend : 0 % - 20 % 41 % - 60 % Holle (100%)


21 % - 40 % 61 % - 80 %

Inspected by, Reviewed by, Approved by,


PT. SUCOFINDO PT. SULFINDO ADI USAHA
TOHIRIN
IRIS Inspector (ASNT Lv. II)
IRIS INSPECTION REPORT
TUBE MAPPING

HYDROGEN COOLER TAG. NO. E-610 B


NO REJECTED TUBES
Tubes
R
o Top of Vessel
w
s

1 Row 1, Tube 1 9
2 12
3 13
4 14
5 15
6 14
7 17
8 18
9 17
10 18
11 17
12 14
13 15
14 14
15 13
16 12
17 9

Total Accepted Tubes : 241 Rejected Tubes : 0.00

Legend : 0%-7% 21 % - 40 % Holle (100%)


8 % - 20 % 41 % - 60 % 61 % - 80 %

Inspected by, Reviewed by, Approved by,


PT. SUCOFINDO PT. SULFINDO ADI USAHA
TOHIRIN
IRIS Inspector (ASNT Lv. II)
IRIS INSPECTION REPORT
TUBE MAPPING

HYDROGEN COOLER TAG. NO. E-610 A


NO REJECTED TUBES
Tubes
R
o
w
s Top of Vessel

1 Row 1, Tube 1 9
2 12
3 15
4 16
5 17
6 18
7 17
8 18
9 17
10 18
11 17
12 18
13 17
14 18
15 17
16 16
17 15
18 12
19 7

Total Accepted Tubes : 294 Rejected Tubes : 0.00

Legend : 0%-7% 21 % - 40 % Holle (100%)


8 % - 20 % 41 % - 60 % 61 % - 80 %

Inspected by, Reviewed by, Approved by,


PT. SUCOFINDO PT. SULFINDO ADI USAHA

TOHIRIN
IRIS Inspector (ASNT Lv. II)
IRIS INSPECTION REPORT
TUBE MAPPING

HEAT EXCHANGER TAG. NO. E-350


NO REJECTED TU
Tubes
R
o
w Top of Vessel
s
1 Row 1, Tube 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

Total Accepted Tubes : 900 Rejected Tubes : 0.00


Legend : 0%-7% 21 % - 40 % Holle (100%)
8 % - 20 % 41 % - 60 % 61 % - 80 %

Inspected by, Reviewed by, Approved by


PT. SUCOFINDO PT. SULFINDO ADI

TOHIRIN
IRIS Inspector (ASNT Lv. II)
NO REJECTED TUBES

8
14
17
18
19
24
25
26
27
28
27
30
31
30
31
32
31
32

32
31
32

31

30
31
30
27
28
27
26
25
24
19
18
17
14
8
Approved by,
ULFINDO ADI USAHA