HIRARC (Rev:_01_Year:_2018___)
PROJECT NAME: LARAK DEVELOPMENT PROJECT
ACTIVITY OR PROCESS CRITICAL / COMPLEX LIFTING Date :
Department (HIRARC owner): LARAK DEVELOPMENT PROJECT HIRARC No :
Location: SECTOR 1
Task/Process : LIFTING OF LARAK TOP PANEL
Specific Work area: LARAK Jacket Construction Area
Flammable materials Elevated work platform √ Slippery surface Moving parts Reduced visibility
Combustible materials Potential for difficult rescue Manual handling √ Unauthorized persons √ Communication √
Difficult entry/exit
Hazardous substances Noise - plant & equipment Air emissions - dust, fumes Lighting
✘ ✘ ✘ ✘ ✘ ✘
Penyediaan alatan
mengangkat seperti kren, gear site verification / suggestion on particular site verification / audit
mengangkat, wayar sling dan RISK date by PE, Supervisor or Foreman by HSE
shackles. LIKELIH SEVERI
Specific Activity Hazard Identified Existing Control Measures OOD / TY/
RATING Recommendation penilaian / cadangan di tapak kerja pada penilaian / audit oleh
No H/M/L/ tarikh oleh PE, Supervisor atau Foreman HSE
Aktitivi yang khusus Hazad yang ditemui Langkah keselamatan yang sedia ada KEBARAN KETERU
PENILAIAN
Saranan langkah keselamatan
GKALIAN KAN
RISIKO
2. Obstruction with fabrication equipment To ensure crane pathway is clear and no
e.g. welding machine, gases rack or other obstruction from any object before lifting activity.
structure, scaffolding, etc. RIGGER
Halangan dari alatan seperti mesin Memastikan laluan kren agar tidak terhalang B 2 RIGGER FOREMAN
welding, rak gas, dan struktur lain. oleh mana-mana objek yang boleh LIFTING SUPERVISOR
mengganggu semasa aktiviti mengangkat
dijalankan.
3. Pinch Point. Those rigger who are involved to have complete
Kecederaan pada jari. PPE before start the activity.impact resistance
glove
RIGGER
Rigger yang terlibat dalam aktiviti ini hendaklah B 2 RIGGER FOREMAN
memakai peralatan perlindungan yang lengkap. LIFTING SUPERVISOR
4. Unfit Crane Operator Crane Operator to do Drug and Alcohol Test prior
Kren Operator tidak layak to Lifting Activity
Performing the lifting and manuevering of load (pick and carry) from initial position onto final position
Lifting, manuevering and final 1-Working under suspended load Temporary support to be removed (that obstructed For primary temporary support (4 nos), pre-rig before pulling (using
positioning activity of load (Top Bekerja di bawah beban tergantung crane path) prior to lifting activity commenced forklift) shall be done
Panel from temporary support
onto main support using 4 units Support sementara perlu dialihkan (yang Pre-rig perlu dilakukan untuk mengalih (menggunakan forklift)
of 400T and 1 units of 1600T menggangu laluan kren) sebelum aktiviti support sementara (4 unit)
Cranes) mengangkat dijalankan
3 2. Communication Failure. Toolbox & 4 point check briefing shall be conducted Radio communication should be established to dedicated radio
Aktivity mengangkat,
membawa dan "positioning" Komunikasi gagal. before start the lifting activity. channel 4
beban (Top Panel daripada RIGGER
support sementara kepada Melakukan "Toolbox & 4 Point Check" sebelum Komunikasi menggunakan radio dengan menggunakan RIGGER FOREMAN
support utama menggunakan aktivity dijalankan. B 4 saluran yang telah ditetapkan channel 4. LIFTING SUPERVISOR
4 unit 400T Kren dan 1 Unit RIGGING ENGINEER
1600T Kren HSE
4. Crane breakdown. Ensure the cranes are inspected and accepted as Inspection checklist to be complete, PMA should be valid.
Kren rosak. per inspection check sheet.
Senarai pemeriksaan harus lengkap, PMA harus disahkan . CRANE OPERATOR
Pastikan kren telah diperiksa sebelum aktiviti B 4
LIFTING SUPERVISOR
mengangkat dijalankan.
site verification / suggestion on particular site verification / audit
RISK date by PE, Supervisor or Foreman by HSE
LIKELIH SEVERI
Specific Activity Hazard Identified Existing Control Measures OOD / TY/
RATING Recommendation penilaian / cadangan di tapak kerja pada penilaian / audit oleh
No H/M/L/ tarikh oleh PE, Supervisor atau Foreman HSE
Aktitivi yang khusus Hazad yang ditemui Langkah keselamatan yang sedia ada KEBARAN KETERU
PENILAIAN
Saranan langkah keselamatan
GKALIAN KAN
RISIKO
5. Working under suspended load Only authorized person "rigging team" are allowed Sound communication shall be established (radio communication)
Bekerja di bawah beban tergantung. to work under suspended load channel 4 RIGGER
RIGGER FOREMAN
Hanya personel yang berkenaan "rigging team" B 4 Komunikasi yang baik harus dikenalpasti (komunikasi radio) LIFTING SUPERVISOR
dibenarkan bekerja di bawah suspended load. saluran 4 RIGGING ENGINEER
6. Load Discrepancy Analysis vs Actual Test Lift to be conducted prior to Actual Lift, load to Personel from Engineering shall present at site during lifting activity to
Perbezaan berat beban Analisis vs be lifted at minimum height and reading of load acknowledge and approve decision made by Rigging Team to mitigate
Sebenar from Crane LMI shall be established. the Load Discrepency (if any)
RIGGING ENGINEER
"Test Lift" perlu dilakukan sebelum "Actual B 4 Wakil dari Engineering perlu berada di site ketika aktiviti lifting LIFTING SUPERVISOR
Lift", beban diangkat pada ketinggian minima untuk mengesahkan keputusan yang dilakukan oleh Rigging Team ENGINEERING
dan bacaan beban dari LMI Kren harus bagi menangani masalah Perbezaan Beban (jika ada)
dikenalpasti
7. Load Levellness Analysis vs Actual Test Lift to be conducted prior to Actual Lift, load to The load shall be set back to initial position and rigging arrangement
Perbezaan level Analisi vs Sebenar be lifted at minimum height and levelnes should be (add/remove shackles) shall be adjusted based on actual load
established. levellness (if any)
LIFTING SUPERVISOR
"Test Lift" perlu dilakukan sebelum "Actual B 4 Beban dikembalikan ke kedudukan asal dan "rigging arrangment" RIGGING FOREMAN
Lift", beban diangkat pada ketinggian minima (menambah / mengurangkan shackle) dilakukan berdasarkan RIGGING ENGINEER
dan levellness beban dikenalpasti keadaan levellness sebenar
8. Uneven ground may cause unbalanced To ensure sufficient soil bearing capacity at lifting To put steel plate underneath crawler crane track if the soil bearing
condition to the crane during lifting area and determine the levelness of ground to insufficent / soft spot / water ponding.
