Construction Cost Components
Approval Fees Cost
Approval cost is the first step in this regard which ensures smooth construction process. Usually, building material
takes up to 60% of total cost and includes raw materials needed for the job.
Approval cost is one of the crucial aspects of construction as it also takes up the significant amount of time to get
approved. Renox does this tedious task with ease and having ample experience in the field, the process is done
quite smoothly and relaxed way. With the right planning and following the norms needed, the approval is made to
be finalized in lesser time as possible.
Material Cost
Building material cost contributes nearly 50 to 60 percentage of the total construction cost of any building
construction project. Items used are Cement, Sand, Steel, Gravel, Bricks, Plumbing, Electrical, Tiles, Granite Slabs,
Paint, Wood, Timber, Glass etc.
Cost of Steel: Rs.65,000 per Ton, Sand: Rs.1,800 per Ton, Cement: Rs.380 per bag, Bricks: Rs.7 per piece,
Wooden Door Frame (Teak): Rs.8,000 per piece, Wooden Door Frames (Non Teak): Rs.4,500 per piece, Windows
(UPVC): Rs.525 per Sq Ft, Electrical Wires (1 sq mm): Rs.900 per 90 mtrs. etc...
Transport & Handling
Building materials are usually brought from far away distances or are manufactured elsewhere, hence need to be
transported to the site or the place where they are required for the construction project. Also, construction materials
are bulky and heavy hence costs more for transportation
Besides this, all of those construction materials are to be lifted to desired places, hence handling charges are
incurred which are labour charges for lifting and placing those materials for the work to happen.
Labour Charges
Labour charges or Workers cost is the second biggest cost factor of any construction project, including Hyderabad,
Bengaluru.
Right from the excavation to the final painting and cleaning of the site before handover to clients, every
construction activity is highly labour intensive and consumes lots of man hours to complete.
Tentatively, combined labour charges of all the works involved in a construction project contributes almost 35 to 40
percent of the total construction cost in Hyderabad.
Construction Cost Management
Planning & Control
Before you actually start your construction project, no matter how large or small it be, first have a clear idea about
your exact requirement from the new construction project on paper and then adhere to it fully in the whole process
thereafter to keep it in control and smoother progress of the work.
Allocate Budget & Adhere
As in any other projects, even in building construction work there is every chance of exceeding predetermined
budget for construction project unless you have a clear figure of budget in the first place and strictly manage your
spending while selecting materials, labour work and other costs.
Find Right Contractor
Identify right and competent contractor, company or service provider to undertake your New Construction project,
get everything in quote including the material selection along with budget and time line of completion and
milestones for payments for the material suppliers and labour contractors.
Itemized Construction Cost Calculators
Steel Cost
Cost Rs.65,000/- per ton.
Construction Area in Sft:
Total = Rs. 513000
Sand Cost
Sand Cost Rs.1,800/- per ton.
Construction Area in Sft:
Total = Rs. 249750
Gravel / Metal Stone
Gravel Cost Rs.450/- per ton.
Construction Area in Sft:
Total = Rs. 29700
Cement Cost
Cement Cost Rs.380/- per bag.
Construction Area in Sft:
Total = Rs. 359100
Bricks Cost
Brick Cost Rs.8/- per piece.
Construction Area in Sft:
Total = Rs. 155250
Electrical Cost
Conduits, Wires, Switches etc.
Construction Area in Sft:
Total = Rs. 195750
Plumbing Cost
Plumbing Material and Labour
Construction Area in Sft:
Total = Rs. 175500
Tiles Cost (All Flooring)
Vitrified Tiles, Ceramic Tiles, Parking Tiles.
Construction Area in Sft:
Total = Rs. 357750
Teak Door Frame & Shutter
Teak Wood Main Door Set.
Number of Pieces Required:
Total = Rs. 84000
Non Teak Frame & Flush Doors
Hard Wood Door Set.
Number of Pieces Required:
Total = Rs. 34400
Windows & Ventilators
UPVC Sliding Glass with Mosquito Screen.
