PAT Page

This document outlines a preliminary acceptance test procedure for 3G+4G base station subsystem equipment and services. It includes signatures from representatives of the vendor and mobile network operator approving the test at a site with ID 4796. Team leads from the rollout and field operations teams also sign along with the 3G project manager and field operations manager to authorize the test.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
92 views1 page

PAT Page

This document outlines a preliminary acceptance test procedure for 3G+4G base station subsystem equipment and services. It includes signatures from representatives of the vendor and mobile network operator approving the test at a site with ID 4796. Team leads from the rollout and field operations teams also sign along with the 3G project manager and field operations manager to authorize the test.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

3G+4G-Rollout

3G+4G BSS Equipment and Services Preliminary Acceptance Test


Procedure

Site ID : 4796 By:

PRELIMINARY ACCEPTANCE TEST

Approved by:

CMPak CMPak
Team Lead Rollout: Team Lead FOPS:
Name: Name:

Sign: Sign:

Date: Date:

CMPak
3G Project Manager: Fops Manager:
Authorized Person: Authorized Person:
Name: Name:

Sign: Sign:

Date: Date:

Vendor Representative Signatures & Date

CMPak Representative(s) Signatures & Date

Confidential 1 of 1