0% found this document useful (0 votes)
79 views1 page

Total Cost 78% 1 Bailey Bridge M 15.25 0.04 1 0.61 2 Causeway M 13.5 0.025 1 0.3375 3 Pontoon No. 1 2 4 8 4 Consultancy LS 1 0.05 1 0.05

The project cost is 15.1 Cr. The major items are Bailey bridge at 0.61 Cr, causeway at 0.3375 Cr, and pontoons at 8 Cr. These items constitute 59.6% of the total project cost of 9 Cr. Administrative costs such as consultancy, office, commission, taxes, and profit will amount to 3.81 Cr bringing the total project cost to 15.1 Cr.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views1 page

Total Cost 78% 1 Bailey Bridge M 15.25 0.04 1 0.61 2 Causeway M 13.5 0.025 1 0.3375 3 Pontoon No. 1 2 4 8 4 Consultancy LS 1 0.05 1 0.05

The project cost is 15.1 Cr. The major items are Bailey bridge at 0.61 Cr, causeway at 0.3375 Cr, and pontoons at 8 Cr. These items constitute 59.6% of the total project cost of 9 Cr. Administrative costs such as consultancy, office, commission, taxes, and profit will amount to 3.81 Cr bringing the total project cost to 15.1 Cr.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Project Cost 15.1 Cr.

Sl. No. Item Unit Quantity Unit Cost Nos. Total Cost (Cr.)
(Cr.)
Total Cost 78% 11.81
1 Bailey Bridge m 15.25 0.04 1 0.61
2 Causeway m 13.5 0.025 1 0.3375
3 Pontoon No. 1 2 4 8
4 Consultancy LS 1 0.05 1 0.05
Total 8.9975 9.00
% of Project Cost 59.6%
Less 22.0%
11.778
Office PC 0.9% 0.10
Commission 4.3% 0.50
VAT & AIT 17.0% 2.01
Overhead 0.0% 0.00
Profit 1.7% 0.20