Incoming Inspection

This document provides an incoming inspection procedure for specified materials. It outlines that the Engineering Manager is responsible for maintaining the procedure. It references quality standards for incoming inspection and defines items exempt from inspection. Items flagged for inspection will be inspected according to sampling plans based on an international quality limit standard. Non-conforming materials will be tagged and processed according to another quality procedure. The document describes the inspection process, including inspecting for shelf life, flagging items for inspection, notifying quality control, locating items for inspection, and handling adhesive materials.

Uploaded by

GAURAV SHARMA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views1 page

Incoming Inspection

This document provides an incoming inspection procedure for specified materials. It outlines that the Engineering Manager is responsible for maintaining the procedure. It references quality standards for incoming inspection and defines items exempt from inspection. Items flagged for inspection will be inspected according to sampling plans based on an international quality limit standard. Non-conforming materials will be tagged and processed according to another quality procedure. The document describes the inspection process, including inspecting for shelf life, flagging items for inspection, notifying quality control, locating items for inspection, and handling adhesive materials.

Uploaded by

GAURAV SHARMA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Document Part No.

Rev Page
100-0044 007 1 of 11

INCOMING INSPECTION PROCEDURE

1.0 PURPOSE

To establish instructions for incoming inspection of specified materials.

2.0 SCOPE & RESPONSIBILITY

The scope of this work instruction is to list, document, and Reference the required procedure for Incoming Inspection of mate rial LOTS. The
Engineering Manager is responsible for the maintenance of this procedure.

3.0 REFERENCES

 ISO_2859: Acceptable Quality Limit (AQL) Incoming Inspection


 N CM R P r o c e d u r e Q A -1 0 6 9

4.0 DEFINITIONS

4.1 Items exempt from incoming inspection shall be those that are not associated with the development, production, and/ or
quality of manufactured finished good assemblies. Such items include:

 Office Supplies, Consumable, Janitorial Supplies, Educational Materials

4.2 If sample size cannot be determined via the AQL II (2.5), the ENTIRE LOT shall be inspected.

4.3 Unless otherwise specified via explicit inspection requirements for a particular item, items flagged for incoming inspection
shall be inspected to the following SAMPLING PLAN based on ISO 2859 AQL Incoming Inspection

4.4 All Non-conforming Material must be tagged and processed per NCMR process QA-1069

5.0 PROCEDURES

Note: ERP Locations and markings of physical locations are subject to change, shown only for reference.

5.1 Inspect items for shelf life criteria (if applicable) -Receiving

5.2 Flag items for Incoming Inspection - Engineering


 Materials purchased that have parameters and/ or requirements explicitly outlined in Purchase Specifications,
Engineering Specifications, and/ or drawings shall be flagged at the ITEM MASTER level by engine ering for incoming
inspection prior to placing in inventory.
5.3 Quality Control notified

 If flagged, QC incoming personnel are notified via email notification that items have been received and are ready
for inspection.

5.4 Items to be inspected & Location

 Items are located near the warehouse receiving area on a shelf marked as QC INCOMING" material.
 ERP location: is QC-INCOMING_COP/ QC_INCOMING_FIB.

5.5 Adhesive materials

 Located in the EPOXY PENDING APPROVAL" cabinet located in the indoor fiber production area.
 ER P Loc a tion: QC -IN COMI NG_E PX .

All printed copies of this document are uncontrolled - Document Control System contains the most current revision.