Moisture Correction

This document outlines moisture content adjustments that need to be made for concrete batching. It provides the design mix quantities for 1 cubic meter of concrete, the actual batched quantities, moisture measurements, and corrected batch quantities accounting for moisture. Key information includes the concrete grade, mix design, measured moisture percentage, water absorption rate, moisture adjustment percentage, quantity increases or decreases needed, and final corrected batch quantities.

Uploaded by

Raja Ramar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views4 pages

Moisture Correction

This document outlines moisture content adjustments that need to be made for concrete batching. It provides the design mix quantities for 1 cubic meter of concrete, the actual batched quantities, moisture measurements, and corrected batch quantities accounting for moisture. Key information includes the concrete grade, mix design, measured moisture percentage, water absorption rate, moisture adjustment percentage, quantity increases or decreases needed, and final corrected batch quantities.

Uploaded by

Raja Ramar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

MOISTURE CONTENT ADJUSTMENT AT

BATCHING PLANT

Project: :
Client:
Ref. No.
Date: Time:

Concrete Grade:
1.Percentage of Misture found:

Mix for 1m3 in site condition (Kg/m3)(As per design mix):

Coarse Aggregate Fine Aggregate


Cement
20mm 12.5mm Natural Sand Crushed Sand

2.Executed qty of batching as per capacity:


Cement: 20mm: 12.5mm: Sand:

Water: Admixture:

Mix for…0.5 m3 in site condition (Kg/m3):

Coarse Aggregate Fine Aggregate


Cement
20mm 12.5mm Natural Sand Crushed Sand

Water absorption (%), A

Moisture content (%), B

Moisture adjustment
(%), C=B-A
Increase / Decrease due
to moisture adjustment
(Kg)

Corrected batch quantity


(Kg)
Remarks:

Tested by : URCC(QC) Checked by : CONSULTANT

Name : Name:
Sign.:…………………………… Sign.:…………………………………

Date : Date :
Date

Water Admixture

Water Admixture
Surveillance By: CLIENT

Name: ……………………………………………………
Sign.:…………………………………

Date :………………………………….