Recopilacion de Información 1 Day? Wed 4/17/19 Wed 4/17/19

This document contains a project schedule with 13 tasks related to collecting and validating information about an oil well. The tasks include gathering historical drilling, completion, production and reservoir pressure data; reviewing geophysical logs, pressure-volume-temperature reports, and gyroscopic surveys; creating maps; and assessing the current mechanical condition and surface facilities. The total duration is estimated to be 2.5 days starting on April 17th, 2019.

Uploaded by

mnoriegal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views2 pages

Recopilacion de Información 1 Day? Wed 4/17/19 Wed 4/17/19

This document contains a project schedule with 13 tasks related to collecting and validating information about an oil well. The tasks include gathering historical drilling, completion, production and reservoir pressure data; reviewing geophysical logs, pressure-volume-temperature reports, and gyroscopic surveys; creating maps; and assessing the current mechanical condition and surface facilities. The total duration is estimated to be 2.5 days starting on April 17th, 2019.

Uploaded by

mnoriegal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

ID Task Task Name Duration Start Finish Predecessors Resource Apr

Names
14, '19
Mode M T W T F
1 Recopilacion de 1 day? Wed Wed
información 4/17/19 4/17/19
2 Historia de 0.5 days
perforacion y
3 terminación
Historial de 1 day
Intervenciones
4 Presiones (RPFC, RPFF)
1 day

5 Historial de producción
1 day

6 Registros geofisicos1 day

7 PVT del campo 1 day

8 Registros 1 day
giroscopico
9 (Survey)
Mapas geologicos 1 day

10 Estado mecanico
actual
11 Levantamiento de
información de las
condiciones
superficiales del
12 pozo de datos
Validacion

Task Inactive Summary External Tasks

Split Manual Task External Milestone

Milestone Duration-only Deadline


Project: Project1
Summary Manual Summary Rollup Progress
Date: Wed 4/17/19
Project Summary Manual Summary Manual Progress

Inactive Task Start-only

Inactive Milestone Finish-only

Page 1
ID Task Task Name Duration Start Finish Predecessors Resource Apr
Names
14, '19
Mode M T W T F
13 Base de datos
(presión y
producción)

Task Inactive Summary External Tasks

Split Manual Task External Milestone

Milestone Duration-only Deadline


Project: Project1
Summary Manual Summary Rollup Progress
Date: Wed 4/17/19
Project Summary Manual Summary Manual Progress

Inactive Task Start-only

Inactive Milestone Finish-only

Page 2

You might also like