The document is a permit for hot work issued by Sobha Ltd. It provides details of a hot work job such as the project name, location of work, date and time the permit is valid. It lists safety precautions taken including fire extinguishers, PPE, checking for hazards, cordoning off the area. It also lists details of workers performing the job and signatures of the permit issuer and receiver to acknowledge the safety instructions are understood.

Uploaded by

Nibha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
281 views2 pages

Work Permit - Hot Work

The document is a permit for hot work issued by Sobha Ltd. It provides details of a hot work job such as the project name, location of work, date and time the permit is valid. It lists safety precautions taken including fire extinguishers, PPE, checking for hazards, cordoning off the area. It also lists details of workers performing the job and signatures of the permit issuer and receiver to acknowledge the safety instructions are understood.

Uploaded by

Nibha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Sobha Ltd.

SDL/EHS/056

Sobha Ltd
PERMIT FOR HOT WORK
Project: Location of work in site:
Date: Permit valid from _______ hrs to ________ hrs.

Description of work :
A) Precaution taken by Permit issuer:
Sr. Check Points Yes No NA
1 Fire extinguisher provided.
2 Relevant PPEs (helmets, safety belt, and welding shield)
provided to the operator.
3 Area checked for identifying any fire hazards.
4 Area cordoned off and guarded against the
unauthorized entry.
5 Sufficient display or warning board provided.
6 Fire bucket (with sand and water) provided.
7 All electrical cables checked.
8 Proper earthing provided.
9 Flash arrester provided for gas cutting equipment.
10 LPG, Acetylene, Oxygen cylinders kept separately and
safely.
11 Sound scaffolding provided for work at height.
12 Proper ventilation provided to ensure that there is no
choking hazard.
*This permit shall not be used in Windy or rainy condition.
B) Special precaution, If any:

C) Details of the person performing the work


Name Age
1.
2.
3.
4.
5.

Version 1.0 Page 1 of 2


Sobha Ltd. SDL/EHS/056

D) Issue
1) We have checked and satisfied ourselves that the above particulars are correct and it is
safe to the work.
2) We will ensure proper safety supervision till end of the work
Name of Permit Issuer: Date: Signature:
E) Receipt:
I have understood all the instruction given to me and I will take all the precautions till the job is
completed
Permit issued to: Date: Signature:
F) Surrender:
Job is completed at.…….. Hrs and we hereby declare that all men under my charge are
withdrawn, tool and equipments cleared from the area of the work.
Signature: Date:

Special Instructions:
1. This permit shall be available at the work site at all times.
2. Location and description of work must be clearly indicated by the permit issuer.
3. All precautions given in permit must be strictly adhered to by the person to whom permit is
issued.
4. Permit shall be issued for maximum one day only. Extension shall be valid for one additional
day only.
5. After completion of work, used permits shall be preserved for record purpose up to 6 months.

Permit extension:
Date - Signature: Permit Issuer -
Validity from ________ hrs to ________ hrs. Signature: Permit issued to -

SL PERMIT ISSUING AUTHORITY ISSUING Checking


NO (In Normal Working AUTHORITY Authority
Days) (On Holidays)
1 Hot work permit Plumbing Project In - Charge
Engineer/Supervisor
2 Excavation permit Project In - Charge Project In - Charge

3 Work at height Block in charge / Site Block in charge /


Engineer/ Supervisor Project Manager QST

4 Confined Space Site Engineer/ Supervisor Project Manager

Version 1.0 Page 2 of 2