Construction Area in Sft:
Total = Rs. 182250
Granite Stone Slabs
Granite of Rs.150 per Sq Ft.
Construction Area in Sft:
Total = Rs. 94500
Fabrication Charges
Grills, Fencing & Gate.
Construction Area in Sft:
Total = Rs. 182250
Painting Charges (Putty Finish)
Asian Paints Brand (Premium).
Construction Area in Sft:
Total = Rs. 256500
Glass & Mirrors
Saint Gobain Brand.
Construction Area in Sft:
Total = Rs. 37800
Construction Cost Specification
Cost Per Sq
SNo. Brief Details of Construction Costs
Ft.
A Construction Cost
Civil: Foundation, Columns, Beams, Slab, Stairs, Brick work, Plastering - per Sq Ft of Floor Rs.880 to
1
Area. Rs.1250
Finishing Materials: Plumbing, Electrical, Flooring, Tiles, Granite/Marble, Doors, Windows, Rs.550 to
2
Painting, Steel Fabrication - per Sq Ft of Floor Area. Rs.1850
Rs.1430 to
B Total:
Rs.3100
Material Cost Specifications
SNo. Brief Details of Materials
Civil: Foundation, Columns, Beams, Slab, Stairs: 53 Grade ISI marked cement, steel. Corse sand and
1
appropriate gauge granite gravel.
Brick Work: Normal Machine Cut Bricks for Ground Floor, Light weight Machine Cut Bricks from First Floor
2
Level Onwards.
Plastering: Appropriate admixture of cement and sand in two coats of plastering with a smooth finish on
3
second coat surface.
Plumbing: Flowguard Technology - Ashirwad/Astral CPVC Hot/Cold pipes for water inlet, Appropriate
4 gauge of PVC pipes for Drainage outlet piping. ISI mark plumbing fittings. WC's, Wash Basins, Diverters,
Taps, Angle Cocks, Health Faucets etc. (These items can alter the final cost)
Electrical: ISI marked - FRLS (Fire Retardant Low Smoke) cables of appropriate gauge and thickness of
5 Finolex/Finecab/Polycab Brand, ISI marked MCBs of Appropriate Values, Modular Switches, Sockets and
Dimmers of Anchor/GoldMedal/GM Brand (These items can alter the final cost)
6 Flooring: Granite: Rs.100/- per Sq Ft where ever used as flooring. (These items can alter the final cost)
Tiles: Vitrified Tiles where ever used as flooring, Wall Tiles, Exterior Cladding Tiles. (These items can alter
7
the final cost)
Doors: Main Door Frame and shutter in Indian Teak. Internal Door frames in Hard wood and Laminated
8
Flush doors or Panel Doors as shutters. (These items can alter the final cost)
Windows & Ventilators: UPVC windows and Ventilators with warrantee. (These items can alter the final
9
cost)
Painting: Smooth Putty Finish on internal surface with two coats of Asian Paints Premium Emulsion Paint
10 in Roller Finish, Doors, Window Grills, Railings & Gate in Asian Paints Satin Enamel paint in Roller Finish.
Exterior Front Elevation in Texture finish. (These items can alter the final cost)
Steel Fabrication: ISI marked steel for Window grills, Railings for balcony and stairs, Gate. (These items
11
can alter the final cost)
Team Renox.in wishes you and your Family a very Happy & Pleasant New Home!
Construction Cost For 1400 Sft
Details Cost
Concrete Structure - Steel, Sand, Cement, Gravel, Labour Cost 600,000
Brick Work - Walls - Bricks, Sand, Cement, Labour Cost 580,000
Electrical & Plumbing - Materials & Labour Cost 370,000
Doors & Windows - Materials & Labour Cost 110,000
Flooring - Tiles - Granite - Materials & Labour Cost 280,000
Painting & Polishing - Materials & Labour Cost 230,000
Fabrication & Glass - Materials & Labour Cost 70,000
Total 2,240,000