operation. ensure stability of crane while lifting taken placed. RIGGER
Keadaan permukaan tanah yang tidak Sediakan / gunakan plat besi pada trek kren semasa bekerja di RIGGER FOREMAN
rata mengakibatkan kren tidak stabil Semak dan kenalpasti keadaan kekuatan tanah B 4 kawasan yang tidak rata/ kawsan lopak air atau permukaan tanah LIFTING SUPERVISOR
semasa bekerja mengangkat berdasarkan soil bearing data dan periksa yang lembut. RIGGING ENGINEER
permukaan tanah supaya sesuai dengan kerja
mengangkat
10. Unstable load. a) To ensure the wire slings get the tension first Hold for 2 minutes after lifting at minimum height above ground to
Beban tidak stabil. and trial lifting to check the COG (level of the load) ensure load is stable.
prior to start. RIGGER
Berhenti 2 minit selepas mengangkat beban tinggi minima dari RIGGER FOREMAN
Melakukan percubaan mengangkat dahulu B 3 bawah, untuk memastikan beban stabil. CRANE OPERATOR
beban, untuk melihat kestabilan beban sebelum LIFTING SUPERVISOR
aktiviti diteruskan.
11. Slewing too fast Crane operator need to follow instruction from Load slew at minimum speed.
"Slewing" teralu laju Supervisor / Signalman.
Pergerakan beban pada kelajuan yang minimum.
Kren operator perlu mengikut arahan dari
Rigging Supervisor/signalman. SIGNALMAN
B 3 CRANE OPERATOR
LIFTING SUPERVISOR
12. Traveling too fast. Crane operator need to follow instruction from Load travel at the minimum speed.
Bergerak terlalu laju. Supervisor / Signalman.
Perjalanan & kelajuan beban dalam kelajuan yang minimum.
Kren operator perlu mengikut arahan dari
Rigging Supervisor/signalman. SIGNALMAN
B 3 CRANE OPERATOR
LIFTING SUPERVISOR
15. Bad weather. Check weather forecast first before perform the Shall worst weather (lightning) during load lift/suspend, all operation
Cuaca buruk. lifting activity. shall stop and Crane Safety Pawls (drum lock) shall be activated.
Pastikan aktiviti mengangkat tidak dijalankan Sekiranya keadaan ribut petir ketika beban sedang diangkat, CRANE OPERATOR
semasa cuaca buruk. Periksa "Weather B 2 semua operasi haruslah dihentikan dan Crane Safety Pawls harus LIFTING SUPERVISOR
Forecast" terlebih dahulu sebelum memulakan digunakan. RIGGING ENGINEER
aktiviti ini.
4 Dismantle the lifting gear after 1. Falling load. Slow down to lower the sling wire & ensure the
the load are secured / safely Beban terjatuh. load are fully secured / safely landing on the
landing on the Main Support and support RIGGER
each weldment shall completed RIGGER FOREMAN
30% of root and hotpass Perlahan-lahan menurunkan wayar sling dan A 2
CRANE OPERATOR
pastikan objek sudah selamat & stabil LIFTING SUPERVISOR
diletakkan di atas "support"
Membuka gear mengangkat
selepas beban selamat 2. Pinch point. Those rigger who are involved to have complete
diletakkan di atas Support Kecederaan pada jari. PPE (impact glove) before dismantle the lifting gear
Utama dan setiap "weldment" & to avoid touching the load.
harus diselesaikan sebanyak
30% untuk "root" and RIGGER
Rigger yang terlibat dalam aktiviti ini B 3 RIGGER FOREMAN
"hotpass" hendaklah memakai peralatan perlindungan LIFTING SUPERVISOR
yang lengkap & elakkan dari memegang beban.
Completion of activity
5 Lifting activity completed. 1. Trip and fall Conduct proper housekeeping.
Tersadung dan jatuh. RIGGER
Aktiviti mengangkat selesai. Lakukan pembersihan dengan betul. A 1 RIGGER FOREMAN
LIFTING SUPERVISOR
2. Rigging gear left at work area. Supervisor to ensure all riggers to do proper
Alatan tidak si kemas / di simpan. housekeeing and no rigging gear & tools left at
work place.
RIGGER
Supervisor perlu memastikan semua pekerja A 1 RIGGER FOREMAN
melakukan pembersihan dan tiada alatan
mengangkat yang tertinggal di kawasan kerja.